| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.8 LAccepted-AOC | L1 | Accepted-AOC Quoted rates are reasonable and being L1 in the bid | |
| 2 | L2₹47.0 L+₹1.4 L (3.02%)Rejected-Finance | L2 | Rejected-Finance Quoted rates are higher than L1 | |
| 3 | L3₹49.3 L+₹3.7 L (8.05%)Rejected-Finance | L3 | Rejected-Finance Quoted rates are higher than L1 | |
| 4 | L4₹49.6 L+₹3.9 L (8.62%)Rejected-Finance | L4 | Rejected-Finance Quoted rates are higher than L1 | |
| 5 | Rejected-Technical | - | Rejected-Technical One class below. Not enlisted in category b(ii). Hence not recommended |
| Sl No | Description | Qty | Unit | M/S Lucky Builders L1 | M/s MATRI ENTERPRISES L3 | PERFECT BUILDERS AND SUPPLIERS L2 | commercial enterprises L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | M& L for opening up the top cover of transformer taking out the transformer oil in a separate container after disconnecting the HT/LT side electric connections from both the primary & secondary side of the transformer of any type/description (indoor/out door type) installed on pole/floor, for carrying out necessary repair/rewinding to HT/LT side after shifting the transformer to workshop including taking out complete core assembly, megger testing the defective winding portion/taking out, cleaning the laminated core and rewinding with appropriate gauge/winding wire/strip winding of existing description for transformer of capacity 63KVA to 100 KVA including assembling & testing on completion & reinstallation the same at the site complete all as specified and directed. Note:- (a) Winding of coil shall be measured and paid seperately under respective item. (b) All the T&P required for disconnection, connection, arrangement of transportation, suitable capacity of crane for loading and unloading including necessary petty items like bolts, nuts etc will be arranged by the contractor and rates for the same shall have deemed to be included in the quoted rate. (c) The cost for the dehyderation of transformer oil if required shall be measured and paid seperately. (d) The cost of insulation material such as paper, cotton tape, latheriod sheet, cork sheet etc are included in the quoted rate. (e) Proper shut down shall be taken by the contractor before execution of the work.
(f) The repairs shall be carried out by authorised workshop of OEM only. | 1 | Each job | 57,400 ₹57,400 Lowest | 57,600 ₹57,600 | 57,600 ₹57,600 | 59,400 ₹59,400 |
| 2.00 | M& L for opening up the top cover of transformer taking out the transformer oil in a separate container after disconnecting the HT/LT side electric connections from both the primary & secondary side of the transformer of any type/description (indoor/out door type) installed on pole/floor, for carrying out necessary repair/rewinding to HT/LT side after shifting the transformer to workshop including taking out complete core assembly, megger testing the defective winding portion/taking out, cleaning the laminated core and rewinding with appropriate gauge/winding wire/strip winding of existing description for transformer of capacity 160KVA to 250 KVA including assembling & testing on completion & reinstallation the same at the site complete all as specified and directed. Note:- (a) Winding of coil shall be measured and paid seperately under respective item. (b) All the T&P required for disconnection, connection, arrangement of transportation, suitable capacity of crane for loading and unloading including necessary petty items like bolts, nuts etc will be arranged by the contractor and rates for the same shall have deemed to be included in the quoted rate. (c) The cost for the dehyderation of transformer oil if required shall be measured and paid seperately. (d) The cost of insulation material such as paper, cotton tape, latheriod sheet, cork sheet etc are included in the quoted rate. (e) Proper shut down shall be taken by the contractor before execution of the work.
(f) The repairs shall be carried out by authorised workshop of OEM only. | 1 | Each job | 67,520 ₹67,520 Lowest | 69,600 ₹69,600 | 67,650 ₹67,650 | 69,650 ₹69,650 |
| 3.00 | M& L for opening up the top cover of transformer taking out the transformer oil in a separate container after disconnecting the HT/LT side electric connections from both the primary & secondary side of the transformer of any type/description (indoor/out door type) installed on pole/floor, for carrying out necessary repair/rewinding to HT/LT side after shifting the transformer to workshop including taking out complete core assembly, megger testing the defective winding portion/taking out, cleaning the laminated core and rewinding with appropriate gauge/winding wire/strip winding of existing description for transformer of capacity 315KVA to 400 KVA including assembling & testing on completion & reinstallation the same at the site complete all as specified and directed. Note:- (a) Winding of coil shall be measured and paid seperately under respective item. (b) All the T&P required for disconnection, connection, arrangement of transportation, suitable capacity of crane for loading and unloading including necessary petty items like bolts, nuts etc will be arranged by the contractor and rates for the same shall have deemed to be included in the quoted rate. (c) The cost for the dehyderation of transformer oil if required shall be measured and paid seperately. (d) The cost of insulation material such as paper, cotton tape, latheriod sheet, cork sheet etc are included in the quoted rate. (e) Proper shut down shall be taken by the contractor before execution of the work.
(f) The repairs shall be carried out by authorised workshop of OEM only. | 1 | Each job | 75,700 ₹75,700 Lowest | 76,960 ₹76,960 | 75,820 ₹75,820 | 77,850 ₹77,850 |
| 4.00 | Material and labour for rewinding of HT/LT transformers by winding the defective coils with copper wire as of same gauge and existing size together with new material and aluminium bracings beore placing into the transformer and assembling the HT/LT coil with new insulation between core and LT coil and fixing the coil in the chamber, including insulating materials such as cotton tape, packing and sleeves etc varnishing by vaccum impregnation and baking of coil core assembly for copper wound transformer upto 400 kva, testing and commissioning the transformer and recording the test result upto satisfaction levels of Engr-in -Charge complete all as specified and directed. | 250 | Kg | 1,925 ₹4,81,250 Lowest | 2,255 ₹5,63,750 | 1,962 ₹4,90,500 | 2,260 ₹5,65,000 |
| 5.00 | Supply and fix in repairs HT bushing rod complete with insulator and packing suitable for out door/Indoor type upto 400 KVA, 11KV rating transformers confirming to IS- 334 complete with nut, bolts, brass studs and gasket of synthetic rubber bonded cork sheet all as specified and directed by Engr-in-Charge.
Notes :-
(i) Rates quoted by the contractor shall be deem to include for opening of top plate of transformer / decanning of oil from transformer up to the level as per requirement and assemble the same after replacement of bushing rod complete all as specified and as directed.
(ii) Bushing rod shall be replaced at site. transformer will not be allowed to send to workshop at any cost and all bushing replacement work shall be executed at site only. | 12 | Set of three | 6,235 ₹74,820 Lowest | 6,670 ₹80,040 | 6,252 ₹75,024 | 6,650 ₹79,800 |
| 6.00 | Supply and fix in repairs LT bushing complete with insulator and packing suitable for 1100 volts grade complete with nut bolts, brass studs, insulator and gasket etc suitable for upto 400 KVA, 11 KV rating out door/Indoor transformer complete all as specified and as directed.
Notes :-
(i) Rates quoted by the contractor shall be deem to include for opening of top plate of transformer / decanning of oil from transformer up to the level as per requirement and assemble the same after replacement of bushing rod complete all as specified and as directed.
(ii) Bushing rod shall be replaced at site. transformer will not be allowed to send to workshop at any cost and all bushing replacement work shall be executed at site only. | 12 | Set of three | 4,490 ₹53,880 Lowest | 5,693 ₹68,316 | 4,530 ₹54,360 | 5,590 ₹67,080 |
| 7.00 | Material and labour for maintenance, servicing & Oil Leakage arresting upto 400 KVA, 11KV rating, Distribution Transformer, providing necessary gaskets, Oil Seals, cleaning, dusting, decarbonising, tightening loosened parts, including replacing worn out part copper studs, bolts nuts and washers replacing oil Seals, HT bush, gasket including unserviceable coil, replacing of defective minor items such as and when required complete all as specified and as directed.
NOTE:- Oil to be replaced shall be measured and paid separately, However minor items such as gasket, nut and bolt shall be deemed to be included in the unit rate. The quoted rates are inclusive of crane charges for lifting and re assembling from the structure. | 14 | Each Job | 15,150 ₹2,12,100 Lowest | 17,260 ₹2,41,640 | 15,250 ₹2,13,500 | 16,250 ₹2,27,500 |
| 8.00 | Supply and filling of New transformer oil confirming to IS 335-1963 as amended and die electric strength not less than 60 KV for topping replacement of unserviceable transformer oil complete all as specified and as directed. | 1,600 | Ltr | 305 ₹4,88,000 Lowest | 314 ₹5,02,400 | 315 ₹5,04,000 | 320 ₹5,12,000 |
| 9.00 | M& L for Purification, filtration and Dehydration of transformer oil of transformer installed at various indoor/outdoor sub station by ultra high vacuum filtration machine with stream line filtration plant at a temp 60 to 70 deg. Celsius and achieving minimum dielectric withstand strength of 60 KV for 1 minute in 2.5 mm gap setting (for used oil) complete all as specified and as directed by Engineer-in-Charge.
Note: (i) Contractor shall ensure no wastage of transformer oil. (ii) Oil required for topping up the transformer will be measured & paid separately. (iii) Contractor shall be ensure that the conservator tanks are full to its level before starting the dehydration | 6,500 | Ltr | 86 ₹5,59,000 Lowest | 99 ₹6,43,500 | 95 ₹6,17,500 | 98 ₹6,37,000 |
| 10.00 | Material and labour for painting distribution transformer with two coats of synthetic enamel paint of smoke grey colour after neatly cleaning and preparing the surface for the transformer including all bus ducts of capacity up to 400 KVA including writing SM / MES No (5 cm height) with white enamel paint complete all as specified and as directed. | 20 | Each Job | 2,750 ₹55,000 Lowest | 2,975 ₹59,500 | 2,790 ₹55,800 | 2,860 ₹57,200 |
Tender Value
₹42 L
EMD Value
₹84,000
Closing Date
24 Sept 2025, 6:55 pmClosed
Col Amit Chaubey
HQ 137 Wks Engr PIN 914137 c/o 99 APO
REPAIR /MAINT OF REWINDING OF TRANSFORMER,PAINTING AND IMPROVEMENT OF HT SUB STATION WITH CONNECTED ACCESSORIES AT RMS
2025_MES_729261_1
8079/E8
Open Tender
Civil Works
Item Rate
180 days
Dimapur
As per tender documents
6 documents required · 6 mandatory
₹500
GE 868 EWS
₹84,000
Yes
10 Nov 2025
3 Sept 2025
1 Oct 2025
3 Sept 2025
24 Sept 2025
17 Sept 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .