| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.9 CrAdmitted-Finance | ₹14.9 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | JK Electric Engineers Pvt. Ltd. L1 |
|---|---|---|---|---|
| 1.00Works at GSS Pampore | ||||
| 2.00Design, Engineering, Manfacture, Shop Testing, Supply including packing and forwarding, Transportation and delivery at site as per Technical Specifications and approved drawings | ||||
| 3.00 | 50 MVA, 132/33 kV Three Phase Power Transformer with OLTC, HV and LV connectors and other required accessories and fittings with online DGA monitoring kit, online dehydration kit and maintenance-free automatic breathers as per detailed Technical specs as per SBD incliding other related works/accessories & Civil works required for its complete commissioning. (Current density for HV/LV winding not more than 2.4 A/sq mm. Core Flux density not more than 1.5T) alongwith spares strictly as per the details contained in the Standard Bidding Document. The Transformer supplied is without NIFPS & SCADA Compatible RTCC | 1 | No. | 7,28,00,000 ₹7,28,00,000 Lowest |
| 4.00 | 132KV Post Insulators Solid Core Type/ Polymer
Type, Power Frequency Withstand Voltage 275
KV RMS Dry lightning impulse withstand voltage
± 650 (KVP) | 3 | No. | 24,000 ₹72,000 Lowest |
| 5.00Handling, Storage, Preservation, Erection, Testing and commissioning of equipments and material including all comsumables required for 50 MVA Power Transformers etc including Ferrules, Lugs, Printed sleeves, cable ties, cable glands, Tags, minor cutting, wielding works etc. complete in all respects | ||||
| 6.00 | 50 MVA, 132/33 kV Three Phase Power Transformer with OLTC, HV and LV connectors and other required accessories and fittings with online DGA monitoring kit, online dehydration kit and maintenance-free automatic breathers as per detailed Technical specs as per SBD incliding other related works/accessories & Civil works required for its complete commissioning. (Current density for HV/LV winding not more than 2.4 A/sq mm. Core Flux density not more than 1.5T) . | 1 | No. | 7,00,000 ₹7,00,000 Lowest |
| 7.00 | 132KV Post Insulators Solid Core Type/ Polymer
Type, Power Frequency Withstand Voltage 275
KV RMS Dry lightning impulse withstand voltage
± 650 (KVP) | 3 | No. | 2,000 ₹6,000 Lowest |
| 8.00Civil Works | ||||
| 9.00 | Retrofitting of Existing Power Transformer Foundations for Installation of 50 MVA Transformer in 1:1.5:3 Mix( Min Qty 24.22 Cum) including Dismantalling work =2.65 Cum, Earth Work= 15.84 Cum, 1:4:8 Mix= 1.34 Cum, Reinforcement=463 Kg, Form work,plaster and Carriage-COMPLETE JOB as per instructions of Site Engineer. | 1 | Job | 2,50,000 ₹2,50,000 Lowest |
| 10.00 | Demolishing R.C.C. work ( Minimum Qty 14.64 Cum) manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. | 1 | Job | 1,00,000 ₹1,00,000 Lowest |
Tender Value
₹12.0 Cr
EMD Value
₹23.9 L
Closing Date
10 Jun 2026, 2:00 pmClosed
Executive Engineer TLMD-II Pampore
Executive Engineer TLMD-II Pampore
Supply Erection Testing and Commissioning of 02 No. 50 MVA 132/33KV Three Phase Power Transformers Buffer at 132/33KV GSS Pampore and Amargarh of JKPTCL Kashmir
2026_PDD_307596_1
TLMD-II/01 of 2026-27
Open Tender
Electrical Works
Turn-key
270 days
GSS Pampore and GSS Amargarh
Please refer Tender documents.
7 documents required · 7 mandatory
₹11,000
Yes
Accounts Officer with Chief Engineer JKPTCL Kashmi
₹23.9 L
Yes
Office of the Chief Engineer JKPTCL KASHMIR
20 Jul 2026
9 Apr 2026
11 Jun 2026
9 Apr 2026
10 Jun 2026
16 Apr 2026
9 Apr 2026 - 16 Apr 2026
15 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Works at GSS Pampore | - | - | - | - |
| 2 | Design, Engineering, Manfacture, Shop Testing, Supply including packing and forwarding, Transportation and delivery at site as per Technical Specifications and approved drawings | - | - | - | - |
| 3 | 50 MVA, 132/33 kV Three Phase Power Transformer with OLTC, HV and LV connectors and other required accessories and fittings with online DGA monitoring kit, online dehydration kit and maintenance-free automatic breathers as per detailed Technical specs as per SBD incliding other related works/accessories & Civil works required for its complete commissioning. (Current density for HV/LV winding not more than 2.4 A/sq mm. Core Flux density not more than 1.5T) alongwith spares strictly as per the details contained in the Standard Bidding Document. The Transformer supplied is without NIFPS & SCADA Compatible RTCC | 1 | No. | - | - |
| 4 | 132KV Post Insulators Solid Core Type/ Polymer
Type, Power Frequency Withstand Voltage 275
KV RMS Dry lightning impulse withstand voltage
± 650 (KVP) | 3 | No. | - | - |
| 5 | Handling, Storage, Preservation, Erection, Testing and commissioning of equipments and material including all comsumables required for 50 MVA Power Transformers etc including Ferrules, Lugs, Printed sleeves, cable ties, cable glands, Tags, minor cutting, wielding works etc. complete in all respects | - | - | - | - |
| 6 | 50 MVA, 132/33 kV Three Phase Power Transformer with OLTC, HV and LV connectors and other required accessories and fittings with online DGA monitoring kit, online dehydration kit and maintenance-free automatic breathers as per detailed Technical specs as per SBD incliding other related works/accessories & Civil works required for its complete commissioning. (Current density for HV/LV winding not more than 2.4 A/sq mm. Core Flux density not more than 1.5T) . | 1 | No. | - | - |
| 7 | 132KV Post Insulators Solid Core Type/ Polymer
Type, Power Frequency Withstand Voltage 275
KV RMS Dry lightning impulse withstand voltage
± 650 (KVP) | 3 | No. | - | - |
| 8 | Civil Works | - | - | - | - |
| 9 | Retrofitting of Existing Power Transformer Foundations for Installation of 50 MVA Transformer in 1:1.5:3 Mix( Min Qty 24.22 Cum) including Dismantalling work =2.65 Cum, Earth Work= 15.84 Cum, 1:4:8 Mix= 1.34 Cum, Reinforcement=463 Kg, Form work,plaster and Carriage-COMPLETE JOB as per instructions of Site Engineer. | 1 | Job | - | - |
| 10 | Demolishing R.C.C. work ( Minimum Qty 14.64 Cum) manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. | 1 | Job | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Tendernotice_1.pdf
PDF • 0.83 MB
Tendernotice_2.pdf
PDF • 0.97 MB
Tendernotice_3.pdf
PDF • 0.80 MB
Tendernotice_4.pdf
PDF • 0.59 MB
Tendernotice_5.pdf
PDF • 1.17 MB
Tendernotice_6.pdf
PDF • 0.80 MB
Tendernotice_7.pdf
PDF • 0.75 MB
Tendernotice_8.pdf
PDF • 1.05 MB
Tendernotice_9.pdf
PDF • 0.67 MB
Tendernotice_10.pdf
PDF • 1.20 MB
Tendernotice_11.pdf
PDF • 0.39 MB
Tendernotice_12.pdf
PDF • 1.79 MB
BOQ_997816.xls
BOQ • 0.24 MB
EXTENSION50MVAIII.pdf
PDF • 0.53 MB
50MVAEXTENSIONII.pdf
PDF • 0.53 MB
EXTENSIONBUFFER50MVA.pdf
PDF • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .