Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75.0 LAccepted-Finance | L1 | Accepted-Finance Low Rate | |
| 2 | L2₹75.1 L+₹6,591 (0.09%)Rejected-Finance | L2 | Rejected-Finance High Rate | |
| 3 | L3₹76.4 L+₹1.4 L (1.82%)Rejected-Finance A 1 BLOCK A ASTHA APRTMENT BHOJUBEER NEAR CIRCUIT HOUSE VARANASI UTTAR PRADESH 221002 UDYAM UP 75 0008931 | VARANASI | UTTAR PRADESH | 221002 | L3 | Rejected-Finance High Rate | |
| 4 | L4₹76.9 L+₹2.0 L (2.61%)Rejected-Finance | L4 | Rejected-Finance High Rate | |
| 5 | Rejected-Technical | - | Rejected-Technical NOT OK |
| Sl No | Description | Qty | Unit | M/s Sharada Electricals L4 | KRIPA ELECTRICAL WORKS AND SUPPLIER L2 | M/s Aghoreshwar Kripa Construction Co. L1 | M/S Grid Power Systems L3 |
|---|---|---|---|---|---|---|---|
| 1.00Supply of following Decentralized materials Provide by Contractor at the works site as per RESSPO norms. | |||||||
| 1.01 | Stone pad 300x300x75 mm | 187 | No. | 50 ₹9,350 | 130 ₹24,310 | 20 ₹3,740 Lowest | 65 ₹12,155 |
| 1.02 | X-arms holding clamps with bolts & nuts. | 50 | No. | 375 ₹18,750 Lowest | 1,100 ₹55,000 | 2,450 ₹1,22,500 | 871 ₹43,550 |
| 1.03 | F-bracket with bolts & nuts | 60 | No. | 375 ₹22,500 | 550 ₹33,000 | 1,950 ₹1,17,000 | 136.5 ₹8,190 Lowest |
| 1.04 | Top, Dropper channel clamp with bolts & nuts for ST Pole | 125 | No. | 375 ₹46,875 Lowest | 2,450 ₹3,06,250 | 1,150 ₹1,43,750 | 1,950 ₹2,43,750 |
| 1.05 | P.G clamps for weasel conductor | 168 | No. | 650 ₹1,09,200 | 80 ₹13,440 | 10 ₹1,680 Lowest | 52 ₹8,736 |
| 1.06 | Danger board with clamp & bolts | 74 | No. | 650 ₹48,100 | 80 ₹5,920 | 55 ₹4,070 Lowest | 195 ₹14,430 |
| 1.07 | Dead end clamp for pole/bracket with nuts & bolts | 80 | No. | 325 ₹26,000 | 220 ₹17,600 | 160 ₹12,800 Lowest | 195 ₹15,600 |
| 1.08 | Eye- Hook | 120 | No. | 325 ₹39,000 | 140 ₹16,800 | 60 ₹7,200 Lowest | 195 ₹23,400 |
| 1.09 | Suspension clamp with nuts & bolts | 532 | No. | 325 ₹1,72,900 | 210 ₹1,11,720 | 50 ₹26,600 Lowest | 104 ₹55,328 |
Tender Value
Refer Docs
EMD Value
₹93,000
Closing Date
26 Aug 2025, 3:00 pmClosed
SUPERINTENDING ENGINEER EDC MIRZAPUR
SUPERINTENDING ENGINEER EDC MIRZAPUR
Under the deposit scheme the work of shifting 11 KV line transformers of different capacities and LT line due to road widening from Dudhnath Tiraha to Lal Bhairav Mandir road and Bartar Tiraha road under EDD-Mirzapur.
2025_PVVNV_1064476_1
16/EDC(M)/2025-26
Open Tender
Electrical Works
Lump-sum
90 days
SUPERINTENDING ENGINEER EDC MIRZAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Executive Engineer(A)
₹93,000
2 Sept 2025
9 Aug 2025
27 Aug 2025
9 Aug 2025
26 Aug 2025
9 Aug 2025
Amount
Supply of following Decentralized materials Provide by Contractor at the works site as per RESSPO norms.
Stone pad 300x300x75 mm
X-arms holding clamps with bolts & nuts.
F-bracket with bolts & nuts
Top, Dropper channel clamp with bolts & nuts for ST Pole
P.G clamps for weasel conductor
Danger board with clamp & bolts
Dead end clamp for pole/bracket with nuts & bolts
Eye- Hook
Suspension clamp with nuts & bolts
Eye Hook for Suspension clamp
All. Binding wire 6 mm
Guarding Angle
Guarding Angle Clamp
Three phase Distribution Box
Three phase Distribution Box Clamp (LS)
E-bracket with nuts & bolts
Natural Cum earth wire
All lugs
ST-55 ST Pole 11 Mtr Long
11 KV TPMO
Cartage of following materials from ESC, Mirzapur to work site including loading & unloading charge.
ST Poles 11 mtr long Dump site to Pit Site
All Line materials with ACSR Dog Conductor (From store to Erection site)
Arial Bunch Cable 3x120+1x95+1x16 mm2 (From store to Erection site)
LT XLPE Cable 3.5X400 sqmm, (From store to Erection site)
Erection
Erection of single support ST Pole for construction of 11 KV line including digging of pit, fitting of all accessories, back filling of earth & others required work as per RESSPO norms.
Erection of single support ST Pole for construction of LT line including digging of pit, fitting of all accessories, back filling of earth & others required work as per RESSPO norms.
Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Earthing of Poles as per RESSPO norms
Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of ACSR Dog Conductor, binding with insulators & jumpering as per RESSPO norms
Laying, Streaching of Arial Bunch Cable size 3x120+1x95+1x16 mm2 as per RESSPO norms
Erection of Sectional Double Pole Structure of ST Pole for distribution T/F, including digging of pit, fitting of all accessories, earthing of Pole, back filling of earth, grouting of each pole & stay sets & other required works as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Construction of Transformer plinth for 400/250/100 KVA Transformer of 2x2x1.5 mtr. Including the work of excavation for foundation of plinth plastering of walls and finishing including cost of all materials.
Well type earthing of 400/250/100 KVA Transformer by using B class G.I. pipe of 1.5 " dia and making hand pipe type earth boring IInd strata of water or 60 ft. whichever is deeper about 6" of G.I. pipe shall remain above ground level 2 No. G.I. earth clamp shall also be welded to the portion of pipe which is above the ground level. Through this G.I. Clamp and G.I. Strip 30x5mm duly galvanized shall be connected with nut & bolts. Every DT shall have 2 such earthing, One earthing for T/F neutral and second earthing for T/F body. All requred materials shall by provided by the contractor.
Fencing of T/F 400/250/100 KVA with M.S. Square mesh welded/fixed on M.S. Angle of size 65x65x6 mm with gate hinges & shutter assembly, of over all size 3x3x2.5 mtr as per drawing including cost of all materials.
Shifting of 400 KVA Transformer as per RESSPO norms
Shifting of 250 KVA Transformer as per RESSPO norms
Shifting of 100 KVA Transformer as per RESSPO norms
Installation of 400 KVA Transformer as per RESSPO norms
Installation of 250 KVA Transformer as per RESSPO norms
Mounting of 100 KVA Transformer as per RESSPO norms
Fixing of Cable jointing kit
Dismentaling of 11 KV Line
Dismentaling of LT Line
Cartage of received back 11 KV Line Material from work site to ESC, Mirzapur including loading & unloading charge
Cartage of received back LT Line Material from work site to ESC, Mirzapur including loading & unloading charge
Underground Cable Laying along with cost for diging briks & sand for LT XLPE Cable 3.5X400 mm2
Overhead Cable Laying for LT XLPE Cable 3.5X400 mm2
Disconnection & Reconnection
Installation of 11 KV TPMO
KRIPA ELECTRICAL WORKS AND SUPPLIER (BID ID -5499184)
M/S Grid Power Systems (BID ID -5499324)
M/s Sharada Electricals (BID ID -5497317)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .