| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC 0 SHANKERPURI COLONY SAHARANPUR BEHAT ROAD NEAR DEHAT KOTWALI SAHARANPUR UTTAR PRADESH 247001 | SAHARANPUR | UTTAR PRADESH | 247001 | L1 | Accepted-AOC TC Recommendation | |
| 2 | L2₹5.6 L+₹44,604 (8.73%)Rejected-Finance 100 33 1 R G S ROAD USHAGRAM SALANPUR 713303 WEST BENGAL INDIA | ASANSOL | PASCHIM BARDHAMAN | WEST BENGAL | 713303 | L2 | Rejected-Finance TC Recommendation | |
| 3 | L3₹6.1 L+₹97,586 (19.1%)Rejected-Finance | L3 | Rejected-Finance TC Recommendation |
Tender Value
₹5.1 L
EMD Value
₹6,400
Closing Date
25 Mar 2024, 3:00 pmClosed
General Manager
Office of The General Manager Bankola Area, PIN-713363
Complete conversion of 11kv 550 v 500 kva power transformer to 3.3 kv 550 v power transformer installation and commissioning of CM project at Nakrakonda kumardihi B colliery under bankola area.
2024_ECL_305043_1
ECL/GM/BA/E TENDER/23-24/EnM/430 Dt. 14.03.2024
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Nakrakonda Kumardihi B Colliery
Please refer to NIT document
5 documents required · 5 mandatory
₹6,400
8 May 2024
14 Mar 2024
26 Mar 2024
14 Mar 2024
25 Mar 2024
14 Mar 2024
14 Mar 2024 - 18 Mar 2024
Amount
Item Description/ Heading
Dismantaling of core and winding from the transformer tank and cleaning of all parts of transformer property
Cost of bare super enamelled copper conductor for primary winding
Cost of bare super enamelled copper conductor for secondary winding
cost of TPC for bar copper conductor
Cost of insulator material cotton tape glass tape pacement paper synthetic cork sheet nomex paper
Cost of DA oxygen brazing rod
Cost of neoprene synthetic gasket at top cover inspection cover
Dehydration and filtration of transformer oil to raise the dielectric strenght ofoil top up to required value
cost of primary terminal bushing with current carrying cantacts
design charges of above transformer from 11kv 550 v to 3.3 550 v
Labour charges for formation of coil assy of coil and interconnection
cost of painting of the transformer by one coat of primer paint and two coat of metalic paint
Dismantling and assembling of the above transformer with pre commissioning testing such as 1. insulatiion resistance test2 high voltage pressure test3 vector group test4magnatic balance test 5voltage ration on all tap position 6 di electric test of trsnsformer oil 7 transformer oil acidity test
Cost of secondary terminalbushing with current carrying contacts
Total impact of GST for the purpose of CTC
ELECTRO POWER INDUSTRIES
CITY ELECTRIC
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .