| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC | ₹1.7 Cr | L1 | Accepted-AOC Lowest Quoted |
| 2 | L2₹1.9 Cr+₹28.5 L (17.1%)Accepted-AOC | ₹1.9 Cr+₹28.5 L (17.1%) | L2 | Accepted-AOC Highest Quoted |
Tender Value
₹1.6 Cr
EMD Value
₹3.3 L
Closing Date
12 Aug 2022, 3:00 pmClosed
PROJECT DIRECTOR
DRDA, COLLECTORATE, TIRUPPUR.
MRL06-Uthiyur - Vanjipalayam road and Kirakkattupudur road and Nilali Road
2022_RDTN_119424_1
TN31187
Open Tender
Civil Works - Roads
Item Rate
270 days
KUNDADAM
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3.3 L
DRDA, COLLECTORATE, TIRUPPUR.
31 Oct 2022
13 Jul 2022
12 Aug 2022
13 Jul 2022
12 Aug 2022
13 Jul 2022
27 Jul 2022
Amount
1.Upgradation of the road from Uthiyur - Vanjipalayam road to Keerakkattupudur (Via. Nilali) Km 0/600 - 3/810
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Scarfing the existing bituminous road surface to a depth of 150 mm and disposalof scanfied material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 404.(Grading II)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 404.(Grading III)
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Providing and laying Surface Dressing as wearing course consisting of layer of bituminous binder laid on the prepared surface , followed by a cover of crushed stone Aggregates of specified size and rolling with a three wheel 80-100 kN static roller including cleaning the road surface as per Technical Specification Clause507.( Case - I Nominal chipping size 13.20mm)
Providing and laying Surface Dressing as wearing course consisting of layer of bituminous binder laid on the prepared surface , followed by a cover of crushed stone Aggregates of specified size and rolling with a three wheel 80-100 kN static roller including cleaning the road surface as per Technical Specification Clause507.( Case - II Nominal chipping size 9.5mm)
Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeding vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground levels as per drawings and Technical Specification Clause 801
Logo board
Cautionary Sign board
Circular Sign board
Octozonal Sign board
Citizen board
Name board
Maintanance board
Provision for Reflector
Provision for Kilometre Stones
Provision for Hectametre Stones
Provision for guard Stones
Road Marking with hot applied hermoplastic compound with Reflectorising Glass Beads on Bituminous surface
Construction of 1.5m RCC Slab Culvert @ Ch. 2935
Earthwork excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation
Supplying and filling foundation and basement with filling sand in layers not more than 15 cm thick well rammed , wateed and compacted complete complying with satndard specifications and as directed.
Cement concrete 1:2.5: 5 mix using M15 mm HBG metal for foundation including watering wherever necessary and laind in layes of not more than 15 cm thick compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:2:4 mix using M20 mm Grade HBG meatl for foundation including watering wherever necessary and laid in layers of not more than 15 cm thick, compacting etc., complete complying with satndard specifications and as directed., BELOW SILL LEVEL
Cement concrete 1:2:4 mix using M20 mm Grade HBG meatl for foundation including watering wherever necessary and laid in layers of not more than 15 cm thick, compacting etc., complete complying with satndard specifications and as directed., ABOVE SILL LEVEL
Cement concrete 1:2:4 mix using M20 mm Grade HBG meatl for foundation including watering wherever necessary and laid in layers of not more than 15 cm thick, compacting etc., ABOVE SILL LEVEL
Cement concrete 1:1.5:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges , centering and shuttering but including curing and shall be finished smooth with CM 1:3 , 12 mm thick and with kraft paper without claiming as extra as directed by the departmental officers complete complying with standard specifications.
Supplying and fabricating and placing in position MS steel or ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification( mS rod or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate). the binding wire shall supplied by the contractor.
providing and fixing 20mm thick compressible fibre board
Providing and fixing Tar Paper for bearing Between Bed block and deck slab
Providing weepholes in brick masonry / stone masonry , plain/ reinforced concrete abutment , wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V) : 20 (H) towards drawing face complete as per drawing and technical specifiaction cluses 614,709,1204.3.7
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc., complete complying with satndard specification and as directed by the departmental officer.
Construction of 3.0 m RCC Slab culvert @ Ch. 3505
Earthwork excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation
Supplying and filling foundation and basement with filling sand in layers not more than 15 cm thick well rammed , wateed and compacted complete complying with satndard specifications and as directed.
Cement concrete 1:2.5: 5 mix using 40 mm HBG metal for foundation including watering wherever necessary and laind in layes of not more than 15 cm thick compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:2: 4 mix using 40 mm HBG metal for foundation including watering wherever necessary and laind in layes of not more than 15 cm thick compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:2: 4 mix using 40 mm HBG metal for foundation including watering wherever necessary and laind in layes of not more than 15 cm thick compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:2:4 mix using 20 mm Grade HBG meatl for foundation including watering wherever necessary and laid in layers of not more than 15 cm thick, compacting etc., complete complying with satndard specifications and as directed.,
Cement concrete 1:1.5:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges , centering and shuttering but including curing and shall be finished smooth with CM 1:3 , 12 mm thick and with kraft paper without claiming as extra as directed by the departmental officers complete complying with standard specifications.
Supplying and fabricating and placing in position MS steel or ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification( mS rod or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate). the binding wire shall supplied by the contractor.
Providing and fixing Tar Paper for bearing Between Bed block and deck slab
providing and fixing 20mm thick compressible fibre board
Providing weepholes in brick masonry / stone masonry , plain/ reinforced concrete abutment , wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V) : 20 (H) towards drawing face complete as per drawing and technical specifiaction cluses 614,709,1204.3.7
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc., complete complying with satndard specification and as directed by the departmental officer.
Existing 20 Row Piped Causeway at Ch. 2405-2495 (Wearing Coat Only)
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
Dismantling Existing CD works at Ch. 2935, 3505
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202., Reinforced Cement Concrete
Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202.
Construction of Protective work at Ch. 2160-2200, 2205-2230, 2340-2350, 3015-3045, 3525-3550m
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 2.5 : 5 mix using M15 HBG metal , including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.for foundation
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.( Above Sill Level )
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.( Above Sill Level )
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Providing and fixing 20mm thick compressible fiber board in expansion joint complete as per drawing and MORD technical specifications.
Maintenanace I year
Maintenanace II year
Maintenanace III year
Maintenanace IV year
Maintenanace V year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
DPM SREE MURUGAN AND CO
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .