Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance NO 5 6TH FLOOR PRESTIGE KHODAY TOWER RAJBHAVAN ROAD BANGALORE KARNATAKA 560103 | BENGALURU URBAN | KARNATAKA | 560103 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹2.5 Cr
Closing Date
4 Nov 2022, 2:00 pmClosed
Ms. Sangitta Ghuliani, Sr. GM (SCM-2)
AS PER TENDER DOCUMENT
Hydrogen Production Plant on Job Work basis at Panipat Refinery, Panipat, Haryana
2022_REFHQ_149160_1
SG/B269-421-LE-T-9805/1019
Open Tender
Lump Sum TurnKey
840 days
AS PER TENDER DOCUMENT
Please refer Tender documents.
7 documents required · 7 mandatory
₹2.5 Cr
Yes
AS PER TENDER DOCUMENT
17 Mar 2023
28 Mar 2022
7 Nov 2022
28 Mar 2022
4 Nov 2022
24 Sept 2022
13 Apr 2022
Amount
Fixed Monthly Job Work charge for Hydrogen Production Plant
MJoH The base monthly JOB WORK charge (Rs./month)
WConstant A constant relating to WPI and CPI adjustment and shall not be less than 65% Note-1: [ Wconstant + Wmp + WCPI + We =100]. WConstant shall not be less than 65% and We shall not be more than 20%. Values to be quoted in percentage. 1.1 The We component shall not be more than 20%. In case it is more than 20% the balance excess shall be adjusted against Wconstant. .(Bidder to ensure the same while quoting the figures in BoQ.In case of deviation the relevant BoQ will not get Validated and the bidder will not be able to upload the BoQ) 1.2 Wconstant should not be less than 65%. If in case it is less than 65%, the Wconstant shall be increased to 65% & balance shall be adjusted against Wmp and WCPI proportionately. (Bidder to ensure the same while quoting the figures in BoQ.In case of deviation the relevant BoQ will not get Validated and the bidder will not be able to upload the BoQ) 1.3 The figures shall be rounded off to two decimal point
Wmp Component fraction related to wholesale price index for manufactured products Note-1: [ Wconstant + Wmp + WCPI + We =100]. WConstant shall not be less than 65% and We shall not be more than 20%. Values to be quoted in percentage. 1.1 The We component shall not be more than 20%. In case it is more than 20% the balance excess shall be adjusted against Wconstant. .(Bidder to ensure the same while quoting the figures in BoQ.In case of deviation the relevant BoQ will not get Validated and the bidder will not be able to upload the BoQ) 1.2 Wconstant should not be less than 65%. If in case it is less than 65%, the Wconstant shall be increased to 65% & balance shall be adjusted against Wmp and WCPI proportionately. (Bidder to ensure the same while quoting the figures in BoQ.In case of deviation the relevant BoQ will not get Validated and the bidder will not be able to upload the BoQ) 1.3 The figures shall be rounded off to two decimal point.
WCPI component fraction related to All India Consumer price index for Industrial worker Note-1: [ Wconstant + Wmp + WCPI + We =100]. WConstant shall not be less than 65% and We shall not be more than 20%. Values to be quoted in percentage. 1.1 The We component shall not be more than 20%. In case it is more than 20% the balance excess shall be adjusted against Wconstant. .(Bidder to ensure the same while quoting the figures in BoQ.In case of deviation the relevant BoQ will not get Validated and the bidder will not be able to upload the BoQ) 1.2 Wconstant should not be less than 65%. If in case it is less than 65%, the Wconstant shall be increased to 65% & balance shall be adjusted against Wmp and WCPI proportionately. (Bidder to ensure the same while quoting the figures in BoQ.In case of deviation the relevant BoQ will not get Validated and the bidder will not be able to upload the BoQ) 1.3 The figures shall be rounded off to two decimal point.
We component percentage related to Foreign Exchange and shall not be more than 20% Note-1: [ Wconstant + Wmp + WCPI + We =100]. WConstant shall not be less than 65% and We shall not be more than 20%. Values to be quoted in percentage. 1.1 The We component shall not be more than 20%. In case it is more than 20% the balance excess shall be adjusted against Wconstant. .(Bidder to ensure the same while quoting the figures in BoQ.In case of deviation the relevant BoQ will not get Validated and the bidder will not be able to upload the BoQ) 1.2 Wconstant should not be less than 65%. If in case it is less than 65%, the Wconstant shall be increased to 65% & balance shall be adjusted against Wmp and WCPI proportionately. (Bidder to ensure the same while quoting the figures in BoQ.In case of deviation the relevant BoQ will not get Validated and the bidder will not be able to upload the BoQ) 1.3 The figures shall be rounded off to two decimal point. Note-2: For evaluation following shall be considered in the NPV, • WPI-MPn/ WPI-MPo =1.042, • CPIn/ CPIo= 1.056 • FEcomputed / FEo= 1 i.e. both the elements shall be considered equal / identical. Note-3: By the time, payment of JOB WORK Charge starts, FEcomputed / FE0 shall be a constant fig.
Variable Job work charges for Hydrogen Production Plant
AH (Tonne of Hydrogen gas) (In Rs)
Description of Work / Item(s)
Amount
Guarantee Figures per Tonne of H2 at Capacity Points for design case-1 (RLNG as Feed+fuel) at 10.125 TPH of Net H2 Export (100 % HGU capacity)
RLNG Consumption
Power Consumption
DM Water Consumption
HP Steam Export
Re-circulating Cooling Water Supply
Guarantee Figures per Tonne of H2 at Capacity Points for design case-1 (RLNG as Feed+fuel) at 8.60625 TPH of Net H2 Export (85 % HGU capacity)
RLNG Consumption
Power Consumption
DM Water Consumption
HP Steam Export
Re-circulating Cooling Water Supply
Guarantee Figures per Tonne of H2 at Capacity Points for design case-1 (RLNG as Feed+fuel) at 6.58125 TPH of Net H2 Export (65 % HGU capacity)
RLNG Consumption
Power Consumption
DM Water Consumption
HP Steam Export
Re-circulating Cooling Water Supply
Guarantee Figures per Tonne of H2 at Capacity Points for design case-1 (RLNG as Feed+fuel) at 3.0375 TPH of Net H2 Export (30 % HGU capacity)
RLNG Consumption
Power Consumption
DM Water Consumption
HP Steam Export
Re-circulating Cooling Water Supply
Guarantee Figures per Tonne of H2 at Capacity Points for design case-2 (SR sour Naphtha as Feed+fuel) at 10.125 TPH of Net H2 Export (100 % HGU capacity)
SR high Sulphur Naphtha Consumption
Power Consumption
DM Water Consumption
HP Steam Export
Refinery Fuel gas
Re-circulating Cooling Water Supply
Guarantee Figures per Tonne of H2 at Capacity Points for design case-2 (SR sour Naphtha as Feed+fuel) at 8.60625 TPH of Net H2 Export (85 % HGU capacity)
SR high Sulphur Naphtha Consumption
Power Consumption
DM Water Consumption
HP Steam Export
Refinery Fuel gas
Re-circulating Cooling Water Supply
Guarantee Figures per Tonne of H2 at Capacity Points for design case-2 (SR sour Naphtha as Feed+fuel) at 6.58125 TPH of Net H2 Export (65 % HGU capacity)
SR high Sulphur Naphtha Consumption
Power Consumption
DM Water Consumption
HP Steam Export
Refinery Fuel gas
Re-circulating Cooling Water Supply
Guarantee Figures per Tonne of H2 at Capacity Points for design case-2 (SR sour Naphtha as Feed+fuel) at 3.0375 TPH of Net H2 Export (30 % HGU capacity)
SR high Sulphur Naphtha Consumption
Power Consumption
DM Water Consumption
HP Steam Export
Refinery Fuel gas
Re-circulating Cooling Water Supply
Guarantee Figures per Tonne of H2 at Capacity Points for design case-3 (HROG+RLNG as Feed+fuel) at 10.125 TPH of Net H2 Export (100 % HGU capacity) Note-2
RLNG Consumption
Power Consumption
DM Water Consumption
HP Steam Export
Re-circulating Cooling Water Supply
Guarantee Figures per Tonne of H2 at Capacity Points for design case-3 (HROG+RLNG as Feed+fuel) at 8.60625 TPH of Net H2 Export (85 % HGU capacity) Note-2
RLNG Consumption
Power Consumption
DM Water Consumption
HP Steam Export
Re-circulating Cooling Water Supply
Guarantee Figures per Tonne of H2 at Capacity Points for design case-3 (HROG+RLNG as Feed+fuel) at 6.58125 TPH of Net H2 Export (65 % HGU capacity) Note-2
RLNG Consumption
Power Consumption
DM Water Consumption
HP Steam Export
Re-circulating Cooling Water Supply
Guarantee Figures per Tonne of H2 at Capacity Points for design case-3 (HROG+RLNG as Feed+fuel) at 3.0375 TPH of Net H2 Export (30 % HGU capacity) Note-2.
RLNG Consumption
Power Consumption
DM Water Consumption
HP Steam Export,
Re-circulating Cooling Water Supply
Matheson Tri-Gas Inc.
Prodair Air Products India Private Limited
Prodair Air Products India Private Limited
Matheson Tri-Gas Inc.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid