| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.4 LAccepted-Finance | ₹32.4 L | L1 | Accepted-Finance L1 |
| 2 | L2₹32.5 LRejected-Finance | ₹32.5 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | KAMARAJ L1 | ARAVIND MUGESH L2 |
|---|---|---|---|---|---|
| 1.00Construction of Community Hall at Duraisamypuram Village in Kulaiyaneri Panchayat in Kadayanallur Panchayat Union | |||||
| 2.00 | Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B | 64.55 | cum | 263.5 ₹17,008.93 | 264 ₹17,041.20 |
| 3.00 | Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for corewall as per SS 20B | 1.98 | cum | 197.5 ₹391.05 | 198 ₹392.04 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete | 26.37 | cum | 5,430 ₹1.4 L | 5,431 ₹1.4 L |
| 5.00 | Random Rubble Measonry in CM 1:5 mix using required bond stone with simulataneous pointing including all cost and conveyance and all labour charges etc., complete. | 2.23 | cum | 5,782 ₹12,893.86 | 5,783 ₹12,896.09 |
| 6.00 | Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete | 53.96 | cum | 6,116.5 ₹3.3 L | 6,117 ₹3.3 L |
| 7.00 | Refilling the basement with excavated earth including all labour charges such as watering and ramming etc., complete as per standard specification. | 62.25 | cum | 45.5 ₹2,832.38 | 46 ₹2,863.50 |
| 8.00 | Supplying and filling of conveyed Earth by lorry in basement filling including stacking for premeasurement, conveyance loading, and unloading charges and all other incidential charges and including filling laying watering and consolidating etc., complete. | 42.7 | cum | 168 ₹7,173.60 | 169 ₹7,216.30 |
| 9.00Centering charges for RCC works including all cost and conveyance all materials to site etc., complete. | |||||
| 10.00 | i) Upto Basement | 88.12 | sqm | 547 ₹48,201.64 | 548 ₹48,289.76 |
Tender Value
₹33 L
EMD Value
₹82,500
Closing Date
28 Jan 2026, 4:00 pmClosed
BDO
BDO,Kadayanallur
Construction of Community Hall at Duraisamypuram Village in Kulaiyaneri Panchayat in Kadayanallur Panchayat Union, Tenkasi District under MLACDS 2025 - 2026
2026_RDTN_643855_1
BDOKNR/208/2025-A3
Open Tender
Civil Works - Buildings
180 days
Kadayanallur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹82,500
18 Feb 2026
19 Jan 2026
28 Jan 2026
19 Jan 2026
28 Jan 2026
19 Jan 2026
Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B
Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for corewall as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete
Random Rubble Measonry in CM 1:5 mix using required bond stone with simulataneous pointing including all cost and conveyance and all labour charges etc., complete.
Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete
Refilling the basement with excavated earth including all labour charges such as watering and ramming etc., complete as per standard specification.
Supplying and filling of conveyed Earth by lorry in basement filling including stacking for premeasurement, conveyance loading, and unloading charges and all other incidential charges and including filling laying watering and consolidating etc., complete.
Centering charges for RCC works including all cost and conveyance all materials to site etc., complete.
i) Upto Basement
ii) Above Basement
Supplying and fabrication of steel including all cost and conveyance and all labour charges for cutting, bending, tieing and placeing in position etc., complete.
RCC 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete excluding cost of steel without centering.
Paving the floor with best quality Stain free Nano Polish Vetrified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification.
Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete.
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing the walls with glazed square tiles of 150 x 150 x 6mm in cm 1:2 mix, 10mm thick and pointing with white cement 0.4kg per in mixed with colour pigment with all cost.
Ceiling Painting 2 Coats 3mm thick including all cost and conveyance of all materials and all labour charges etc., complete
Plastering with CM 1:5 mix using to 12mm thick including all cost and conveyance of all materials and all labour charges etc., complete
Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc., complete.
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight.
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete.
Distempering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc., complete.
Exterior Emulsion painting two coats with best approved quality and colour emulsion paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting with approved colour including cost and conveyance and labour charges etc., complete.
Provision for Electrification works
a)SD142 (DPIC Switch)
b)SD 125 (Meter Board)
c)SD 65 (Service wire)
d)SD18 (Light/Fan Point)
e)SD 83 (Supply of CFL Lights with cover)
f)SD 88 (Supply of Tube light fittings)
g)SD 110 (Supply of ceiling fan)
h)SD 36 (Plug Point)
i)GI Pipes of 20mm dia
Labour charges for fixing in position of steel door etc., complete.
Labour charges for fixing in position of steel window,Ventilator etc., complete.
Supplying and fixing in positon IWC / EWC glazed earthern ware of approved quality and brand with "P" or "S" trap conforming to BIS and finishing the top to the required slope and including giving necessary connection to PVC pipes by dismantling brick masonry wall / reinforced cement concrete roof / floor slab and making good the dismantled portion to the original condition with leakages etc., complete complying with standard specifications and as directed by the departmental officers.
EWC (White)
Fabrication and supply of mild steel Door of any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete.
Door D (1.2 X 2.1)
Door D1 (0.75 X 1.8)
Fabrication and supply of mild steel Window of any size with single leaf outer frame,mullion section made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete.
Window W (1.2 X 1.3)
Ventilator V (0.9 X 0.45)
Dry Brick work using third class country bricks including all cost and conveyance of materials and labour charges etc., complete.
Collection and supply of 40mm HBG metal and filling in to the Soak Pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications.
Supply & fixing in position of RCC precast slabs of 75mm thick etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_771503.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_771503.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid