| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC D NO 17 143 APOLLO GARDEN MADANADAR KUDIERUPPU NEAR KUMARAPURAM JN TIRUNELVELI 627 133 | TIRUNELVELI | TAMIL NADU | 627133 | ₹3.7 L Quoted ₹3.1 L | L1 | Accepted-AOC Tender Accepted |
| 2 | L2₹3.3 LRejected-AOC 30 OPP ALOK PRESS GHATI BADBHUNJA CHAMELI ROAD BHOPAL BHOPAL MADHYA PRADESH 462001 UDYAM MP 10 0044621 | BHOPAL | MADHYA PRADESH | 462001 | ₹3.3 L | L2 | Rejected-AOC Tender Not Accepted |
| Sl No | Description | Qty | Unit | APOLLO TRANSFORMERS AND FILTERS L2 | R K ELECTRICALS L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling of conservator tank. | 1 | No | 5,650 ₹6,667 | 5,700 ₹6,726 |
| 2.00 | Dismantling of HV,LV and Neutral bushings and top cover at firm site. | 1 | No | 5,700 ₹6,726 | 5,800 ₹6,844 |
| 3.00 | Flushing the core with new oil and removal of sludges in the transformer tank bottom and windings. | 1 | No | 5,700 ₹6,726 | 5,800 ₹6,844 |
| 4.00 | Removing of old gaskets in all joints of Transformer and cleaning the surface and innerside of main tank. | 1 | No | 7,500 ₹8,850 | 7,600 ₹8,968 |
| 5.00 | Providing new gaskets in all joints of Transformers. | 1 | No | 7,500 ₹8,850 | 7,600 ₹8,968 |
| 6.00 | Improving of IR value. | 1 | No | 2,600 ₹3,068 | 2,700 ₹3,186 |
| 7.00 | IR Value improved core and winding rehousing to main tank. | 1 | No | 5,700 ₹6,726 | 5,800 ₹6,844 |
| 8.00 | After transporting of Transformer from firm to TTPS and placing its position and re-erection,the total oil to be circulated at TTPS site. | 1 | No | 6,000 ₹7,080 | 6,100 ₹7,198 |
| 9.00 | Rewinding charges for HV Side of the Transformer. | 1 | No | 68,000 ₹80,240 | 69,000 ₹81,420 |
| 10.00 | Re-insulation charges for LV side of the transformer. | 1 | No | 52,800 ₹62,304 | 53,000 ₹62,540 |
Tender Value
Refer Docs
EMD Value
₹4,200
Closing Date
7 Mar 2026, 2:00 pmClosed
CE/TTPS
Chief Engineer Tuticorin Thermal Power Station-Tuticorin
TTPS ES Circle EM II Charges for Rewinding of HV LV Coil and complete re insulation of HV LV coil for 1 No 500KVA 22KV 433V Distribution Transformer Make Indo Tech Electric company Sl No IT 3124 in Camp II quarters area
2026_EB_669316_1
CE/SE/ES/TTPS/No.248/2025-26
Open Tender
Electrical and Maintenance Works
90 days
TTPS
As per BQR conditions in NIT
7 documents required · 7 mandatory
₹0
₹4,200
Yes
24 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
7 Mar 2026
2 Mar 2026
Dismantling of conservator tank.
Dismantling of HV,LV and Neutral bushings and top cover at firm site.
Flushing the core with new oil and removal of sludges in the transformer tank bottom and windings.
Removing of old gaskets in all joints of Transformer and cleaning the surface and innerside of main tank.
Providing new gaskets in all joints of Transformers.
Improving of IR value.
IR Value improved core and winding rehousing to main tank.
After transporting of Transformer from firm to TTPS and placing its position and re-erection,the total oil to be circulated at TTPS site.
Rewinding charges for HV Side of the Transformer.
Re-insulation charges for LV side of the transformer.
Cost of Neoprene Rubber Cork sheet Size:900 x 900 x 8mm
Cost of Neoprene Rubber Cork sheet Size:900 x 900 x 6mm
Material charges for rewinding reinsulation of 500 KVA Transformer HV & LV side
Charges for cleaning and painting the entire 22 KV/433V Distirbution transformer with enamel grey paint. Including cost of paint.
Less the cost of retrieved copper (this copper scraped to be retained by the contractor)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_804230.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid