Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.2 LAdmitted-Fee/PreQual/Technical/Finance | -41.11% | ₹17.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹17.6 L+₹46,040.85 (2.68%)Admitted-Fee/PreQual/Technical/Finance | -39.53% | ₹17.6 L+₹46,040.85 (2.68%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹18.1 L+₹95,578.48 (5.57%)Admitted-Fee/PreQual/Technical/Finance | -37.83% | ₹18.1 L+₹95,578.48 (5.57%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹18.9 L+₹1.7 L (10.1%)Admitted-Fee/PreQual/Technical/Finance | -35.14% | ₹18.9 L+₹1.7 L (10.1%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹18.9 L+₹1.8 L (10.4%)Admitted-Fee/PreQual/Technical/Finance | -34.99% | ₹18.9 L+₹1.8 L (10.4%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹29.1 L
EMD Value
₹58,280
Closing Date
13 Aug 2026, 4:00 pmClosed
Executive Engineer RnB Division Budgam
engineering complex budgam
Restoration of Wager to Arampora road.
2026_PWDJK_319649_8
NIT_No_63_DB_2026-27
Open Tender
Civil Works
Percentage
30 days
Wager
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,100
Executive Engineer RnB Division Budgam
₹58,280
17 Aug 2026
5 Aug 2026
14 Aug 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply Stacking & laying of GSB in layers and compacting with 8-10 tonne capacity PRR to achieve the desired density complete as per Technical Specification clause 402 including all carriages of material by mechanical transport, leads, lifts etc. complete | 1,050 | cum | 1,000 | ₹10,50,000 |
| 2 | Supply Laying spreading and compacting stone aggregates of specified sizes to WBM specifications in uniform thickness hand packing rolling 3 wheeled vibratory roller 8 to 10 tonne capacity in stages to proper grade and camber applying and brooming requisite type of screening binding material to fill interstices of coarse aggregates watering and compacting to required density incl carriage bt MT 45 kms | 525 | cum | 2,700 | ₹14,17,500 |
| 3 | Earth work in excavation in foundation trenches by mechnical means (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m; disposed earth to be levelled and neatly dressed. | 16.38 | cum | 256.45 | ₹4,200.65 |
| 4 | P/L dry Stone soling duly tightly hand packed and RBM/GSB filling i/c stacking, carriage etc, complete job. | 2.73 | cum | 1,000 | ₹2,730 |
| 5 | Providing and laying in position cement concrete of specified grade (1:4:8) mix,stone aggregate 20mm nominal size i/c the cost of centring and shuttering - All work upto plinth level. Complete job. | 2.73 | cum | 5,202.9 | ₹14,203.92 |
| 6 | Providing and laying in position cement concrete of M15 grade mix,stone aggregate 20mm nominal size excl. the cost of centring and shuttering . | 37.8 | cum | 8,422.45 | ₹3,18,368.61 |
| 7 | Centring and shuttering including strutting, propping etc and removal of formwork. | 94.5 | sqm | 628.95 | ₹59,435.78 |
| 8 | Back filling of nallah muck behind R/walls including all costs and carriages complete | 22 | cum | 1,000 | ₹22,000 |
| 9Carriage of different materils by M.T upto site of work . | |||||
| 9.01 | Sand avg lead 35 Km | 18.24 | cum | 575.54 | ₹10,497.85 |
stage.html
html • 0.04 MB
finance_1059638.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_1059638.xls
BOQ • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .