Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.7 LAccepted-AOC 777 AMAR NAGAR VILLAGE TOWN CITY RAE BARELI RAEBARELI UTTAR PRADESH 229001 INDIA | RAE BARELI | UTTAR PRADESH | 229001 | L1 | Accepted-AOC L1 BIDDER | |
| 2 | L2₹29.3 L+₹2.7 L (10.0%)Rejected-Finance NO 29 CANTONMENT NEAR ANJALI CINEMA HALL SHILLONG 793001 | SHILLONG | EAST KHASI HILLS | MEGHALAYA | 793001 | L2 | Rejected-Finance Other than L1 bidder | |
| 3 | L3₹32.5 L+₹5.9 L (22.1%)Rejected-Finance C O GUPTA EMPORIUM AR BAZAR HAPPY VALLEY SHILLONG 793 004 | EAST KHASI HILLS | MEGHALAYA | 793004 | L3 | Rejected-Finance Other than L1 bidder | |
| 4 | L4₹33.2 L+₹6.6 L (24.6%)Rejected-Finance | L4 | Rejected-Finance Other than L1 bidder | |
| 5 | L5₹34.1 L+₹7.4 L (27.9%)Rejected-Finance OPPOSITE MERCEDES SHOWROOM NALAPARA BIHARBARI GUWAHATI 781029 ASSAM | RI BHOI | MEGHALAYA | 781029 | L5 | Rejected-Finance Other than L1 bidder |
Tender Value
₹32 L
EMD Value
₹64,000
Closing Date
23 Feb 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE Shillong
HQ CWE Shillong, SE Falls, Shillong - 793011
INTERNAL AND EXTERNAL SMART PERIODICAL SERVICES TO OTM AND MD ACCN OF VARIOUS LOCATIONS IN SHILLONG UNDER GE SHILLONG
2024_MES_639246_1
8737/SHL/E8
Open Tender
Civil Works
Item Rate
180 days
Shillong
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE Shillong
₹64,000
Yes
6 Nov 2024
26 Jan 2024
24 Feb 2024
26 Jan 2024
23 Feb 2024
9 Feb 2024
Amount
Complete removal of existing treatment on wall/ roof projections including facia, cornices etc by scrapping with mechanical sander (having mechanical vaccum mechanism) with sanding pad of appropriate grit to make surface clean, free from dust, loose paint etc by skilled labour complete all as specified and directed.
Material and labour for single component polymer modified repair mortar with compressive strength minimum 38 MPA at 28 days (ASTM C 109:99) and tensile strength minimum 2.5 Mpa (ASTM C 307) up to 15mm in a single coat @34 kg per sqm for 15mm thickness as per manufacturer's instructions complete all as specified and directed. (Make - Fosro Renderec HS extra single component SICA TOP 120 HS)
Material and labour for waterproof cement based putty @ 1 Kg (undiluted) per sqm of average thickness 1 mm over the plastered/old painted wall after scrapping to prepare the surface even and smooth complete and sanding of the putty surface with mechanical wall sander (having mechanical vacuum mechanism) having RPM not less than 1500, sanding pad of 240 Grit or above to make the surface free from dust etc. by skilled labour as per following steps:- Step 1) Mix the putty powder by adding water as per manufacturer's instructions and mix it with putty mixer with the mixing capacity of min 2.5 kg putty per minute. Step 2) Apply the first coat of the prepared mix with the help of fully automatic airless spray machine of putty application having flow speed of max 6 ltrs per minutes with a maximum pressure 3300 PSI. Step 3) Allow 6-8 hrs time to dry the putty surface.
NOTES :- (a) The work pertaining to periodical services & Water Proofing shall be executed by authorized applicator through manufacturer of which the materials i.e. Paint, Distemper, Putty etc. is proposed to be used by the contractor and approved by GE. (b) The cost of scaffolding upto 10m height of building shall be included in the quoted rate. (c) The contractor shall upload MOU letter with any one of manufacturer and also with their authorised applicator mentioned in the tender alongwith their bid in cover-I failing which his bid will be rejected. Authorised applicator shall have valid authorisation letter from the manufacturer (Minimum regional HQs) and shall have been issued not less than 30 days from the date of commencement of the work. The authorisation letter needs to be valid for the complete period of execution of the painting work. (d) After preparation of the surface, Engr-in-Charge shall approve the same before applying primer and finishing coats. (e) Building wise stage passing register shall be maintained and shall be signed by Engr-in-Charge and contractor. (f) The equipments to be used in the work shall be certified by the manufacturer with whom the MOU been entered into. (g) Contractor shall submit approved company generated 05 years warranty card at the time of submission of RAR & Final Bill. 15% amount of this item will be retained in FB for a period of 05 years from the certified date of completion. (h) Masking of windows / doors during spray painting using polythene film is inluded in the quoted rates. (j) Cleaning and clearing of site of painting, mats etc after completion of work is included in the quoted rate.
Material and labour for applying two coats of oil bound distemper using Airless spray technology with max working pressure of 3300 PSI and capable of operating single spray gun with a max material hose length of 30 mtr the spray machine should be of reputed manufacturer with pro guard technology and capability of tracking pressure and paint usage and certified by paint manufacturer and as mentioned in PS and accessories for applying distemper should be able to spray in hard to reach areas and penetration of distemper on the surface complete all as specified and directed. Note : - Sanding of surface to be done by mechanical sander with 1500 - 2700 rpm, with internal dust extraction system for clean environment certified by paint manufacturer. Proper masking to be carried out before primer and paint application).
NOTES :- (a) Sanding of surface to be done by mechanical sander with 1500 - 2700 rpm, with internal dust extraction system for clean environment certified by paint manufacturer. Proper masking to be carried out before primer and paint application). (b)The work pertaining to periodical services & Water Proofing shall be executed by authorized applicator through manufacturer of which the materials i.e. Paint, Distemper, Putty etc. is proposed to be used by the contractor and approved by GE. (c) The cost of scaffolding upto 10m height of building shall be included in the quoted rate. (d) The contractor shall upload MOU letter with any one of manufacturer and also with their authorised applicator mentioned in the tender alongwith their bid in cover-I failing which his bid will be rejected. Authorised applicator shall have valid authorisation letter from the manufacturer (Minimum regional HQs) and shall have been issued not less than 30 days from the date of commencement of the work. The authorisation letter needs to be valid for the complete period of execution of the painting work. (e) After preparation of the surface, Engr-in-Charge shall approve the same before applying primer and finishing coats. (f) Building wise stage passing register shall be maintained and shall be signed by Engr-in-Charge and contractor. (g) The equipments to be used in the work shall be certified by the manufacturer with whom the MOU been entered into. (h) Contractor shall submit approved company generated 05 years warranty card at the time of submission of RAR & Final Bill. 15% amount of this item will be retained in FB for a period of 05 years from the certified date of completion. (j) Masking of windows / doors during spray painting using polythene film is inluded in the quoted rates. (k) Cleaning and clearing of site of painting, mats etc after completion of work is included in the quoted rate.
Material and labour for applying two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/10 sqm over and including priming coat of exterior primer applied 0.90 litre 10 sqm complete all as specified and directed.
NOTES :- (a) Primer and emulsion application to be caned out through air less spray machine (Only mechanical application allowed except in paint application on bands/ chajja/ building edges/ borders/ projections where contrasting color as specified and directed is to be applied) (b)The work pertaining to periodical services & Water Proofing shall be executed by authorized applicator through manufacturer of which the materials i.e. Paint, Distemper, Putty etc. is proposed to be used by the contractor and approved by GE. (c) The cost of scaffolding upto 10m height of building shall be included in the quoted rate. (d) The contractor shall upload MOU letter with any one of manufacturer and also with their authorised applicator mentioned in the tender alongwith their bid in cover-I failing which his bid will be rejected. Authorised applicator shall have valid authorisation letter from the manufacturer (Minimum regional HQs) and shall have been issued not less than 30 days from the date of commencement of the work. The authorisation letter needs to be valid for the complete period of execution of the painting work. (e) After preparation of the surface, Engr-in-Charge shall approve the same before applying primer and finishing coats. (f) Building wise stage passing register shall be maintained and shall be signed by Engr-in-Charge and contractor. (g) The equipments to be used in the work shall be certified by the manufacturer with whom the MOU been entered into. (h) Contractor shall submit approved company generated 05 years warranty card at the time of submission of RAR & Final Bill. 15% amount of this item will be retained in FB for a period of 05 years from the certified date of completion. (j) Masking of windows / doors during spray painting using polythene film is inluded in the quoted rates. (k) Cleaning and clearing of site of painting, mats etc after completion of work is included in the quoted rate.
Material and labour for one coat of acrylic water based exterior grade primer @0.9 ltr (undiluted)/10 sqm diluted with water in 1:1 ratio to be applied with fully automatic airless spray machine of paint application with a flow speed of minimum 1 ltr per minute having a pressure of 3300 PSI Allow 6-8 hrs to dry the surface for painting of subsequent coats complete all as specified and directed. NOTES :- (a) The work pertaining to periodical services & Water Proofing shall be executed by authorized applicator through manufacturer of which the materials i.e. Paint, Distemper, Putty etc. is proposed to be used by the contractor and approved by GE. (b) The cost of scaffolding upto 10m height of building shall be included in the quoted rate. (c) The contractor shall upload MOU letter with any one of manufacturer and also with their authorised applicator mentioned in the tender alongwith their bid in cover-I failing which his bid will be rejected. Authorised applicator shall have valid authorisation letter from the manufacturer (Minimum regional HQs) and shall have been issued not less than 30 days from the date of commencement of the work. The authorisation letter needs to be valid for the complete period of execution of the painting work. (d) After preparation of the surface, Engr-in-Charge shall approve the same before applying primer and finishing coats. (e) Building wise stage passing register shall be maintained and shall be signed by Engr-in-Charge and contractor. (f) The equipments to be used in the work shall be certified by the manufacturer with whom the MOU been entered into. (g) Contractor shall submit approved company generated 05 years warranty card at the time of submission of RAR & Final Bill. 15% amount of this item will be retained in FB for a period of 05 years from the certified date of completion. (h) Masking of windows / doors during spray painting using polythene film is inluded in the quoted rates. (j) Cleaning and clearing of site of painting, mats etc after completion of work is included in the quoted rate.
Material and labour for two coats water based premium acrylic smooth exterior emulsion of approved colour with silicon additive & Colour stay Technology, Excellent Dirt Pick up resistance with low VOC less than 50 gram/ litre as per the LEEDS specifications, Anti Algae properties in two coats @ 1.79 ltr (undiluted)/ 10 sqm diluted with water as per manufacturer instructions applied over priming coat with fully automatic airless spray machine of paint application with a flow speed of minimum 1 ltr per minute having a pressure of 3300 PSI. Allow 6-8 hrs to dry the surface in both the coats of paint complete all as specified and directed.
NOTES :- (a) The work pertaining to periodical services & Water Proofing shall be executed by authorized applicator through manufacturer of which the materials i.e. Paint, Distemper, Putty etc. is proposed to be used by the contractor and approved by GE. (b) The cost of scaffolding upto 10m height of building shall be included in the quoted rate. (c) The contractor shall upload MOU letter with any one of manufacturer and also with their authorised applicator mentioned in the tender alongwith their bid in cover-I failing which his bid will be rejected. Authorised applicator shall have valid authorisation letter from the manufacturer (Minimum regional HQs) and shall have been issued not less than 30 days from the date of commencement of the work. The authorisation letter needs to be valid for the complete period of execution of the painting work. (d) After preparation of the surface, Engr-in-Charge shall approve the same before applying primer and finishing coats. (e) Building wise stage passing register shall be maintained and shall be signed by Engr-in-Charge and contractor. (f) The equipments to be used in the work shall be certified by the manufacturer with whom the MOU been entered into. (g) Contractor shall submit approved company generated 05 years warranty card at the time of submission of RAR & Final Bill. 15% amount of this item will be retained in FB for a period of 05 years from the certified date of completion. (h) Masking of windows / doors during spray painting using polythene film is inluded in the quoted rates. (j) Cleaning and clearing of site of painting, mats etc after completion of work is included in the quoted rate.
Material and labour for two coats of smooth interior acrylic emulsion with rich matt finish having VOC less than 50 grams per ltr complying LEEDS criteria @1 ltr (unndiluted) /10 sqm diluted with water in 2:1 ratio applied over priming coat with fully automatic airless spray machine of paint application with a flow speed of minimum 1 ltr per minute having a pressure of 3300 PSI. Allow 6-8 hrs to dry the surface in both the coats of paint as per manufacturer instructions complete all as specified and directed.
NOTES :- (a) The work pertaining to periodical services & Water Proofing shall be executed by authorized applicator through manufacturer of which the materials i.e. Paint, Distemper, Putty etc. is proposed to be used by the contractor and approved by GE. (b) The cost of scaffolding upto 10m height of building shall be included in the quoted rate. (c) The contractor shall upload MOU letter with any one of manufacturer and also with their authorised applicator mentioned in the tender alongwith their bid in cover-I failing which his bid will be rejected. Authorised applicator shall have valid authorisation letter from the manufacturer (Minimum regional HQs) and shall have been issued not less than 30 days from the date of commencement of the work. The authorisation letter needs to be valid for the complete period of execution of the painting work. (d) After preparation of the surface, Engr-in-Charge shall approve the same before applying primer and finishing coats. (e) Building wise stage passing register shall be maintained and shall be signed by Engr-in-Charge and contractor. (f) The equipments to be used in the work shall be certified by the manufacturer with whom the MOU been entered into. (g) Contractor shall submit approved company generated 05 years warranty card at the time of submission of RAR & Final Bill. 15% amount of this item will be retained in FB for a period of 05 years from the certified date of completion. (h) Masking of windows / doors during spray painting using polythene film is inluded in the quoted rates. (j) Cleaning and clearing of site of painting, mats etc after completion of work is included in the quoted rate.
Taking down cement plaster or cement lime plaster of any description on brick work, conrete work or stone walls including raking out joints, hacking for key and scrubbing down with water complete all as specified and directed.
Material and labour for rendering 15mm thick in CM 1:6 on brick or concrete surface, finished even and fair without using extra cement, complete all as specified and directed.
Material and labour for rendering 15mm thick in two layers (10mm thick backing layer + 5mm thick top layer) in cement mortar 1:4 on fair faces of brick masonry or concrete surfaces of walls, chajja, fins, facia etc upto 3 stories height, mixed with water proofing compound (ISI marked) @ 3% by weight of cement mixed in 5mm thick top layer or as per manufacturer’s instructions, finished even & smooth without using extra cement complete all as specified and as direted. NOTE:- (i) Supply only water proofing compound shall be measured and paid separately under relevant items. (ii) Cost of scaffolding upto 3 stories height of building is included in quoted rate. .
Supply only integral water proofing compound complete all as specified and directed
Material and labour for rendering 5 mm thick in cement mortar 1:3 on concrete surfaces of ceiling, finished even & smooth without using extra cement complete all as specified and directed.
Material and labour for preparation of new plastered surfaces of walls and applying two coats of oil bound distemper using Airless spray technology with max working pressure of 3300 PSI and capable of operating single spray gun with a max material hose length of 30 mtr, the spray machine should be of reputed manufacturer with pro guard technology and capability of tracking pressure and paint usage and certified by paint manufacturer and as mentioned in PS and accessories for applying distemper should be able to spray in hard to reach areas and penetration of distemper on the surface complete all as specified and directed.
NOTES :- (a) Sanding of surface to be done by mechanical sander with 1500 - 2700 rpm, with internal dust extraction system for clean environment certified by paint manufacturer. Proper masking to be carried out before primer and paint application). (b) The work pertaining to periodical services & Water Proofing shall be executed by authorized applicator through manufacturer of which the materials i.e. Paint, Distemper, Putty etc. is proposed to be used by the contractor and approved by GE. (c) The cost of scaffolding upto 10m height of building shall be included in the quoted rate. (d) The contractor shall upload MOU letter with any one of manufacturer and also with their authorised applicator mentioned in the tender alongwith their bid in cover-I failing which his bid will be rejected. Authorised applicator shall have valid authorisation letter from the manufacturer (Minimum regional HQs) and shall have been issued not less than 30 days from the date of commencement of the work. The authorisation letter needs to be valid for the complete period of execution of the painting work. (e) After preparation of the surface, Engr-in-Charge shall approve the same before applying primer and finishing coats. (f) Building wise stage passing register shall be maintained and shall be signed by Engr-in-Charge and contractor. (g) The equipments to be used in the work shall be certified by the manufacturer with whom the MOU been entered into. (h) Contractor shall submit approved company generated 05 years warranty card at the time of submission of RAR & Final Bill. 15% amount of this item will be retained in FB for a period of 05 years from the certified date of completion. (j) Masking of windows / doors during spray painting using polythene film is inluded in the quoted rates. (k) Cleaning and clearing of site of painting, mats etc after completion of work is included in the quoted rate.
Material and labour for preparation of old surfaces on wall and applying one coat of oil bound distemper with roller on old treated surface of wall etc complete all as specified and directed.
Material and labour for preparation of surfaces and applying two coats of oil bound distemper over 1mm thick wall care putty with roller on old treated surfaces of wall etc. complete all as specified and directed.
Material and labour for preparation of surfaces and applying two coats of oil bound distemper with roller on new treated surfaces of ceiling etc. complete all as specified and directed.
Material and labour for preparation of new wall surafces and applying two finishing coats of acrylic emulsion paint, anti fungal resistance, dirt resistance exterior paint of required shade, over and including one coat of primer applied over and including 1 mm thick exterior putty on new surfaces of walls complete all as specified and directed.
Material and labour for complete removal of existing treatment of surface and applying two or more coats of 100% premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489-2004, alkali & fungal resistance dirt resistance exterior paint of required shade (company depot tinted) with silicon additives @ 1.43 litre/10 sqm over and including priming coat of exterior primer @ 0.90/10 Sqm over new surfaces complete all as specified and directed. NOTES :- (a) The work pertaining to periodical services & Water Proofing shall be executed by authorized applicator through manufacturer of which the materials i.e. Paint, Distemper, Putty etc. is proposed to be used by the contractor and approved by GE. (b) The cost of scaffolding upto 10m height / 3 storyed of building shall be included in the quoted rate. (c) The contractor shall upload MOU letter with any one of manufacturer and also with their authorised applicator mentioned in the tender alongwith their bid in cover-I failing which his bid will be rejected. Authorised applicator shall have valid authorisation letter from the manufacturer (Minimum regional HQs) and shall have been issued not less than 30 days from the date of commencement of the work. The authorisation letter needs to be valid for the complete period of execution of the painting work. (d) After preparation of the surface, Engr-in-Charge shall approve the same before applying primer and finishing coats. (e) Building wise stage passing register shall be maintained and shall be signed by Engr-in-Charge and contractor. (f) The equipments to be used in the work shall be certified by the manufacturer with whom the MOU been entered into. (g) Contractor shall submit approved company generated 05 years warranty card at the time of submission of RAR & Final Bill.
Material and labour for preparation of old treated surface of ceiling and applying one coat of white wash complete all as specified and directed.
Material and labour for preparation of old treated steel surfaces of any description not otherwise described over 10cm width or girth and applying one coat of synthetic enamel paint (spray painting) over roof sheet of bldg of height 6 to 9 mtr complete all as specified and directed.
Material and labour for preparation of new or previously untreated steel surface of any description not otherwise described over 10cm width or girth and applying two coats of synthetic enamel paint (spray painting) over roof sheet of bldg of height 6 to 9 mtr complete all as specified and directed.
Material and labour for preparation of old wooden surfaces of any description, width or girth including cleaning and preparing the surfaces and applying two coats of french polish over and including one or more coats of wood filler complete all as specified and directed.
Material and labour for preparation of old painted surfaces of concrete and applying two coats of synthetic enamel paint complete all as specified and directed.
Material and labour for preparation of old treated wood or wood based surfaces of any description not otherwise described over 10cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed.
Material and labour for obliterating old writing of any description, not exceeding 0.1 sqm with paint to match existing works complete all as specified and directed.
Material and labour for writing letters or figures (block Roman, Italian or Indian) not exceeding 30 cm height including stops, comma, arrows, brackets, dashes etc on existing sign board (Black or yellow base) including two coats of synthetic enamel paint over a coat white base synthetic enamel paint complete all as specified and directed.
Supply and fixing sheet glass, 3mm thickness, ordinary quality and glazing with oil putty in square n exc 0.5 sq. m in each pane, including hacking out old broken glass (any thickness, size, quality or description) from wooden frames or stone, concrete or brick surrounds, glazed with putty or fixed with beads complete all as specified and directed.
Supply and fixing Figured glass, pin head type, 3mm thickness and glazing with oil putty in square n exc 0.5 sq. m in each pane, including hacking out old broken glass (any thickness, size, quality or description) from wooden frames or stone, concrete or brick surrounds, glazed with putty or fixed with beads complete all as specified and directed.
Material and labour forCleaning top surfaces of AC / CGI Sheets / RCC slab including chajjas, parapets walls and removing grass / algae etc and removing rubbish away from site complete all as specified and directed.
Grubbing up tree trunk including cutting of trunk portion protruding over ground, Girth of tree n.exc. 30 cm taken at 1 m above ground level. digging out roots upto 60 cm below ground level or 15 cm below formation level whichever is lower, filling holes and leveling off ground, including cutting of trunk portion protruding over walls, digging out roots upto the required thikness of walls, stacking of serviceable material and removing of unserviceable material to a distance n exc. 50 m and clearing site complete all as specified and directed.
M/S Surendra Prasad and Associates
M/S UTTAM SAHA
M/s Sohini Construction
M/S P&R CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .