Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance AT PO DAUNI PS K NUAGAON DIST GANJAM PIN 761011 | GANJAM | ODISHA | 761011 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹46.5 L
EMD Value
₹46,475
Closing Date
3 Jun 2026, 5:00 pmClosed
Commissioner,
Brahmapur Municipal Corporation, Brahmapur
Const. Of Balance canal type Drain at omm Nagar in ward no. 04
2026_ORULB_129358_2
BMC(BAM)/327/2026-2027
Open Tender
Civil Works - Others
Percentage
120 days
Commissioner, Brahmapur Municipal Corporation
Please refer tender documents
2 documents required · 2 mandatory
₹7,080
₹46,475
Yes
4 Jun 2026
18 May 2026
4 Jun 2026
18 May 2026
3 Jun 2026
18 May 2026
18 May 2026 - 28 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | provision for 1HP pumpset for discharge of water | 120 | hr | 177.39 | ₹21,286.8 |
| 2 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness(Unit = Hectare) | 400 | sqm | 6.38 | ₹2,552 |
| 3 | Earth work excavation in slushy soil within initial lead of 50 m and initial lift of 1.5 m including rough dressing and levelling the bed.(per 100 cum) | 676 | cum | 275.97 | ₹1,86,555.72 |
| 4 | Supply and filling the F & P with filling sand of approved quality with well watered & rammed including cost, conveyance, royalty & all taxes, etc., complete. | 52 | cum | 1,553.39 | ₹80,776.28 |
| 5 | Filling in foundation & plinth with excavated materials or moorum including watering ramming as per the direction of O.I.C (data for 100 cum) | 400 | cum | 126.78 | ₹50,712 |
| 6 | C.C (1:4:8) with 4cm size HG CRUSHER BROKEN metal including all cost, conveyance,royalty & taxes etc.comp.to work site as per specification approved by the department & direction of E.I.C | 52 | cum | 5,516.37 | ₹2,86,851.24 |
| 7 | R.C.C work of M-20 grade with 20mm & down grade BHG C/B chips including hoisting, laying & all cost, conveyance, royalty & taxes etc. comp. to work site as per the specification approved by the deptt. & direction of EIC.( Data for 15 cum) | 259 | cum | 6,274.6 | ₹16,25,121.4 |
| 8 | Supplying fitting & placing uncoated HYSD reinforcement including cutting, bendind,binding & placing the steel rods as per drawing & technical specification with cost of binding wire 18 to 20 gauge | 207.2 | qtl | 9,253.15 | ₹19,17,252.68 |
| 9 | Rigid & smooth centering & shuttering for R.C.C. and C.C. works including false works, dismantling and removing them from the site after casting, curing including cost of materials etc., complete. | 720 | sqm | 249.82 | ₹1,79,870.4 |
| 10 | 6mm thick cement plester (1:4) to RCC surface finish smooth including closed deep chiping & slury treatment including all cost conveyance royalty and taxes etc. comp. | 620 | sqm | 181.75 | ₹1,12,685 |
stage.html
html • 0.02 MB
finance_591505.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
DTCN.pdf
Tender Documents • 2.71 MB
BOQ_591505.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .