| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC | ₹9.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹9.7 L+₹6,407 (0.66%)Rejected-AOC | ₹9.7 L+₹6,407 (0.66%) | L2 | Rejected-AOC L2 |
| 3 | L3₹9.8 L+₹12,519 (1.30%)Rejected-AOC 0 INDRAPUR BARGAON GONDA GONDA UTTAR PRADESH 271002 | GONDA | UTTAR PRADESH | 271002 | ₹9.8 L+₹12,519 (1.30%) | L3 | Rejected-AOC L3 |
Tender Value
₹9.9 L
EMD Value
₹98,580
Closing Date
28 May 2026, 3:00 pmClosed
chief Engineer nagar nigam saharanpur
chief Engineer nagar nigam saharanpur
Construction of open jym gazibo, wall painting Line no.01 park no.01 for south city delhi raod at ward no. 16
2026_NNSAH_1150327_1
6203 B
Open Tender
Civil Works
Percentage
30 days
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹826
₹98,580
16 Jul 2026
20 May 2026
29 May 2026
20 May 2026
28 May 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismenteling of existing plaster labour T&P etc all complete | 194.4 | sqm | 30 | ₹5,832 |
| 2 | Concrete with 4 cm gauge brick ballast fine sand and cement in proportion are 1:6:12 in foundation and under floors, including supply of all materials, labour. T&P etc. required for proper completion the work | 9 | cum | 2,985 | ₹26,865 |
| 3 | M-150 Brick work in 1:4 one cement and four course sand, mortar in foundation in plinth including supply of all material labour, T &P etc. required for proper completion of the work. | 5.15 | cum | 4,520 | ₹23,278 |
| 4 | 12 mm thick plaster with cement and approved c sand mortar in 1:4 over brick work minium thickness not to be less than 1 Cm including supply of all material labour Tool & Plants etc. required for proper completion of the work. | 237.93 | sqm | 160 | ₹38,068.8 |
| 5 | Cemant concrete with 4cm Gauge stone Ballast Fine sand of 1.25 FM and cemant in Proportion of 4:2:1 in Founfation including supply of all matrial labour and tools and plant for proper complition of work (S.I.No. 279) | 9 | m3 | 5,750 | ₹51,750 |
| 6 | Cheuered precast cement concrete tiles 22mm thick in footpath & courtyrd, jointed in all complete work | 120 | sqm | 806.83 | ₹96,819.6 |
| 7 | Supply of 80mm thick C.C. Interloking Rubber MouledeTiles ISI marked shaped as per PWD Schedule Chapter-20 of 01-07-2016 page 43 S.I. No 20.36 New item 12 page no 43 including laying of Tiles cushan with local sand in all complete (as page 43 new item 16 | 150 | sqm | 820 | ₹1,23,000 |
| 8 | M.S iron work as per reinforcement in all complete work | 2.23 | qtl | 6,150 | ₹13,689.9 |
| 9 | Painting or varnishing work in small area or new with Two coat of approved suprior quality | 79.5 | sqm | 89 | ₹7,075.5 |
| 10 | Providing of wall putty with all material labour T&P etc all complete | 237.93 | sqm | 67 | ₹15,941.31 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.73 MB
BOQ_2153759.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .