| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAdmitted-Finance | ₹9.5 L | L1 | Admitted-Finance |
| 2 | L2₹9.5 L+₹1,369.50 (0.14%)Admitted-Finance | ₹9.5 L+₹1,369.50 (0.14%) | L2 | Admitted-Finance |
| 3 | L3₹11.4 L+₹1.9 L (20.2%)Admitted-Finance | ₹11.4 L+₹1.9 L (20.2%) | L3 | Admitted-Finance |
| 4 | L4₹11.9 L+₹2.3 L (24.6%)Admitted-Finance | ₹11.9 L+₹2.3 L (24.6%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K.MADHUKAR L3 | NARAYANAN AND SONS L4 | VAI KUMAR CONTRACTOR L2 | THIRU ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|
| 1.00Cleaning the storm water drain when and wherever required including collection of all unwanted leaves, small plants, silt and other unwanted debris etc. upto initial lead 200m and stacking for disposal upto 5km lead at place specified by Engineer, all complete as directed by the Engineer-in-Charge. | |||||||
| 1.01 | Width above 500mm upto 1000mm wide with out cover slab | 12,120 | Metres | 2 ₹24,240 Lowest | 7 ₹84,840 | 4 ₹48,480 | 5.5 ₹66,660 |
| 1.02 | Width above 1000mm upto 2000mm wide with out cover slab | 15,900 | Metres | 3 ₹47,700 Lowest | 7.5 ₹1,19,250 | 5.5 ₹87,450 | 6.15 ₹97,785 |
| 1.03 | Width above 2000mm upto 6000mm wide with out cover slab | 4,615 | Metres | 4 ₹18,460 Lowest | 8 ₹36,920 | 7 ₹32,305 | 6.7 ₹30,920.5 |
| 2.00 | Sweeping and Cleaning the road surfaces including water table, road junction & pavement on both sides of roads from new IGCAR gate to Main Gate complex area or IGCAR area or DAE Installations (as required by Engineer-in-Charge) two times in a Month or when and where ever required including collecting upto 200m and stacking swept material for disposal up to 4km Lead complete all as directed by the Engineer-in-Charge. Note: 1. Every time cleaning area shall be measured for payment. 2. The contractor shall engage minimum 2 numbers of workers daily as directed by the Engineer-in-charge. Failure to deploy the minimum numbers of labour will attract recovery with the minimum wages for every default of labour. 3. The contractor shall supply the necessary PPE to the workers. 4. The rate should also include sweeping tools etc. 5. The rate shall include the cost of hire charges of lorry and labour for transporting of sweeping materials to the dumping yard. | 10,00,000 | Sq.m. | 0.6 ₹6,00,000 | 0.5 ₹5,00,000 | 0.4 ₹4,00,000 | 0.3 ₹3,00,000 Lowest |
| 3.00 | Levelling, bull-dozing the heeped / dumped loosened earth / debris etc., by hiring JCB / Bull-dozer etc., including transporting, operating the vehicle, operating the vehicle by engaging driver/operator with valid driving license, diesel charges, insurance and admissible taxes, labour if any required etc. complete all as directed by Engineer-in-Charge. | 130 | Hours | 1,000 ₹1,30,000 Lowest | 1,000 ₹1,30,000 Lowest | 1,300 ₹1,69,000 | 1,250 ₹1,62,500 |
| 4.00Conveying the surplus excavated earth & debris, boulders and spoil by mechanical means and depositing at places inside DAE installation identified as Dumping yard as per requirement with a lead specified below including loading, unloading, breaking clods, levelling all complete as per specification and as directed by the Engineer-in-Charge. Note: 1) The rates in respect of this Item are applicable for the NET Quantities arrived at after making deductions for voids @ 20% in respect of soil and @ 50% in respect of Rock from the corresponding Stack / Truck measurements. 2) The earth shall be dumped well inside the Dumping yard and not over approach pathway road. | |||||||
| 4.01 | Lead charges for lead Exceeding 3 kilometre but not exceeding 4 kilometre | 300 | Cu.m. | 230 ₹69,000 | 300 ₹90,000 | 170 ₹51,000 Lowest | 200 ₹60,000 |
| 5.00 | Clearing blockage in storm water drain, mouth outlets, road side berm rain water pipes, cutting and removing of fallen trees etc, during the monsoon period, cyclone time and rainy days, and all other essential miscellanceous works etc., complete as directed by the Engineer-in-Charge. Note: 1. Contractor has to engage a minimum of 2 number of male coolies in each shift every day during the monsoon period, rainy days & cyclone period including holidays (Timing of shifts – General shift 9:00 hours – 17:30 hours ; 1st shift 6:00 hours to 14:00 hours ; 2nd shift 14:00 hours to 22:00 hours ; 3rd shift 22:00 hours to 6:00 hours) as directed by the Engineer. If any short fall found during the contract period he will be penalised at the rate of 1 Job/Male coolie/shift shall be deducted from the RA bills. 2. Providing all PPE like Raincoat, Gumboot, PVC Hand Gloves to the workers including necessary vehicle arrangements. 3. Providing hand torches to the workers during night time. | 300 | Units | 850 ₹2,55,000 | 750 ₹2,25,000 | 550 ₹1,65,000 Lowest | 780 ₹2,34,000 |
Tender Value
₹14.4 L
EMD Value
₹28,760
Closing Date
20 May 2026, 11:30 amClosed
Chief Engineer, CEG
Room No. 222, CDO Building, Indira Gandhi Centre for Atomic Research, Kalpakkam - 603102.
Cleaning of Storm water drains and roads from new IGCAR gate to Main gate, Kalpakkam during the year 2026 - 2027.
2026_IGCAR_907595_1
CEG/IGC/2191/2026
Open Tender
Civil Works
Item Rate
365 days
Kalpakkam
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹28,760
10 Jun 2026
6 May 2026
21 May 2026
7 May 2026
20 May 2026
8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cleaning the storm water drain when and wherever required including collection of all unwanted leaves, small plants, silt and other unwanted debris etc. upto initial lead 200m and stacking for disposal upto 5km lead at place specified by Engineer, all complete as directed by the Engineer-in-Charge. | |||||
| 1.01 | Width above 500mm upto 1000mm wide with out cover slab | 12,120 | Metres | - | - |
| 1.02 | Width above 1000mm upto 2000mm wide with out cover slab | 15,900 | Metres | - | - |
| 1.03 | Width above 2000mm upto 6000mm wide with out cover slab | 4,615 | Metres | - | - |
| 2 | Sweeping and Cleaning the road surfaces including water table, road junction & pavement on both sides of roads from new IGCAR gate to Main Gate complex area or IGCAR area or DAE Installations (as required by Engineer-in-Charge) two times in a Month or when and where ever required including collecting upto 200m and stacking swept material for disposal up to 4km Lead complete all as directed by the Engineer-in-Charge. Note: 1. Every time cleaning area shall be measured for payment. 2. The contractor shall engage minimum 2 numbers of workers daily as directed by the Engineer-in-charge. Failure to deploy the minimum numbers of labour will attract recovery with the minimum wages for every default of labour. 3. The contractor shall supply the necessary PPE to the workers. 4. The rate should also include sweeping tools etc. 5. The rate shall include the cost of hire charges of lorry and labour for transporting of sweeping materials to the dumping yard. | 10,00,000 | Sq.m. | - | - |
| 3 | Levelling, bull-dozing the heeped / dumped loosened earth / debris etc., by hiring JCB / Bull-dozer etc., including transporting, operating the vehicle, operating the vehicle by engaging driver/operator with valid driving license, diesel charges, insurance and admissible taxes, labour if any required etc. complete all as directed by Engineer-in-Charge. | 130 | Hours | - | - |
| 4Conveying the surplus excavated earth & debris, boulders and spoil by mechanical means and depositing at places inside DAE installation identified as Dumping yard as per requirement with a lead specified below including loading, unloading, breaking clods, levelling all complete as per specification and as directed by the Engineer-in-Charge. Note: 1) The rates in respect of this Item are applicable for the NET Quantities arrived at after making deductions for voids @ 20% in respect of soil and @ 50% in respect of Rock from the corresponding Stack / Truck measurements. 2) The earth shall be dumped well inside the Dumping yard and not over approach pathway road. | |||||
| 4.01 | Lead charges for lead Exceeding 3 kilometre but not exceeding 4 kilometre | 300 | Cu.m. | - | - |
| 5 | Clearing blockage in storm water drain, mouth outlets, road side berm rain water pipes, cutting and removing of fallen trees etc, during the monsoon period, cyclone time and rainy days, and all other essential miscellanceous works etc., complete as directed by the Engineer-in-Charge. Note: 1. Contractor has to engage a minimum of 2 number of male coolies in each shift every day during the monsoon period, rainy days & cyclone period including holidays (Timing of shifts – General shift 9:00 hours – 17:30 hours ; 1st shift 6:00 hours to 14:00 hours ; 2nd shift 14:00 hours to 22:00 hours ; 3rd shift 22:00 hours to 6:00 hours) as directed by the Engineer. If any short fall found during the contract period he will be penalised at the rate of 1 Job/Male coolie/shift shall be deducted from the RA bills. 2. Providing all PPE like Raincoat, Gumboot, PVC Hand Gloves to the workers including necessary vehicle arrangements. 3. Providing hand torches to the workers during night time. | 300 | Units | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
2191technicalbid.pdf
Tender Documents • 2.10 MB
2191Undertakingsandformoftender.pdf
Tender Documents • 0.22 MB
2191FormsACDFGHforfillinganduploading.xls
Tender Documents • 0.08 MB
BOQ_953929.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .