| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹47,790Accepted-Finance | 1 | Accepted-Finance Rates on lower sides | |
| 2 | 2₹56,994+₹9,204 (19.3%)Rejected-Finance | 2 | Rejected-Finance Rates on higher sides | |
| 3 | Rejected-Technical GROUND FLOOR C 002 PRATEEK LAUREL PLOT NO GH 01 SECTOR 120 NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201307 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201307 | - | Rejected-Technical Schedule C declration improper |
| Sl No | Description | Qty | Unit | Ms Ramawati Construction | MODI POWER CONSTRUCTION |
|---|---|---|---|---|---|
| 1.00M&R WORKS. | |||||
| 1.01 | Loading of 36 KV VCB On Pirvate vehicle at 132 KV substation Mau New, Safely carriage of 36 KV VCB from 132KV S/S Mau New to 132 KV S/S Muhammadabad through private vehicle & unloading of 36 KV VCB at 132 KV substation Mohammadabad under ETD Mau | 1 | Job | 5,400 ₹6,372 Lowest | 9,000 ₹10,620 |
| 1.02 | Modification if required of foundation by MS Angle Provided by the department free of cost including cutting in size making reqired hole and welding work for installation of new 36kv VCB. | 1 | Job | 4,200 ₹4,956 | 1,500 ₹1,770 Lowest |
| 1.03 | Shifting and draging of new 36 kv VCB from store site to work site , safely with the help of labour/ hydra | 1 | Job | 2,000 ₹2,360 | 1,200 ₹1,416 Lowest |
| 1.04 | Erection of new ABB make 36 kv vcb of 33KV Spare Bay against Proposed 33KV Hiranpur bay at muhammdabad with the help of derrick pole,pully and rope arrangement. | 1 | Job | 5,200 ₹6,136 Lowest | 7,000 ₹8,260 |
| 1.05 | Making control Cable Connection Of ABB make 36 kv vcb of 33KV Spare Bay against Proposed 33KV Hiranpur bay at muhammdabad. | 1 | Job | 2,500 ₹2,950 Lowest | 2,500 ₹2,950 Lowest |
| 1.06 | Earthing of structure and equipment with earthing MS strip by welding machine and painting of earthing strip by bus green Paint including Cost of other Materials. | 1 | Job | 2,000 ₹2,360 | 1,500 ₹1,770 Lowest |
| 1.07 | Jumpering of 36 kv VCB from BSI to CB and CB to CT | 6 | No. | 4,800 ₹5,664 | 2,700 ₹3,186 Lowest |
| 1.08 | Safely carriage of 33 KV PT from 132KV S/S Mau old to 132 KV S/S Muhammadabad through private vehicle. This work also include Loading of 33 KV PT On Pirvate vehicle at 132 KV substation Mau Old and unloading of the same at 132 KV substation Mohammadabad under ETD Mau . ( 03 Nos 33 KV PT ) | 1 | Job | 4,200 ₹4,956 Lowest | 9,000 ₹10,620 |
| 1.09 | Dismantling of old 3 Phase 33KV PT from 33KV main bus II with the help of derrick Pole, Pulley and rope arrangement, shifting and dragging of 33KV 3 phase PT from its dismantle place to safe place/store with the help of skilled labour. | 1 | Job | 2,400 ₹2,832 Lowest | 3,400 ₹4,012 |
Tender Value
Refer Docs
EMD Value
₹1,000
Closing Date
25 Sept 2025, 2:00 pmClosed
EE ETD MAU
EXECUTIVE ENGINEER ELECTRICITY TRANSMISSION DIVISIOIN , NIZAMUDDINPURA MAU
CARRIAGE AND ERECTION OF 33 KV VCB AND 33 KV PT AT 132 KV S/S MUHMDABAD UNDER ETD MAU
2025_UPTCL_1074013_1
03/ETD(M)/2025-26
Open Tender
Electrical Works
Item Wise
132 KV S/S MUHMDABAD UDER ETD MAU
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
.
₹1,000
16 Oct 2025
15 Sept 2025
26 Sept 2025
15 Sept 2025
25 Sept 2025
15 Sept 2025
M&R WORKS.
Loading of 36 KV VCB On Pirvate vehicle at 132 KV substation Mau New, Safely carriage of 36 KV VCB from 132KV S/S Mau New to 132 KV S/S Muhammadabad through private vehicle & unloading of 36 KV VCB at 132 KV substation Mohammadabad under ETD Mau
Modification if required of foundation by MS Angle Provided by the department free of cost including cutting in size making reqired hole and welding work for installation of new 36kv VCB.
Shifting and draging of new 36 kv VCB from store site to work site , safely with the help of labour/ hydra
Erection of new ABB make 36 kv vcb of 33KV Spare Bay against Proposed 33KV Hiranpur bay at muhammdabad with the help of derrick pole,pully and rope arrangement.
Making control Cable Connection Of ABB make 36 kv vcb of 33KV Spare Bay against Proposed 33KV Hiranpur bay at muhammdabad.
Earthing of structure and equipment with earthing MS strip by welding machine and painting of earthing strip by bus green Paint including Cost of other Materials.
Jumpering of 36 kv VCB from BSI to CB and CB to CT
Safely carriage of 33 KV PT from 132KV S/S Mau old to 132 KV S/S Muhammadabad through private vehicle. This work also include Loading of 33 KV PT On Pirvate vehicle at 132 KV substation Mau Old and unloading of the same at 132 KV substation Mohammadabad under ETD Mau . ( 03 Nos 33 KV PT )
Dismantling of old 3 Phase 33KV PT from 33KV main bus II with the help of derrick Pole, Pulley and rope arrangement, shifting and dragging of 33KV 3 phase PT from its dismantle place to safe place/store with the help of skilled labour.
Erection of structure ALP-02 Nos. and Equipement Earthing by MS strip of size 50x10mm by welding machine and painting of earthing strip by bus green paint including cost of other materials.( MS Strip will be provided by the Contractor )
Erection of new 33KV PT -03 Nos ( R Y & B Phase ) and PT Junction Box for 33KV Main Bus II with the help of derric Pole Pulley and rope arrangement by skilled helper.and also Laying of Control Cable from 40MVA TF II Control Panel to 33KV PT Junction box and making Control cable connection in PT Junction box and Control Panel and all other associated work to complete the job satisfactorily.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .