| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.9 CrAccepted-AOC 101 1 10 68 4 PLOT NO 52 SRINIVASA NILAYAM CHIKOTI GARDENS BEGUMPET HYDERABAD TELANGANA 500016 | MEDCHAL MALKAJGIRI | TELANGANA | 500016 | ₹5.9 Cr | 1 | Accepted-AOC Rates Accepted |
| 2 | 2₹5.9 Cr+₹1.8 L (0.30%)Rejected-Finance 2277 RAJA PARK RANI BAGH RANI BAGH NORTH WEST DELHI DELHI 110034 | NORTH WEST DELHI | DELHI | 110034 | ₹5.9 Cr+₹1.8 L (0.30%) | 2 | Rejected-Finance Quoted Amount Rejected |
| 3 | 3₹5.9 Cr+₹3.2 L (0.55%)Rejected-Finance 38A 2 JYOTISH ROY ROAD KOLKATA 700053 | KOLKATA | KOLKATA | WEST BENGAL | 700053 | ₹5.9 Cr+₹3.2 L (0.55%) | 3 | Rejected-Finance Quoted Amount Rejected |
Tender Value
₹5.9 Cr
EMD Value
₹17.7 L
Closing Date
15 Apr 2026, 4:00 pmClosed
DIRECTOR SPORTS AND YOUTH WELFARE
T T NAGAR STADIUM BHOPAL
E Tender for Synthetic Hockey Turf at Mandeep Raisen 2026 First Call
2026_DSYW_493372_1
12548/DSYW/INFRA/2026
Open Tender
Miscellaneous Works
Percentage
365 days
BHOPAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹17.7 L
Yes
7 Sept 2026
24 Mar 2026
16 Apr 2026
24 Mar 2026
15 Apr 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2Excavation in soil using Hydraulic Excavator and Tippers with disposal upto 1000 meters Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting suitable earth with all lifts and lead upto 1000 m as relevent clauses of section-300 of specification. (50% qty considered for soil excavation) | |||||
| 3Embankment Construction with Material Obtained from Borrow Pits Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevent clauses of section-300 | |||||
| 4Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400-2) Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator or plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. | |||||
| 5Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density in accordance to Table No. 400-12, 400-13 and as per clause of section 406 of specifications. | |||||
| 6Prime coat Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including cleaning of road surface and spraying primer at the rate of 0.75 kg/sqm using mechanical means as per clause 502 of specifications. | |||||
| 7Providing and applying tack coat with low viscosity bitumen of VG 10 grade using bitumen pressure sprayer on the prepared bituminous/granular surface cleaned with mechanical broom and as per relevant clauses of section-503 of specifications., @0.30 kg per sqm (dry & hungry bituminous surfaces /granular surfaces treated with primer) | |||||
| 8Dense Graded Bituminous Macadam Providing and laying dense bituminous macadam using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a Electronic Sensor paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause 505 of specification complete in all respects. Using Batch Mix Plant of appropriate capacity for GradingII(19 mm nominal size) Bitumen Content minimum 4.5% with bitumen 60/70 (VG 30) | |||||
| - | Bituminous Concrete Providing and laying bituminous concrete using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a Electronic Sensor paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause 507 of specification
Using Batch Mix Plant of appropriate capacity
for Grading-II (30-40 mm thickness ) Bitumen Content minimum 5.4%with 60/70 bitumen(VG-30) | - | Cum | - | - |
| - | Providing laying and rolling of 20 mm thick open-graded premix carpet (thickness not less than 20 mm at any place) conposed of 13.2 mn graded aggregate size @ 0. 18 cum per 10 sqm &11.2 mm graded size 0.09 cum per 10 sqm using with bituminous binder @ 13.43 kg per 10 Sqm (i.e 92% of standard bitumen) and 8 % waste processed plastic by weight shall be used for coating aggregate after its heating as per IRC:SP:98- 2013, laying to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in s suitable plant, laying and rolling with a three wheel 8 to 10 ton static roller capacity, finished to required level and grades as per technical specification clause 508 to be seal coat of either type A, type B or type C as per technical specification Note- The above shall be included in the DPR and executed with prior written permission from the E-IN-C MPPWD. Bitumen ( VG-30) | - | SQM | - | - |
| - | Dry Lean Cement Concrete Sub- base
Construction of dry lean cement concrete Sub- base over a prepared sub-grade or drainage layer with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determinedduring trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver finisher with electronic sensor, compacting with 8- 10 tonnes vibratory roller, finishing and curing as per clause 601 of specification complete in all respect. | - | CUM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
ETENDERFORMANDIDEEPHOCKEYTURF2026FirstCall.pdf
Tender Documents • 0.53 MB
BOQ_585599.xls
BOQ • 0.32 MB
MandideepHokey12345.pdf
PDF • 0.08 MB
MandideepHokey12345.pdf
PDF • 0.08 MB
Document2.pdf
PDF • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .