| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.3 LAccepted-AOC GOUTAM NAGAR 2ND LANE WARD NO 09 BLOCK RAYAGADA MPLT PS DIST RAYAGADA ODISHA PIN 765001 | RAYAGADA | RAYAGADA | ODISHA | 765001 | ₹25.3 L | L1 | Accepted-AOC Successful bidder in the Transparent Lottery |
| 2 | L1₹25.3 LRejected-AOC S O MENEJAR NAYAK BRAHMIN STREET GP PO BISSAMCUTTACK BLOCK PS BISSAMCUTTACK DIST RAYAGADA ODISHA PIN 765019 | RAYAGADA | ODISHA | 765019 | ₹25.3 L | L1 | Rejected-AOC Unsuccessful bidder in the Transparent Lottery |
| 3 | L1₹25.3 LRejected-AOC AT BRAHMIN SAHI GUDARI PSGUDARI | ₹25.3 L | L1 | Rejected-AOC Unsuccessful bidder in the Transparent Lottery |
| 4 | L1₹25.3 LRejected-AOC | ₹25.3 L | L1 | Rejected-AOC Unsuccessful bidder in the Transparent Lottery |
| 5 | L1₹25.3 LRejected-AOC AT DUNDULI PO JKPUR DIST RAYAGADA | RAYAGADA | ODISHA | ₹25.3 L | L1 | Rejected-AOC Unsuccessful bidder in the Transparent Lottery |
Tender Value
₹25.3 L
EMD Value
₹25,400
Closing Date
19 Feb 2026, 5:00 pmClosed
S.E, M.I Division, Rayagada
O/o S.E, M.I Division, Rayagada
Improvement to Surplus Escape of Kankubadi MIP (Res.) in Bissamcuttack Block of Rayagada District under DPIW 2025-26
2026_CEMIB_125740_15
SEMIDRGD-06/2025-26
National Competitive Bid
Civil Works - Others
90 days
Rayagada
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,000
₹25,400
Yes
13 May 2026
10 Feb 2026
20 Feb 2026
10 Feb 2026
19 Feb 2026
10 Feb 2026
10 Feb 2026 - 19 Feb 2026
Clearing shrub jungle and uprooting stumps and small bushes and trees of below 1 M girth on pre-measurement and depositing the debrises clear of worksite with all lead and lift complete in all respect as directed by the Engineer-in-charge.
Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50m lead with all labour, T&P complete in all respect as directed by EIC.
Excavation in approved type of soil free from all roots waste materials kankars in approved borrow area by manual labour or by mechanical means or by both loading in to and transportation by mechanical means and unloading the earth with all leads and lifts on properly prepared and scientifically approved surface including spreading and removing un-desirable materials and leveling the earth in 22.5 cm. layers to make ready for watering and compaction with sheep foot rollers and dozers but excluding cost of watering and compaction in dam and dyke for all height measured above the un-stripped average ground level including construction and maintenance of coffer dam as and where required and construction maintenance, watering and lighting of haul road and borrow area including jungle clearance and stripping of borrow area including trimming the extra partially compacted earth beyond the design section etc. complete as per the direction of the Engineer in charge. (Measurement will be taken on finished Level Section)
Ramming or rolling eathwork with light H.R.R. in embankment in layers not exceeding 0.3m etc. complete in all respect as directed by the Engineer in charge.
Excavation of foundation in hard or all kind soil with initial lead and lift including rough dressing and leveling the bed and fit for laying concrete and depositing the excavated materials clear of work site as & where directed with all leads & lifts including showing shuttering propping bulla & dewatering from foundation if necessary etc. complete in all respect by the Engineer in charge.
Providing formwork for concrete with F1 finish for upstream fafces of dam, spillway, glacis of barrages, unexposed surfaces of foundation, block joints etc. with steel shutters rigidly fixed and removal of forms and making good to the surfaces where necessary complete with all labour, materials and T&P complete as directed by the Engineer-in-charge.
Supplying, straightening, cutting, bending, binding and tying the HYSD bars and placing in position as reinforcement and anchoring including lapping where necessary including cost of HYSD bars & binding wire with all leads, lifts from bending yard to placement point including cost, conveyance, labour, T&P & all taxes required for this item etc. complete in all respect as directed by the Engineer-in-charge.
Reinforcement Cement concrete in (M 20) with 20 mm down grade crusher broken hard granite chips quarried & free from weathered skin of approved quality mixing by concrete mixer including hoisting, lowering and laying concrete in position to proper slope and level and compacting by Vibrator in layers not exceeding 0.15m in depth finishing the exposed surface smooth including watering, curing for required period including cost, conveyance, royalty,EMF, DMF, additional charge and other taxes of all materials supplying all labour and T&P required for the work etc. complete in all respect as directed by Engineer-in-charge.
Rough stone dry packing in aprons and revetments to all heights & slope with hard stones other than granite of 15cm to 30cm size in all direction (weighing 140 lbs / cft. & above) of approved quality and free from weathered skin including filling the interstices with small stones with cost, conveyance, royalty, EMF, DMF & additional Charges and other taxes of all materials etc. complete in all respect as directed by the Engineer in charge. (1/6th. volume will be deducted towards voids).
Please Enable Macros to View BoQ information
stage.html
html • 0.10 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
finance_580306.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.61 MB
dtcn6.pdf
Tender Documents • 3.83 MB
BOQ_580306.xls
BOQ • 0.26 MB
tcn6.pdf
Additional Documents • 2.59 MB
Download all tender documents and submit your bid