Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹42.2 L
EMD Value
₹4.2 L
Closing Date
19 Nov 2026, 12:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Chief Engineer civil
NAGAR NIGAM AGRA
Tajganj Zone Room No.-41 Construction work of culvert in front of Baluganj Chilagarh Chowrah Temple.
2026_DOLBU_1206652_1
05-11-2026/NAGAR NIGAM AGRA/19-11-2026/119
Open Tender
Construction Works
Percentage
Agra Nagar Nigam
Please Refer Tender Document
2 documents required · 2 mandatory
₹4,720
Agra Nagar Nigam
₹4.2 L
7 Nov 2026
7 Nov 2026
19 Nov 2026
7 Nov 2026
19 Nov 2026
7 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning of site for workable position etc. (NS) | 2 | Job | 2,000 | ₹4,000 |
| 2 | Providing of 32HP diesel pump for dewatering of nala with pump, driver etc. all complete. (NS) | 40 | Day | 625 | ₹25,000 |
| 3 | Dismantling stone slab roofing over wooden karries or R.C.C. battens (dismantling karries and battens to be paid for separately), including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 18.75 | Cum | 2,031.73 | ₹38,094.94 |
| 4 | Removle of for Nala/Nali in liquid mud or faul position with special T&P including lead 30 m and lift up to 3.00 m etc. all complete | 300 | Cum | 239 | ₹71,700 |
| 5 | Providing of bandha for diversion of nala etc. all complete. (NS) | 1,260 | Bags | 28.5 | ₹35,910 |
| 6 | 1:5:10 (1 cement: 5 coarse sand (zone-III) derived from natural sources: 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 25 | Cum | 4,970.28 | ₹1,24,257 |
| 7 | R.C.C. work Providing and laying in position specified grade of R.C.C. Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement. All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) (Chapter 5 S.I. No. 5.1.4) | 37.5 | Cum | 7,000 | ₹2,62,500 |
| 8 | Renforced cement concrete work in walls (any thickness), including attachedplasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struls etc. including cost of centering, shuttering, and excluding Reinforceement 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 24 | Cum | 8,250 | ₹1,98,000 |
| 9 | R.C.C. work Providing and laying in position specified grade of renforced cement concrete Slab including the cost of centering, shuttering, finishing and excluding reinforcement. All work up to plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 37.5 | Cum | 8,600 | ₹3,22,500 |
| 10 | Mild Steel or iron in plain work such as reinforced concrete or reinforced brick work (When not included in and an overall rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (10 mm to 12mm tor (TMT Bars). | 124.34 | Qtl | 8,500 | ₹10,56,890 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.42 MB
BOQ_2287741.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .