Tender Value
₹27.3 L
EMD Value
₹82,035
Closing Date
15 Oct 2026, 3:00 pm
CE
Ghaziabad Nagar Nigam
Road improvement work by drain and CC from the former toilet to Soren Public School via Anil Bhadana house in Ward 26, Sandarpuri/Madhopura.
2026_DOLBU_1190484_108
132/Nirman/2026-27 Date 18.09.2026 (S.No. 201 to 400)
Open Tender
Civil Works
Percentage
CE
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,416
₹82,035
30 Sept 2026
30 Sept 2026
15 Oct 2026
30 Sept 2026
15 Oct 2026
30 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing Reinforced cement concrete or reinforced brick work including stacking of materials as per directed by the of Engineer - in -charge. | 8.06 | Cum | 1,340 | ₹10,800.4 |
| 2 | Dismantling sundries brick work including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60 metre (200 feet) SOR 2022 S.I N0 692 | 14.82 | Cum | 600 | ₹8,892 |
| 3 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge | 186.78 | Cum | 110 | ₹20,545.8 |
| 4 | Disposal of earth up to 8.00 Km from site including etc. all complete work. S.I N0-231(A) SOR-2022 | 40 | Cum | 195.1 | ₹7,804 |
| 5 | Cement Concrete with 4 cm guge approved brick ballast, Fine sand & cement in the proportion of 12:6:1 including supply of all matrials, labour, tools and plants etc. required for proper completion of the work. | 23.21 | Cum | 4,000 | ₹92,840 |
| 6 | RCC work with cement, approved coarse sand and 2 cm gauge stone grit in proportions of 1:1.5:3 in slab wall etc excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWG G.I.binding wire and including necessary centering and shuttering etc and supply of all materials, labour and tool & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. | 88.36 | Cum | 8,640 | ₹7,63,430.4 |
| 7 | Steel reinforcement for R.C.C work including straightening,cutting,bending,placing in position and binding all complete upto plinth level Mild steel and Medium Tensile steel Bars. | 48.55 | Qtl | 8,166 | ₹3,96,459.3 |
| 8 | P.c.c in 1:2:4 with 2 cm gauge stone grit of instead of 4 cm gauge stone ballast etc all complete.S.I No 279 (a)SOR 2022 | 1.03 | Cum | 7,050 | ₹7,261.5 |
| 9 | S/L of 22.4 to 53 mm gauge stone ballast with stacking for measurement etc all complete as per direction of engineer in charge | 76 | Cum | 2,151.2 | ₹1,63,491.2 |
| 10 | Consolidation stone aggregates of 45-63mm/22.4-53mm size to water bound macadam,specification including spreading in uniform thickness hand packing rolling with three wheel 80-100 KN static roller in stages to proper grade and camber applying and brooming crushable screening to fill-up the interstices of coarse aggregate,watering and compacting to the required density Grading 2/3 as per Technical Specification Clause 405. | 76 | Cum | 690 | ₹52,440 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 20.10 MB
BOQ_2245245.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .