Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2,283.99Admitted-Finance | -48.75% | ₹2,283.99 | L1 | Admitted-Finance |
| 2 | L2₹2,540.68+₹256.69 (11.2%)Admitted-Finance NOT AVAILABLE | -42.99% | ₹2,540.68+₹256.69 (11.2%) | L2 | Admitted-Finance |
| 3 | L3₹3,272.45+₹988.46 (43.3%)Admitted-Finance | -26.57% | ₹3,272.45+₹988.46 (43.3%) | L3 | Admitted-Finance |
| 4 | L4₹4,144.60+₹1,860.61 (81.5%)Admitted-Finance R O WARD NO 03 KATHUA DISTRICT KATHUA | -7.00% | ₹4,144.60+₹1,860.61 (81.5%) | L4 | Admitted-Finance |
| 5 | L5₹4,189.17+₹1,905.18 (83.4%)Admitted-Finance HAMIRPUR TEHSIL MARHEEN DISTRICT KATHUA | HAMIRPUR | UTTAR PRADESH | 210301 | -6.00% | ₹4,189.17+₹1,905.18 (83.4%) | L5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
29 Apr 2026, 6:00 pmClosed
Executive Engineer Flood Control Division Kathua
Executive Engineer Flood Control Division Kathua
civil work
2026_IFC_308484_5
eNIt 02 of 2026-27
Open Tender
Civil Works
Percentage
330 days
Kathua
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer Flood Control Division Kathua
₹4,000
4 May 2026
23 Apr 2026
30 Apr 2026
23 Apr 2026
29 Apr 2026
23 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas
(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including
disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by
Engineer-in-Charge. All kinds of soil | - | Cum | - | - |
| 2 | Banking excavated earth I layer not exceesing 20cm in depth breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers and rolling every 3rd and top most layer with power roller of minimum 8 tonnes and dressing up, in embankmnets for rioads flood banks, marginal banks and guid banks etc, lead upto 50m and lift up to 1.5m in all kind of soil. | - | Cum | - | - |
| 3 | Dismantling of old prot. Works including cutting of crates and stacking of stones | - | Cum | - | - |
| 4 | Hand Packing stones in wire crates excluding cost of crates & stones. | - | Cum | - | - |
| 5 | Suplly of Empty Cement bags | - | No | - | - |
| 6 | Filling empty cement bags with sand/earth; including cost of sewing and strings; excluding cost of bags and earth/sand. | - | No | - | - |
| 7 | Loading/unloading sand/earth filled bags in lorries; lead up to 50m | - | No | - | - |
| 8 | unloading sand/earth filled bags from boadts placing in dry | - | No | - | - |
| 9 | unloading sand/earth filled bags from boadts placing in wet | - | No | - | - |
| 10 | Tipping stone filed wire crates; including equipment charges | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.58 MB
BOQ_999682.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .