| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹58.8 LAccepted-AOC 134 SHANTI COLONY ETAWAH | ₹58.8 L | L1 | Accepted-AOC Preparation Bond for Rs. 5884968.48 Only |
| 2 | L2₹59.5 LRejected-Finance H NO 3 B M J COMPOUND NEAR BENARA FACTORY BODLA AGRA | AGRA | AGRA | UTTAR PRADESH | ₹59.5 L | L2 | Rejected-Finance Rejected due to higher Rates |
| 3 | L3₹62.4 LRejected-Finance 000 ATARDHAR RAMNA KAJIMOHD MUZAFFARPUR BIHAR 842002 UDYAM BR 23 0052765 | MUZAFFARPUR | BIHAR | 842002 | ₹62.4 L | L3 | Rejected-Finance Rejected due to higher Rates |
| 4 | L4₹64.0 LRejected-Finance | ₹64.0 L | L4 | Rejected-Finance Rejected due to higher Rates |
Tender Value
₹79.0 L
EMD Value
₹6.0 L
Closing Date
22 Jan 2026, 12:00 pmClosed
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
New Construction work of Bainai Kala to Awalkhera Road
2026_CEAGR_1106331_1
5907/14M-AC/2025 dated 15-12-2025
Open Tender
Civil Works
180 days
Agra
New Construction
2 documents required · 2 mandatory
₹2,360
₹6.0 L
Yes
Agra
29 May 2026
14 Jan 2026
22 Jan 2026
16 Jan 2026
22 Jan 2026
16 Jan 2026
19 Jan 2026
Excavtion for road work in soil with hydraculic excavator of 0.9 cumbucket capacity inculiding cutting and loading intippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and trasporting to the embankment location with a lift upto 1.5m amd lead upto1000 m as per technical Specifcation clause 302.3
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site. spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. including 2% cement (OPC) & its Mixing with Rotavater.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification Clause 405 including 4% cement (OPC) & its Mixing with Rotavater.
Providing and applying tack coat with bitumen VG-10 grade using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer and cleaned with hydralic broom as per technical specification clause 503.
Providing, laying and rolling of open - graded premix carpet of 20 mm Average thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade Bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a HMP, laying with Paver finisher and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades.
Providing and laying seal coat by mechanical means with VG-10 grade bitumen sealing the voids in a bituminious surface laid to the specified levels grades and cross fall using Type C as per technical specification Clause 510.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.SI No- 12.1 as per SOR Ch. 6 S. No- 1 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing.as per SOR Ch.6 S. No. 3 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) as per DSR 6.1.1 (7370.65) (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Laying NP-3 pipe 350 mm Dia RCC concrete pipe for culvert on first class in single row including fixing socket with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2900. per SOR Ch.5 S. No. 10 (b) (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Laying NP-3 pipe 600 mm Dia RCC concrete pipe for culvert on first class in single row including fixing socket with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2900. per SOR Ch.5 S. No. 10 (b) (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Pointing with cement mortar (1:3) on brickwork in substructure as per drawing and technical specification Clauses 1300 & 2200 as per SOR Ch.6 S. No. 19 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing and laying cement concrete in 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, Including cost of form work. In Foundation and floors. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Plastering with cement mortar 1:3 on brick work in sub-structure complete as per drawing and Technical Specifications Clauses 1300 & 2200 SOR Ch.6 S. No. 20 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Maintainance Charge including @ All Items total work amount etc as per Direction of E/I for the period of Five Years from the actual completion of work. (Total Amount for PC Work Sl No. 1 to 8 = 6423900.00)
Maintainance Charge including @ All Items total work amount etc as per Direction of E/I for the period of Five Years from the actual completion of work. (Total Amount for CC Work Sl No. 9 to 16 = 709474.00)
Maintainance of First Year (@ 0.00% of Total Work Amount of item 1 to 8)
Maintainance of First Year (@ 0.00% of Total Work Amount of item 9 to 16)
Maintainance of Second Year (@ 0.75% of Total Work Amount of item 1 to 8)
Maintainance of Second Year (@ 0.25% of Total Work Amount of item 9 to 16)
Maintainance of Third Year (@ 1.50% of Total Work Amount of item 1 to 8)
Maintainance of Third Year (@ 0.50% of Total Work Amount of item 9 to 16)
Maintainance of Fourth Year (@ 2.25% of Total Work Amount of item 1 to 8)
Maintainance of Fourth Year (@ 0.75% of Total Work Amount of item 9 to 16)
Maintainance of Fourth Year (@ 3% of Total Work Amount of item 1 to 8)
Maintainance of Fifth Year (@ 1% of Total Work Amount of item 9 to 16)
Note - 1- Rates are inclusive of all taxes but excluding GST which shall be paid extra as applicable 2- Labour cess @ 1% will be deducted from contractor's bill at the time of payment 3- Maintenance will be calculated on value of actual work done.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_2041142.xls
BOQ • 0.30 MB
T2-bainaitoawalkhera.pdf
Tender Documents • 4.23 MB
Download all tender documents and submit your bid