| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC | ₹1.9 L Quoted ₹2.2 L | L1 | Accepted-AOC L1 contractors acceptance has been awarded. |
| Sl No | Description | Qty | Unit | AUGUSTIN CIVIL CONTRACTOR L1 |
|---|---|---|---|---|
| 1.00 | RCC 1:1 1/2:3 using 12*20mm HBG metal for cable duct cover slab including cost of all materials labor lead lift etc.complete | 2.5 | Cum | 22,500 ₹26,550 Lowest |
| 2.00 | Providing steel reinforcement for cable duct cover slab including cost of all meterials cutting and bending the steel labour lead left etc. complete | 225 | Kg | 20,250 ₹23,895 Lowest |
| 3.00 | Transporting the cover slab from work site to work spot and laying on the cable duct including the cost of all materials labour lead lift etc.complete | 2.5 | Cum | 6,250 ₹7,375 Lowest |
| 4.00 | Bricks work in cm 1:5 using 11 class bricks including cost of all materials labour lesd lift etc.complete | 6.6 | Cum | 42,240 ₹49,843.2 Lowest |
| 5.00 | Plastering in cm1:5,12mm thick including cost all materials labour lead lift etc.complete | 114 | Sqm | 33,060 ₹39,010.8 Lowest |
| 6.00 | supplying and fixing in position of M.S angle 50mmx50mm size od required length for fixing in cable duct as per the direction of engineer at site including cost of all materials lead lift fabrication charges etc.,complete | 40 | Kg | 4,400 ₹5,192 Lowest |
| 7.00 | Providing PCC 1:4:8 using OP/PP cement with 20mm size machine crushed HBG metalincluding cost of all materials ,Labour lead,lift,curing etc.complete-for10cum | 9 | Cum | 52,200 ₹61,596 Lowest |
| 8.00 | White washing two coats for inside cable duct & outer side cable duct including cost of all materials, lead, lift scaffolding charges etc complete. | 226 | Sqm | 8,814 ₹10,400.52 Lowest |
Tender Value
₹2.3 L
EMD Value
₹2,400
Closing Date
2 Feb 2026, 2:00 pmClosed
SE/KKEDC
O/o SE/KKEDC/NGL, Parvathipuram
Improving the existing damaged Cable duct cover slabs with new precast slabs at 11 KV yard at 110/11 KV Thuckaly SS Campus
2026_EB_644603_1
KKEDC/10/2025-26
Open Tender
Civil Works
Works
Thuckalay
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2,400
Yes
20 Jul 2026
19 Jan 2026
3 Feb 2026
19 Jan 2026
2 Feb 2026
19 Jan 2026
19 Jan 2026 - 2 Feb 2026
RCC 1:1 1/2:3 using 12*20mm HBG metal for cable duct cover slab including cost of all materials labor lead lift etc.complete
Providing steel reinforcement for cable duct cover slab including cost of all meterials cutting and bending the steel labour lead left etc. complete
Transporting the cover slab from work site to work spot and laying on the cable duct including the cost of all materials labour lead lift etc.complete
Bricks work in cm 1:5 using 11 class bricks including cost of all materials labour lesd lift etc.complete
Plastering in cm1:5,12mm thick including cost all materials labour lead lift etc.complete
supplying and fixing in position of M.S angle 50mmx50mm size od required length for fixing in cable duct as per the direction of engineer at site including cost of all materials lead lift fabrication charges etc.,complete
Providing PCC 1:4:8 using OP/PP cement with 20mm size machine crushed HBG metalincluding cost of all materials ,Labour lead,lift,curing etc.complete-for10cum
White washing two coats for inside cable duct & outer side cable duct including cost of all materials, lead, lift scaffolding charges etc complete.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
Tendernotice_2.pdf
PDF • 1.07 MB
BOQ_772475.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].