Loading…
Loading…
Tender Value
₹49.5 L
EMD Value
₹98,959
Closing Date
7 Oct 2026, 1:00 pm5d left
EXECUTIVE ENGINEER
OFFICE OF THE EXECUTIVE ENGINEER DIVISION XIX (BLDGS), P.W.D. SANGUEM-GOA
Repairs and replacement of plumbing work of existing toilet blocks of Govt. College Quepem in Quepem Constituency.
2026_PWD_32095_1
PWD/DIVISION XIX (Bldgs.)/ASW/F.4/2026-2027/09 LINE03
Open Tender
Civil Works - Buildings
Percentage
149 days
Repairs and replacement of plumbing work of existi
Repairs and replacement of plumbing work of existing toilet blocks of Govt. College Quepem in Quepem Constituency.
2 documents required · 2 mandatory
₹6,000
₹98,959
1 Oct 2026
1 Oct 2026
8 Oct 2026
1 Oct 2026
7 Oct 2026
1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading danger lighting guarding as directed in :; a)All kinds of soil | 120.96 | cu.m | 286 | ₹34,594.56 |
| 2 | Extra for additional depth of 1.5 m or part thereof in:; b)Saturated soil | 60.48 | cu.m | 62 | ₹3,749.76 |
| 3 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 8.06 | cu.m | 2,211 | ₹17,820.66 |
| 4 | Providing & laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded granitic or basaltic stone aggrt. 40 mm. nominal size) excluding cost of centering shuttering and finishing in:; a)All works upto plinth level | 6.05 | cu.m | 6,192 | ₹37,461.6 |
| 5 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. | 36.71 | cu.m | 5,186 | ₹1,90,378.06 |
| 6 | 12mm cement plaster 1:3 (1 cement : 3 fine sand) | 954 | sq.m | 238 | ₹2,27,052 |
| 7 | Extra for providing and mixing water proofing material proportion recommended by the manufacturers.; b)12mm cement plaster 1: 4 (1 cement : 4 sand) | 954 | sq.m | 8 | ₹7,632 |
| 8 | Providing water proofing treatment over the new R.C.C. roofs terrace toilet by spreading cement slurry over the R.C.C. slab and laying of 10cms. Average laterite stone ballast coba with the necessary gradient for easy flow of rain water and the coba in covered with damp proof of Hindustan water proofing co. Or equivalent jointless water proofing plaster of mix 1:3 ( 1 cement : 3 find sand) finished smooth with wooden trowel with false marking of 30 cms square. The vertical surface of the adjoining walls are to be treated upto a height of 30cms including rounding of junction (the rate includes for complete items including labour and materials and including cost of initial treatment of roof slab as follows. The injunction of damp proof or equivalent compound with cement solution will be given as and when found necessary for filling honey comb cracks etc. in the R.C.C. slabs). NOTE: cement consumption 25 kg/sq.m. | 30 | sq.m | 1,029 | ₹30,870 |
| 9 | Centering & shuttering including Strutting Propping & removal of forms for :; xiii)Suspended floors roofs landings shelves & their supports | 35.52 | sq.m | 644 | ₹22,874.88 |
| 10 | Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering shuttering finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size); a)All works upto plinth level | 4.37 | cu.m | 7,178 | ₹31,367.86 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
Tendernotice_2.pdf
PDF • 1.04 MB
Tendernotice_3.pdf
PDF • 0.50 MB
Tendernotice_4.pdf
PDF • 7.63 MB
BOQ_32480.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .