Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
10 Jun 2026, 3:00 pm4d left
Signal & Telecom work in connection with (1)Joravasan - Surat Section - CTR(P) - 14.624 TKM for Passenger Loops (2)Virar - Joravasan - TRR(P) - 13.405 TKM for passenger loops (3) Providing RGM Siding facilties at Gholvad, Billimora, Sachin, Bhestan & Surat of Mumbai Division.
SG_216_2_155_WA_PH31
SG_216_2_155_WA_PH31
Open
6 Months
Mumbai, Maharashtra
₹0
₹3.0 L
13 May 2026
13 May 2026
27 May 2026
Item- 1 Telecom-Supply Portion
S No. Item Description of Item Unit Qty Rate Amount
1 1 Supply of Pre-lubricated HDPE duct, 40 mm Kilometre 11.00 42930.55 472236.05
OD, 33 ID as per RDSO specification No.
RDSO/SPN/TC/45/2013 Rev. 2.0 or latest. The
item also includes supply of all the accessories
of HDPE duct like end caps, collars, bends,
couplers etc. Inspection: (i) RDSO/RITES if
value of item in work more than 5 lakhs (ii)
Consignee subject to procurement from RDSO
approved vendors if value of whole item in
work less than 5 lakhs as per extant
instructions by Railway Board.
2 2 Supply of Fiber Distribution management Numbers 2.00 53458.92 106917.84
(FDMS) of 2x24 Fiber as per RDSO
MUMBAI CENTRAL DIVISION-S AND T/WESTERN RLY
Ohms as per RDSO Spec. No. IRS: TC-76-2000
with Amnd. 1 or latest for emergency joints in
4 4 Supply of Double Walled Corrugated (DWC) Numbers 15.00 1597.85 23967.75
HDPE Pipe/duct with associated collars etc. as
per RDSO Specification No.
RDSO/SPN/204/2011 or latest anti-rodent &
anti-oxidant and non flame propagating type
in 6 meters straight length and of size 120 mm
outer dia,& 103.5 mm inner dia. (The
manufacturers, suppliers must produce valid IS
license and should be certified under ISO 9000
and shall submit copy of certificate). One of
the following coupling arrangements should
also be supplied with each pipe as per the site
requirement. 1) Suitable snap fit coupler with
rubber O-Ring 2) Spacers 3) Tees 4) Bend, 5)
End-cap (The total quantity of above items is
equal to no. of pipes supplied.) DWC pipe shall
be marked at every 1 mtr length in such a way
that manufacturer's name, vendor name and
year of manufacture can be easily identified.
5 5 Supply of RCC cable route marker engraved Numbers 180.00 292.05 52569.00
and painted on both side along the route at
every 50 meter and route diversion as per Drg.
No 4014/00/CC4 or latest/ Stone marker.
Item- 2 Telecom-Execution Portion
S No. Item Description of Item Unit Qty Rate Amount
1 1 Blowing and drawing of OFC through laid HDPE Metre 11000.00 9.60 105600.00
duct as per approved route plan , taking due
care while transporting and sealing both ends
as per specifiaction.
2 2 Excavation of cable trench as per cable route cum 2700.00 243.71 658017.00
plan, 1.2 Mtr. deep and of 0.3 Mtr. to 0.6 Mtr.
wide at bottom as per RDSO sketch No.
SDO/CABLE LAYING/003 or latest alongside the
track in normal (all type) soil/strata,
conforming to distances as per cable route
plan and refilling. This work includes clearing
of route from bushes etc, covering of cable laid
in trench by loose soil for a layer of 50mm
thickness approximately before covering by
bricks. The work shall be done as per the
extant practice on North Western Railway and
instructions of Railway Engineer at site. In
case 1.2m depth of trench is not achievable
due to site conditions, specific approval of JA
grade officer will be required for each site
where trench depth of 1.2m is not possible.
Without the approval of JA Grade officer, no
payment for trenching will be made for trench
depth less than 1.2m.
MUMBAI CENTRAL DIVISION-S AND T/WESTERN RLY
3 3 Horizontal direction drilling/boring without Running 100.00 1068.94 106894.00
damage of surface road /track using Auger Metre
Machine(HDD machine). The bore shall be upto
200 mm dia & shall be done at the depth of
minimum 1200 mm from the ground level. The
ground level shall be considered ignoring the
bank height of the bank of the road. The length
of the bore shall be minimum 4 Mtrs long. This
include insertion of different dia DWC-HDPE
pipe/ GI pipes coupling etc. as per direction of
Engineer In charge. Note:- Pipe Supply is not
covered under this item. Contactor shall
provide all material required for boring and
adequate nos. of labours for proper laying of
cables into the bore. Cable shall be laid
cautiously so that it should not get damage
due to rough handling & pressure on cable.
4 4 Placing of DWC HDPE/RCC/GI pipes along with Metre 90.00 26.28 2365.20
collars in trenches at places near track and
road, crossings, platform cuttings etc.
Inspection: Consignee Inspection Charges:
None. Payment Terms: 100% after
Execution(Unit is RM running meter.)
5 5 Laying of HDPE pipe duct in trenches/GI Metre 11000.00 10.80 118800.00
Pipe/RCC pipe/on wall/on PF, including jointing
and levelling using couplers and sealing the
section etc as per site requirement as per
6 6 Transportation at site and Installation of RCC Numbers 180.00 73.00 13140.00
cable route marker engraved and painted on
both side along the route at every 50 meter
and route diversion as per Drg. No
4014/00/CC4 or latest/ Stone marker
7 7 Supply and installation of OFC Joint closure Numbers 16.00 8775.07 140401.12
OFC conforming to TEC Spec. and splicing of
Optic Fibre Cable' (48 Fibres)and testing of
fibre for 1310 :1550 nm. .Inspection:
Consignee Inspection Charges: None.
PaymentTerms: 80% after supply and rest 20
% after execution.
8 8 Installation of Fiber distribution management Numbers 2.00 5709.10 11418.20
system splicing and termination of 2X24 Fiber
cables. As per specification.
9 9 Supply and execution of Rapid Joint LS3 Numbers 12.00 12131.28 145575.36
suitable for cable Jonting of cable of various
size, having dielectric strength > 20KV/mm,
Non Toxic, low viscosity, Flamability point >
200 C, Re-entrable, Long storage life Make
RAYTECH or Similar. Cable size 4/6 Quad
10 10 Laying of S&T Cables of various cores/ pairs/ Metre 6000.00 8.07 48420.00
quads in trenches/ GI pipes/ RCC pipes/ DWC
pipes/ Trunking. This also includes laying of
cables in track crossings & road crossings.
Item includes provision of labels of coloured
plastic adhesive tapes or any other identifiable
material on each cable to give the cable
number at each Gantry Post/hectometer post.
(Cables will be meggered before and after its
laying by contractor under supervision of
Railway Representative and he will submit the
meggering report of each testing). Length of
the cable laid includes the length of the cable
coiled for termination purposes.
11 11 Cement concrete work for miscellaneous items cum 10.00 3224.02 32240.20
in the ratio 1 : 3 : 6 . Item includes excavation,
ramming, curing and plastering with cement &
sand mixture (aggregate not exceeding 3.8
cm.) (Aggregate cement & sand to be supplied
by the contractor).
MUMBAI CENTRAL DIVISION-S AND T/WESTERN RLY
12 12 Supply & Installation of OFC jointing pits size Numbers 16.00 7159.68 114554.88
0.6m X 0.8X 1m. The material shall be
supplied as per engineer in charge
instructions. As per specification.
instruction of Site Engineer, supplying and
filling of sand before and after coiling the
cables, covering top of the cable pit with
stones and providing brick masonry on all four
sides of the cable pit and plastering thereafter.