Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAdmitted-Finance | ₹4.1 L | L1 | Admitted-Finance |
| 2 | L2₹5.3 L+₹1.2 L (29.9%)Admitted-Finance | ₹5.3 L+₹1.2 L (29.9%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S SIDHU GOVT. CONTRACTOR L2 | SK CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | BRIDGES- FOUNDATIONS & SUB- STRUCTURE (21.1) Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. In Ordinary soil (A) Manual Means (a) Depth upto 3 m | 24.3 | Cum | 400 ₹9,720 | 218.81 ₹5,317.08 Lowest |
| 2.00 | BRICK WORK (11.7) First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth | 21.71 | Cum | 9,000 ₹1,95,390 | 7,786.8 ₹1,69,051.43 Lowest |
| 3.00 | PLASTERING & POINTING (15.9) 12.5 mm thick cement plaster 1:4 | 54.6 | Sq.Mtr | 300 ₹16,380 | 215 ₹11,739 Lowest |
| 4.00 | ROAD WORK (24.43 A) 1.2 Meter High G.I. Barbed Wire Fencing ((a)) 1.2 meter high G.I. barbed wire fencing with 1.8 meter angle iron posts 40x40x6mm placed every 3 meters center to center 0.6 meter below ground level, every 15th post, end post, corner post suitably strutted and provided with 9 horizontal lines and two diagonals interwoven with horizontal wires fixed with GI staples, turn buckles etc. including foundation concrete 1:2:4 of size 0.30x0.30x0.75m for each post complete as per technical clause 808 MORT&H specifications. | 390 | Mtr. | 800 ₹3,12,000 | 575.65 ₹2,24,503.5 Lowest |
Tender Value
₹3.8 L
EMD Value
₹7,604
Closing Date
24 Jun 2026, 10:00 amClosed
EXECUTIVE ENGINEER
Executive Engineer Kandi Area DAm Maintenance Division No.2 HOshiarpur
Estimate for Wire Fencing and Boundary Wall in Dholbaha Canal Colony Hoshiarpur
2026_WR_169134_1
6
Open Tender
Civil Works
Item Rate
60 days
HOSHIARPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
₹7,604
Yes
25 Jun 2026
1 Jun 2026
24 Jun 2026
1 Jun 2026
24 Jun 2026
1 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BRIDGES- FOUNDATIONS & SUB- STRUCTURE (21.1) Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. In Ordinary soil (A) Manual Means (a) Depth upto 3 m | 24.3 | Cum | 100 | ₹2,430 |
| 2 | BRICK WORK (11.7) First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth | 21.71 | Cum | 100 | ₹2,171 |
| - | PLASTERING & POINTING (15.9) 12.5 mm thick cement plaster 1:4 | 54.6 | Sq.Mtr | 100 | ₹5,460 |
| - | ROAD WORK (24.43 A) 1.2 Meter High G.I. Barbed Wire Fencing ((a)) 1.2 meter high G.I. barbed wire fencing with 1.8 meter angle iron posts 40x40x6mm placed every 3 meters center to center 0.6 meter below ground level, every 15th post, end post, corner post suitably strutted and provided with 9 horizontal lines and two diagonals interwoven with horizontal wires fixed with GI staples, turn buckles etc. including foundation concrete 1:2:4 of size 0.30x0.30x0.75m for each post complete as per technical clause 808 MORT&H specifications. | 390 | Mtr. | 100 | ₹39,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_344368.xls
BOQ • 0.26 MB
Corrigendum2.pdf
PDF • 0.12 MB
Corrigendum1WireFencing.pdf
PDF • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .