Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC 330 GUGERA ADUPUR ROAD NEAR BHAGAT SINGH ITI VPO ALLIKA PALWAL PALWAL HARYANA 121102 UDYAM HR 20 0037339 | PALWAL | HARYANA | 121102 | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.2 L+₹8,280.30 (2.02%)Rejected-Finance | L2 | Rejected-Finance Higher Bid | |
| 3 | L3₹4.2 L+₹12,379.46 (3.02%)Rejected-Finance | L3 | Rejected-Finance Higher Bid |
Tender Value
₹4.1 L
EMD Value
₹8,198
Closing Date
25 Feb 2026, 3:00 pmClosed
Assistant Engineer, Cob. Hway Sub-Divn-II
Office of the Assistant Engineer, Cob. Hway Sub-Divn-II
Emergent repairing and restoration of rain cut in stretch 0.00km to 4.00km on Chetra Chekapdera Bazar (13th kmp of Dinhata-Balarampur road) to Nazirhat Bazar road via balakura new bazaar road under Cooch Behar Highway Division
2026_WBPWD_1009227_1
NIT10/AE/2025-26/CHSD-II/PWRD
Open Tender
CIVIL WORKS
Percentage
10 days
Cooch Behar
Please refer Tender documents.
5 documents required · 5 mandatory
₹8,198
Yes
23 Sept 2026
18 Feb 2026
27 Feb 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Close Bamboo Walling made of 65mm to 75mm dia. bamboos (in single line) driven about half-length into the ground side by side, with stout stays at an interval of 1m, 3nos. of half split bamboo runner of same dia fitted and fixed with nails etc. complete as per
direction. (Measurement to be taken along the length of piling after finishing the works).With bamboos of length above 2.50m and upto 3.00m | 191 | m | 587 | ₹1,12,117 |
| 2 | Supplying empty Cement bags in good condition & Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete | 5,062 | nos | 21.14 | ₹1,07,010.68 |
| 3 | Earthwork in excavation from borrow pits (land owned/arranged by the Department) and depositing in layers of 250 mm. including breaking clods in embankment works and to fill up back of abutments, depressions and ruts with an initial lead up to 50 m and
initial lift up to 1.5 m making bunds at top as directed dressing complete. (Borrow pit measurement) with In ordinary soil | 573 | cum | 124.2 | ₹71,166.6 |
| 4 | Construction of Sub Base using Local Materials,spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).For Construction of Sub Base by compacting river bed materials.without using motor grader and rotavator | 42.98 | cum | 1,248.32 | ₹53,652.79 |
| 5 | Add GST @ 18% on Rs.343947.070 i.e. total amount over item no.1 to 4 | - | % | 18 | - |
| 6 | Add lobour welfare cess @ 1% of Rs.405857.540 i.e. total amount of item no.1 to 5 | - | % | 1 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 12.52 MB
Tendernotice_2.pdf
PDF • 2.22 MB
BOQ_2478365.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .