| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 CrAccepted-AOC | ₹4.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.7 CrRejected-Finance ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹4.7 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹5.1 CrRejected-Finance | ₹5.1 Cr | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | BHAMAR SINGH L2 | M/S SATT SAHIB CONSTRUCTION CO L1 | MAA GAYATRI ASSOCIATES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in all type of soil i/c all lift and lead, T&P etc. including back filling of excavated earth into the space between the structure and disposal of surplus earth as directed by the Engineer-in charge . | 2,966 | M3 | 100 ₹3.0 L | 62 ₹1.8 L | 68 ₹2.0 L |
| 2.00 | Providing & laying nylon crate (size 1.00mx1.00mx1.00m with mesh size 20cmx20cm and weight not less than 300 gm) and filled with HDPE woven bags (confirming to BIS no.11652-2014 of cement bag size (48cmx75cm) filling with local earth/RBM/Silt, machine sewing and placing in position within 60M lead including all cost of material,labour and T&P etc. for making base of spur/cutter/ stud as directed by Engineer- in-Charge. | 2,207 | M3 | 600 ₹13.2 L | 550 ₹12.1 L | 750 ₹16.6 L |
| 3.00 | Providing G.I. wire crate of 8 SWG wire 3.00mx1.50mx0.50m with 15 cmx15 cm mesh double knotted of wire i/c cost of wire, weaving charges, carriage up to site etc. complete as directed by Engineer- in-Charge. | 1,566 | No. | 2,200 ₹34.5 L | 2,125 ₹33.3 L | 2,300 ₹36.0 L |
| 4.00 | Providing G.I. wire crate of 8 SWG wire 3.00mx1.50mx1.00m with 15cm x 15cm mesh double knotted of wire i/c cost of wire, weaving charges, carriage up to site etc. complete as directed by Engineer- in-Charge. | 3,530 | No. | 2,800 ₹98.8 L | 2,800 ₹98.8 L | 3,100 ₹1.1 Cr |
| 5.00 | Providing of boulders 20 kg to 40 kg. in weight i/c cost of material, loading, unloading & stacking with Royalty, contractor profit from Jwalapur/Jakhan or other approved Quarry/ authorised stockist from same Distance to the stacking point of site complete as directed by Engineer- in-Charge. | 17,467 | M3 | 1,650 ₹2.9 Cr | 1,390 ₹2.4 Cr | 290 ₹50.7 L |
| 6.00 | Laying & Packing of Boulder in G.I. wire crate of size 3.00mx 1.50mx1.00m & size 3.00mx1.50mx0.50m excluding cost of boulder (labour only) but including all labour, T&P etc. complete as directed by Engineer- in-Charge. | 19,408 | M3 | 150 ₹29.1 L | 260 ₹50.5 L | 1,500 ₹2.9 Cr |
Updated dates
Tender Value
₹5.3 Cr
EMD Value
₹10.7 L
Closing Date
16 Mar 2026, 5:00 pmClosed
SE IWC SAHARANPUR
OFFICE OF THE SE IWC DEHRADUN ROAD SAHARANPUR
Construction of anti errosion work for protection of village- Aplana and Dhikka kalan situated at left bank of Yamuna River in Block-Sarsawa, Tahsil-Nakur, Distt.-Saharanpur.
2026_UPIDC_1121954_12
06/SE/SRE/2025-26
Open Tender
Civil Works
90 days
SAHARANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹10.7 L
OFFICE OF THE SE IWC DEHRADUN ROAD SAHARANPUR
2 Apr 2026
6 Mar 2026
17 Mar 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
10 Mar 2026
Earth work in excavation in all type of soil i/c all lift and lead, T&P etc. including back filling of excavated earth into the space between the structure and disposal of surplus earth as directed by the Engineer-in charge .
Providing & laying nylon crate (size 1.00mx1.00mx1.00m with mesh size 20cmx20cm and weight not less than 300 gm) and filled with HDPE woven bags (confirming to BIS no.11652-2014 of cement bag size (48cmx75cm) filling with local earth/RBM/Silt, machine sewing and placing in position within 60M lead including all cost of material,labour and T&P etc. for making base of spur/cutter/ stud as directed by Engineer- in-Charge.
Providing G.I. wire crate of 8 SWG wire 3.00mx1.50mx0.50m with 15 cmx15 cm mesh double knotted of wire i/c cost of wire, weaving charges, carriage up to site etc. complete as directed by Engineer- in-Charge.
Providing G.I. wire crate of 8 SWG wire 3.00mx1.50mx1.00m with 15cm x 15cm mesh double knotted of wire i/c cost of wire, weaving charges, carriage up to site etc. complete as directed by Engineer- in-Charge.
Providing of boulders 20 kg to 40 kg. in weight i/c cost of material, loading, unloading & stacking with Royalty, contractor profit from Jwalapur/Jakhan or other approved Quarry/ authorised stockist from same Distance to the stacking point of site complete as directed by Engineer- in-Charge.
Laying & Packing of Boulder in G.I. wire crate of size 3.00mx 1.50mx1.00m & size 3.00mx1.50mx0.50m excluding cost of boulder (labour only) but including all labour, T&P etc. complete as directed by Engineer- in-Charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.43 MB
Booklate-12.pdf
Tender Documents • 2.54 MB
BOQ_2088593.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid