Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹421.0 CrAccepted-AOC | ₹421.0 Cr Quoted ₹563.7 Cr | L1 | Accepted-AOC Work Order Issued |
| 2 | L2₹719.5 CrRejected-Finance NCC HOUSE MADHAPUR HYDERABAD 500081 TELANGANA INDIA TELEPHONE 040 23268730 | ₹719.5 Cr | L2 | Rejected-Finance Accepted |
Tender Value
₹421.0 Cr
EMD Value
₹8.4 Cr
Closing Date
10 Jun 2022, 2:00 pmClosed
Spl. CE, PWD(Bldg) (H AND E) Assam, Ghy-3
O/O The CE, PWD (Bldg), Assam, Chandmari, Ghy-3
Construction of New Medical College and Hospital at Dhemaji, Assam
2022_PWBNH_25321_1
CE/TB-III/23/2022/5 Dated Guwahati 25th April 2022
Open Tender
Civil Works - Building
1095 days
Dhemaji
Please refer Tender documents.
5 documents required · 5 mandatory
₹30,000
₹8.4 Cr
Yes
O/O The CE, PWD (Bldg), Assam, Chandmari, Ghy-3
23 Aug 2022
29 Apr 2022
13 Jun 2022
29 Apr 2022
10 Jun 2022
29 Apr 2022
11 May 2022
Amount
Planning, Designing, and Construction on EPC Basis RCC framed structure building TEACHING HOSPITAL (G+5) AND AUTOPSY (G) ,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , NMC norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis RCC framed structure building ACADEMIC BLOCK (G+5) ,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , NMC norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed..
Planning, Designing, and Construction on EPC Basis RCC framed structure building UG BOYS HOSTEL (G+5) ,UG GIRLS HOSTEL (G+5) , INTERN BOYS HOSTEL (G+2) ,INTERN GIRLS HOSTEL (G+2) ,NURSE HOSTEL (G+5), RESIDENT HOSTEL (G+5) , CENTRAL MESS (G) AND GAS MANIFOLD (G) ,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , NMC norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis RCC framed structure building TYPE-I (G+3), TYPE-II (G+3), TYPE-IV (G+3) & DIRECTOR/PRINCIPAL+MATRON +MEDICAL SUPRETENDENT (G+1) ,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , NMC norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis RCC framed structure building NIGHT SHELTER (G+3) and SHOPPING COMPLEX (G) ,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , NMC norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis RCC framed structure building PRIVATE WARD (G+2) ,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , NMC norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing and construction of Civil External development works (B (i-xi) , Under ground Sump , Horticulture & Landscape , Earth Cutting/Filling Work , Boundary Wall , gate and guard room, Solar water heating system, , hyderopneumatic water supply system , sewerage+effluent treatment plant ,water cooler , water treatment plant with RO , Tubewell , sewage & drainage pump and ESS & Plant Room approval of the same by the Engineer- in-Charge
Planning, Designing and Construction on EPC Basis of INFRASTRUCTURE & EXTERNAL DEVELOPMENT – Electrical Works such as Electrical sub station ,DG set , IP based EPABX System, Nursing call system, Audio Visual System, LED Street light , CCTV system For External Surveillance , Solar photo voltaic power generation system, Emergency Light and Illuminated digital signages and Boom barrier with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing, and Construction on EPC Basis of Medical Gas Pipeline System with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.(Matrix to be Followed as provided with MGPS Technical Specification)
Planning, Designing, and Construction on EPC Basis of Modular Operation Theater With stainless steel technology and Integration with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge. (Matrix to be Followed as provided with MOT Technical Specification)
Comprehensive Operation & Maintenance Contract (CMC) Charges for 5 years comprehensive warranty for followings services which will run concurrently with DLP of 12 Months. (i). MGPS
Comprehensive Operation & Maintenance Contract (CMC) Charges for 5 years comprehensive warranty for followings services which will run concurrently with DLP of 12 Months. (i). MOT
Comprehensive Operation & Maintenance Contract (CMC) Charges post 5 years comprehensive warranty for followings services: (i). MGPS (ii). MOT Comprehensive Operation & Maintenance Contract CMC charges to be quoted for each services seperately. For MGPS 6th Year
7th Year
8th Year
9th Year
10th Year
For MOT 6th Year
7th Year
8th Year
9th Year
10th Year
Operation and Maintenance of Services HVAC WORK:Operation & maintenance (routine & preventive ) and breakdown maintenance of high side & low side of the Air conditioning plant comprising of all the machinery, equipment installed in the A.C. Plant room. Operation& Maintenance For 1st year (Concurrently with DLP of 12 Months)
For 2nd year (After One Year Of DLP)
For 3rd year (After Two Year Of DLP)
For 4th year (After Two Year Of DLP)
For 5th year (After Two Year Of DLP)
STP,WTP,ETP , FIRE PUMP: Operation & comprehensive maintenance STP,WTP, ETP , FIRE PUMP units after three year warranty charges/maintenance. Operator shall be available at plant 24X7. The rates shall be inclusive of all spare, accessories, consumbles, manpower, tools and tackles , replacement of parts,(except fuel , power and water) including routine servicing and maintenance of equipment etc complete in all respect as per direction of Engineer in charge. Operation& Maintenance For 1st year (Concurrently with DLP of 12 Months)
For 2nd year (After One Year Of DLP)
For 3rd year (After Two Year Of DLP)
For 4th year (After Two Year Of DLP)
For 5th year (After Two Year Of DLP)
Lifts:Operation & comprehensive maintenance LIFT units after three year warranty charges/maintenance. Operator shall be available at plant 24X7. The rates shall be inclusive of all spare, accessories, consumables, manpower, tools and tackles , replacement of parts,(except fuel , power and water) including routine servicing and maintenance of equipment etc complete in all respect as per direction of Engineer in charge. Operation& Maintenance For 1st year (Concurrently with DLP of 12 Months)
For 2nd year (After One Year Of DLP)
For 3rd year (After Two Year Of DLP)
For 4th year (After Two Year Of DLP)
For 5th year (After Two Year Of DLP)
ESS, DG SETS, TRANSFORMER: Operation & comprehensive maintenance ESS, DG SETS units after three year warranty charges/maintenance. Operator shall be available at plant 24X7. The rates shall be inclusive of all spare, accessories, consumbles, manpower, tools and tackles , replacement of parts,(except fuel , power and water) including routine servicing and maintenance of equipment etc complete in all respect as per direction of Engineer in charge. Operation& Maintenance For 1st year (Concurrently with DLP of 12 Months)
For 2nd year (After One Year Of DLP)
For 3rd year (After Two Year Of DLP)
For 4th year (After Two Year Of DLP)
For 5th year (After Two Year Of DLP)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid