Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.9 LAccepted-AOC NO 577 5TH MAIN D GROUP LAYOUT 60 FEET ROAD SRI GANDHAKAVAL BANGALORE 560 091 | BANGALORE | BANGALORE | KARNATAKA | 560091 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹44.4 L+₹2.4 L (5.78%)Rejected-Finance | L2 | Rejected-Finance Not being L1 | |
| 3 | L3₹44.8 L+₹2.9 L (6.86%)Rejected-Finance 15 5 1ST MAIN 2ND CROSS K S TOWN BANGALORE BANGALORE RURAL KARNATAKA 560060 | BENGALURU URBAN | KARNATAKA | 560060 | L3 | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | SREE VINAYAKA ENTERPRISES L3 | PATEL CONSTRUCTION L1 | VEERESH CONSTRUCTION/DEVENDRA L2 |
|---|---|---|---|---|---|---|
| 1.00 | Surface excavation not exceeding 30 cm deep and averaging 15 cm deep and getting hard/dense soil complete all as specified and directed. | 715 | SQM | 185 ₹1,32,275 | 250 ₹1,78,750 | 95 ₹67,925 Lowest |
| 2.00 | Excavation in trenches in exceeding 1.5 m wide and not exceeding 1.5 M depth for getting out in hard and dense soil complete all as specified and directed. | 251.2 | CUM | 4,560 ₹11,45,472 | 300 ₹75,360 Lowest | 450 ₹1,13,040 |
| 3.00 | Excavation over areas not exceeding 1.5m in depth , getting out in hard / dense soil, complete all as specified and directed. | 184 | CUM | 480 ₹88,320 | 50 ₹9,200 Lowest | 550 ₹1,01,200 |
| 4.00 | Excavation over areas exceeding 1.5m & not exceeding 3.00 depth , getting out in hard / dense soil, complete all as specified and as directed | 48 | CUM | 480 ₹23,040 Lowest | 500 ₹24,000 | 650 ₹31,200 |
| 5.00 | Returning, filling, including spreading, levelling, watering and well ramming in layers not exc 25cm thick in any type of exacavated soil all as specified and directed. | 152 | CUM | 150 ₹22,800 | 120 ₹18,240 Lowest | 350 ₹53,200 |
| 6.00 | Material and labour for Spreading ribbed soil in trenches as in cable cushioning all as per IS 1255-1983, complete all as specified and directed.
Note :-
(i) Excavated approved soil shall be ribbed by using sieve to separate composite particles etc. as per IS and refilling in trenches before laying of cable 8cm and 15cm after laying of cable. This is then gently punned down to a depth of 10 cm above the top of upper most cable
(ii) For the purpose of measurement only punned thickness shall be considered for payment. | 89.21 | CUM | 230 ₹20,518.3 Lowest | 1,000 ₹89,210 | 650 ₹57,986.5 |
| 7.00 | Removing excavation materials not exceeding 50 Mtr and deposition where directed at a level not exceeding 1.5 Mtr above the starting point (soil) complete all as specified and directed. | 301.82 | CUM | 130 ₹39,236.6 Lowest | 250 ₹75,455 | 350 ₹1,05,637 |
| 8.00 | Material & Labour for Sand as sand cushioning for laying interlocking tiles complete all as specified and directed. | 32.85 | CUM | 850 ₹27,922.5 Lowest | 1,500 ₹49,275 | 1,650 ₹54,202.5 |
| 9.00 | Material & Labour hard core of broken bricks gauge not exceeding 63 mm, deposited spreaded and leveled in layer not exceeding 15 cm thick, watered and rammed to a true surface, broken stone or boulder complete all as specified and directed. | 107.25 | CUM | 880 ₹94,380 Lowest | 1,800 ₹1,93,050 | 1,450 ₹1,55,512.5 |
| 10.00 | Material & Labour Cement concrete 1:4:8 type D2 using (40 mm graded aggregate) as in filling, fdn, mass concrete and sub base of floors etc complete all as specified and directed. | 10 | CUM | 4,800 ₹48,000 Lowest | 5,500 ₹55,000 | 5,200 ₹52,000 |
Tender Value
₹44.1 L
EMD Value
₹88,200
Closing Date
17 Oct 2025, 6:00 pmClosed
Ranjeet Kumar, IDSE, CWE
Commander Works Engineers AF South Gangamma Circle Opp Guard Room 410 AFS Jalahalli Bangalore 560013
PROVN OF AREA DRAINAGE INCLUDING RAIN WATER HARVESTING IN THE AVAILABLE STORAGE TANKS AT TPS AT AF STN CHIMNEY HILLS
2025_MES_731642_1
82193/E8
Open Tender
Civil Works
Item Rate
180 days
AGE (I) (AF) Chimney Hills
As per Tender Document
8 documents required · 8 mandatory
₹500
AGE (I) AF Chimney Hills
₹88,200
Yes
15 Nov 2025
19 Sept 2025
24 Oct 2025
19 Sept 2025
17 Oct 2025
3 Oct 2025
19 Sept 2025 - 25 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.37 MB
BOQ
BOQ • 0.32 MB
Tender Documents
Tender Documents • 2.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .