Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC | ₹1.4 L | L1 | Accepted-AOC Accept |
| 2 | L2₹1.5 L+₹9,941.50 (7.08%)Rejected-AOC | ₹1.5 L+₹9,941.50 (7.08%) | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | R SABEER ALI L2 | R.Seerangam L1 |
|---|---|---|---|---|---|
| 1.01 | Earthwork excavation for foundation to the full depth as may be directed by departmental officers in all types of soils except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary, refilling the sides of foundation with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth in the places shown by the departmental officers with initial lead of 10 Meters and initial lift 2 Metres and clearing and leveling the site etc. complete complying with standard specification. | 14 | M3 | 212 ₹2,968 | 197 ₹2,758 Lowest |
| 2.01 | Plain Cement Concrete 1:4:8 mix (One Cement, Four Fine Aggregate and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 2 | M3 | 6,184 ₹12,368 | 5,779 ₹11,558 Lowest |
| 3.01Centering for soffits of reinforced cement concrete slabs or plain surfaces including strutting upto 3 mts height using MS sheets of size 90 cm x 60 cm (10 gauge) and stiffered with elded silver oak joists of size 10 cm x 6.5 cm spaced at about 90 ce c/c and supported by casurinaprops of size 10 cm to 13 cm dia spaced at 75 cm c/c complying with standard specification | |||||
| 3.02 | For side wall | 46 | M2 | 761 ₹35,006 | 710.9 ₹32,701.4 Lowest |
| 3.03 | for culvert | 5 | M2 | 1,004 ₹5,020 | 937.6 ₹4,688 Lowest |
| 4.01 | Plain Cement Concrete 1:2:4 mix (One Cement, Two Fine Aggregate and Four Coarse Aggregate) Using 20mm ISS HBG Metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 8 | M3 | 7,717 ₹61,736 | 7,211.7 ₹57,693.6 Lowest |
| 5.01 | Reinforced Cement Concrete 1:1.5:3 (One Cement, One and half crushed stone sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including Super Plasticiser, mixing charges for machine mix, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers - machine mix | 2 | M3 | 9,381 ₹18,762 | 8,767.3 ₹17,534.6 Lowest |
| 6.01 | Supplying, fabricating and placing in position mild steel or ribbed tor steel for all reinforced cement concrete works as per design given including cost of steel and binding wire with all conveyance and lead charges in all floors etc.complete complying with standard specifications and as directed by the deparmental engineers. TNBP No:30 | 140 | Kgs | 100 ₹14,000 | 92.97 ₹13,015.8 Lowest |
| 7.01 | Granolithic Floor finishing with Cement Concrete 1:2:4 (One part of cement, two parts of sand and four parts of ISS HBG metal) mix using 10mm to 12mm ISS size HBG metal to 25mm thick including cost and conveyance of all materials etc.and all lobour charges etc.complete as per Standard specification and as directed by the departmental officers. TNBP No:39-F | 3 | m2 | 155 ₹465 | 144.7 ₹434.1 Lowest |
Tender Value
₹1.7 L
EMD Value
₹1,700
Closing Date
4 Dec 2025, 3:00 pmClosed
The Executive Officer
Town Panchayat Offfice, Kamayagoundanpatti, Theni Dist
Restoration of Drainage at Mettupatti in kamayagoundanpatti townpanchayat
2025_DTP_626387_1
280/2025
Open Tender
Civil Works
Works
45 days
Kamayagoundanpatti town limit
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,700
30 Jan 2026
25 Nov 2025
4 Dec 2025
25 Nov 2025
4 Dec 2025
26 Nov 2025
Amount
Earthwork excavation for foundation to the full depth as may be directed by departmental officers in all types of soils except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary, refilling the sides of foundation with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth in the places shown by the departmental officers with initial lead of 10 Meters and initial lift 2 Metres and clearing and leveling the site etc. complete complying with standard specification.
Plain Cement Concrete 1:4:8 mix (One Cement, Four Fine Aggregate and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28).
Centering for soffits of reinforced cement concrete slabs or plain surfaces including strutting upto 3 mts height using MS sheets of size 90 cm x 60 cm (10 gauge) and stiffered with elded silver oak joists of size 10 cm x 6.5 cm spaced at about 90 ce c/c and supported by casurinaprops of size 10 cm to 13 cm dia spaced at 75 cm c/c complying with standard specification
For side wall
for culvert
Plain Cement Concrete 1:2:4 mix (One Cement, Two Fine Aggregate and Four Coarse Aggregate) Using 20mm ISS HBG Metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28).
Reinforced Cement Concrete 1:1.5:3 (One Cement, One and half crushed stone sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including Super Plasticiser, mixing charges for machine mix, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers - machine mix
Supplying, fabricating and placing in position mild steel or ribbed tor steel for all reinforced cement concrete works as per design given including cost of steel and binding wire with all conveyance and lead charges in all floors etc.complete complying with standard specifications and as directed by the deparmental engineers. TNBP No:30
Granolithic Floor finishing with Cement Concrete 1:2:4 (One part of cement, two parts of sand and four parts of ISS HBG metal) mix using 10mm to 12mm ISS size HBG metal to 25mm thick including cost and conveyance of all materials etc.and all lobour charges etc.complete as per Standard specification and as directed by the departmental officers. TNBP No:39-F
R SABEER ALI (BID ID -1526010)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_749003.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_749003.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .