| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-Finance | ₹1.0 Cr | L1 | Accepted-Finance financially responsive |
| 2 | L2₹1.0 CrAccepted-Finance | ₹1.0 Cr | L2 | Accepted-Finance financially responsive |
| Sl No | Description | Qty | Unit | M/S L T S ENTERPRISES L1 | M/S L R ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00EARTH WORK IN HILL ROAD | |||||
| 1.01 | Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) | 5,590.99 | cum | 239.7 ₹13.4 L | 250 ₹14.0 L |
| 1.02 | Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders. | 2,795.5 | cum | 117.5 -₹3,28,471.25 | 120 -₹3,35,460 |
| 1.03 | Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring blasting. (Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut materials with all lift and lead upto 1000 metres). | 1,539.96 | cum | 350.62 ₹5.4 L | 350.62 ₹5.4 L |
| 1.04 | Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift Ordinary and Hard Rock | 769.98 | cum | 187.06 -₹1,44,032.46 | 187.06 -₹1,44,032.46 |
| 2.00[SH: Cement Concrete Pavement] | |||||
| 2.01 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 167.29 | cum | 401.38 ₹67,146.86 | 405 ₹67,752.45 |
| 2.02 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Thecnical Specification Clause 401
Rate per cum for grading-II Material | 116.17 | cum | 3,186.6 ₹3.7 L | 3,186.6 ₹3.7 L |
| 3.00Dry Lean Cement Concrete Sub- base | |||||
| 3.01 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | 116.17 | cum | 7,032.14 ₹8.2 L | 7,100 ₹8.2 L |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
25 Mar 2026, 10:00 amClosed
Executive Engineer, PWD, Bomdila
Executive Engineer, PWD, Bomdila
Link Road to Old Heritage village Lamezin (Upper Dzang), Bichom District.
2026_PWDAP_3207_1
BDL/TnA-37/NSD-06/2025-26/35
Open Tender
Civil Works
Bomdila
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,000
EE PWD Bomdila
₹1.1 L
25 Mar 2026
19 Mar 2026
25 Mar 2026
19 Mar 2026
25 Mar 2026
19 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1EARTH WORK IN HILL ROAD | ||||||
| 1.01 | Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) | 1 | cum | - | - | itemH1Code1 |
| 1.02 | Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders. | - | cum | - | - | itemH2 |
| 1.03 | Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring blasting. (Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut materials with all lift and lead upto 1000 metres). | - | cum | - | - | itemH1Code2 |
| 1.04 | Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift Ordinary and Hard Rock | - | cum | - | - | itemH3 |
| 2[SH: Cement Concrete Pavement] | ||||||
| 2.01 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 1 | cum | - | - | itemH4 |
| 2.02 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Thecnical Specification Clause 401
Rate per cum for grading-II Material | - | cum | - | - | itemH1Code4 |
| 3Dry Lean Cement Concrete Sub- base | ||||||
| 3.01 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | - | cum | - | - | itemH1Code5 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_3405.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
Tenderdoc.pdf
Tender Documents • 30.90 MB
BOQ_3405.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid