Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 LAccepted-AOC P O KUMARDIDHI BARDHAMAN BARDHAMAN WEST BENGAL 713363 | BARDHAMAN | PASCHIM BARDHMAN | WEST BENGAL | 713363 | L1 | Accepted-AOC TC recommendation | |
| 2 | L2₹9.0 L+₹41,851.27 (4.89%)Rejected-Finance DALURBANDH COLLI PANDESWAR PANDESWAR BARDHAMAN WEST BENGAL INDIA 713346 | PANDESWAR | BARDHAMAN | WEST BENGAL | 713346 | L2 | Rejected-Finance TC recommendation | |
| 3 | L3₹9.2 L+₹66,552.76 (7.77%)Rejected-Finance BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | L3 | Rejected-Finance TC recommendation |
Tender Value
₹8.6 L
EMD Value
₹10,800
Closing Date
8 Aug 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Installation and commissioning of 2 nos (78Lps, 150 m head and 35LPs 90M head ) pump with delivery and suction in RVIIC seam of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area .
2023_ECL_284559_1
ECL/GM/BA/E TENDER/23-24/EnM/44 Dt. 28.07.2023
Open Tender
Electrical and Maintenance Works
Item Rate
45 days
Nakrakonda Kumardihi B Colliery
Please refer to NIT document
5 documents required · 5 mandatory
₹10,800
20 Oct 2023
28 Jul 2023
9 Aug 2023
28 Jul 2023
8 Aug 2023
28 Jul 2023
28 Jul 2023 - 1 Aug 2023
Amount
Item Description/ Heading
Transportation of 150 m head 78LPS head centrifugal pump 550V ,240HP motor 240 HP controlling switch, bed plate 550 V 300 amps controlling switch , connection and power cables from store to pit no 6 top for lowering .
Lowering and transportation of centrifugal pump , motor , starter , controlling breaker , bed plate controlling switch , connection and Power cables from pit top no 6 to panel no 4 23L/-9D in RVII C seam.
Laying and hanging of power cables as per availability of power circuit from substation to pump istallation site .
Welding flanges in 100 nos of 4" Mspipe & bends T pipe etc delivery line .
Lowering transportation and laying of flange fitting 8"/6" 8 nos and 4" 20 nos of MS pipe and bends from welding shop to RVII C seam to pump installation site .
Complete fitting of pump 8"/6" suction line and 4"85 mtr delivery line testing and commissioning of pump .
welding flanges on both sides 450 (75 nos ) 4" flange fitting MS pipes at Colliery welding / workshop in CM Project .
Transportation of 450(75nos) 4" flange fitting MS pipes from colliery welding shop to incline no 2 mouth .
Manual transportation and laying of 4" flange fitted MS pipes 450 m(75nos) from incline no 2 mouth to RVIIA seam and from incline mouth to surface reservoir in CM.
Complete installation of 4" MS pipe range from RVIIA seam to incline no 2 mouth and incline no 2 mouth to surface reservoir in CM Project .
Manual transportation of two nos of 4" rising sliuce valve bends one T and installing the same in the 4" pipe range at RVII A seam .
Manual transportation of two nos of 4" rising sluice valve bends two Ts and installing the same in the 4" pipe range in delivery range in RVIIC seam.
Complete testing anf trail run of installed pipe range for any leakages and adjusting the pipe range near incline wall for a clear path for MUVV movement .
Dismantling and loading of existing 90 m head pump set ( complete with pump , motor , bed plate ) with electricals (550 V FLP controlling starter , connected valves installed in -27/-10D.
Transportating from -27L/-10D to -25L/-10D and installation of 90 m head pump set electricals(550VFLP controlling , starter , connecting cables ) suction and delivery line with connection valves .
Dismantling and loading of existing 90 m head pump set ( complete with pump , motor , bed plate ) with electricals (550VFLP controlling starter , connection cables ) suction , delivery line , connected valves installed in -25/-10D.
Transporting from -25L/-10L to -23L/-10D and installation of 90m head pump set ( complete with pump , motor bed plate ) with electricals (550VFLP controlling starter connection cables ) suction and delivery line with connected valves .
cost of MS bolt 5/8" X 3"
cost of MS bolt 5/8" X 2"
Cost for 4" ring type 12 mm thick MS flange
Cost of 4" CI rising sluice valve 950PSi valve press 750PSi
Codt for 4" bend ,90 deg long and havey duty
Cost for 6" cast steel foot valve
Cost for 4 mm welding rod .
Cost for DA +Oxygen (3:1)
Total impact of GST for the purpose of CTC
SUBHAS ROY
BABLU SINHA
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .