Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.5 LAccepted-AOC 0 JANKI NAGAR NEAR SURAJ HOTEL GONDA UTTAR PRADESH 271001 | GONDA | UTTAR PRADESH | 271001 | ₹27.5 L | L1 | Accepted-AOC work is completed |
| 2 | L2₹27.6 LRejected-Finance | ₹27.6 L | L2 | Rejected-Finance Higher rate |
| 3 | L3₹27.6 LRejected-Finance | ₹27.6 L | L3 | Rejected-Finance Higher rate |
| 4 | Rejected-Technical ETAWAH | MAU | UTTAR PRADESH | 221601 | - | - | Rejected-Technical Non Responsive |
| 5 | Rejected-Technical JAWAHAR ROAD BHARTHANA DISTRICT ETAWAH UTTAR PRADESH | BHARTHANA | ETAWAH | UTTAR PRADESH | 206242 | - | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | M/S ARVIND KUMAR DUBEY L3 | ASHOK KUMAR THEKEDAR L2 | M/s PARI ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work for diversion cuting/ filling or in embankment in ordinary soil, excavation to be in the for of irregular pits and earth work in embankment to be in 20 cm layers, including remming and dressing the surface to the require level and slop and also including lift 1.50m and lead 0.30m the earth form cutting to be used in making embankment for to be disposal as spoil bank as directed by the engineer-in - charge. | 430.5 | Cum | 98 ₹42,189 | 110 ₹47,355 | 100 ₹43,050 |
| 2.00 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60M as per direction of Engineer-in-charge . | 31.73 | Cum | 520 ₹16,499.60 | 502 ₹15,928.46 | 500 ₹15,865 |
| 3.00 | Earth work in foundation in dry ordinary soil (Loam , clay or sand) including all lift and lead and including filling , watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the engineer-in - charge. | 227.68 | Cum | 151 ₹34,379.68 | 150.2 ₹34,197.54 | 150 ₹34,152 |
| 4.00 | Centering and shuttering for RCC/RB work including cost of cost of centering and shuttering up to 3.00m height | 390.95 | Sqm | 510 ₹2.0 L | 500.8 ₹2.0 L | 500 ₹2.0 L |
| 5.00 | Laying Plain Cement Concrete M -15 (1:2:4) with cement (OPC-43), coarse sand and 10-20mm gauge stone grit including supply of all required materials labour and T&P etc. for proper completion of work as per IS - 456:2000 excluding cost of Reinforcement and including cost of material, labour, T&p etc, complete. | 43.69 | Cum | 8,522 ₹3.7 L | 8,512.6 ₹3.7 L | 8,500 ₹3.7 L |
| 6.00 | Providing and laying Reinforced cement concrete in M-25 (1:1:2) design mix with OPC-43 grade cement,Coarse sand FM>2.25, coarse aggregate of Kabrai grit (size- 10 to 20 mm) including cost of all material, labour, T&P, lead & lift, mixing & placing with batching plant , Roylity and all taxes etc. but excluding cost of steel reinforcement for proper completion of work. | 126.15 | Cum | 9,524 ₹12.0 L | 9,515 ₹12.0 L | 9,500 ₹12.0 L |
| 7.00 | Supplying & laying 150 m m thick stone ballaste 20 -40 mm size i/c all cos tof labour matarial etc | 3.38 | Cum | 1,495 ₹5,053.10 | 1,502 ₹5,076.76 | 1,500 ₹5,070 |
| 8.00 | Supplying & laying 150 m m thick Graded stone grit 6.7 -10 mm size i/c all cost labour matarial etc | 3.38 | Cum | 1,495 ₹5,053.10 | 1,502 ₹5,076.76 | 1,500 ₹5,070 |
| 9.00 | Supplying & Laying 300 m m thick stone Ballast pitching 45-90 mm size i/c all cost labour matarial etc | 13.97 | Cum | 2,000 ₹27,940 | 2,003 ₹27,981.91 | 2,000 ₹27,940 |
| 10.00 | Dewatering of Foundation hiring diesel pump 5 HP including operator cost, cost of dewatering equipment and its accessories, labour etc. | 40 | Per Hour | 140 ₹5,600 | 140 ₹5,600 | 140 ₹5,600 |
Tender Value
₹27.6 L
EMD Value
₹2.8 L
Closing Date
19 Feb 2026, 10:00 amClosed
Executive Engineer
I. D. Auraiya, Dibiyapur
Repair and Reconstruction of old and Damaged Culvert on Vaghaipur Drain at km. 2.800 (RCC Box Culvert)
2026_UPIDC_1115601_1
02/EE/2025-26
Open Tender
Civil Works
Dibiyapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹2.8 L
Yes
25 Apr 2026
13 Feb 2026
19 Feb 2026
13 Feb 2026
19 Feb 2026
13 Feb 2026
Earth work for diversion cuting/ filling or in embankment in ordinary soil, excavation to be in the for of irregular pits and earth work in embankment to be in 20 cm layers, including remming and dressing the surface to the require level and slop and also including lift 1.50m and lead 0.30m the earth form cutting to be used in making embankment for to be disposal as spoil bank as directed by the engineer-in - charge.
Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60M as per direction of Engineer-in-charge .
Earth work in foundation in dry ordinary soil (Loam , clay or sand) including all lift and lead and including filling , watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the engineer-in - charge.
Centering and shuttering for RCC/RB work including cost of cost of centering and shuttering up to 3.00m height
Laying Plain Cement Concrete M -15 (1:2:4) with cement (OPC-43), coarse sand and 10-20mm gauge stone grit including supply of all required materials labour and T&P etc. for proper completion of work as per IS - 456:2000 excluding cost of Reinforcement and including cost of material, labour, T&p etc, complete.
Providing and laying Reinforced cement concrete in M-25 (1:1:2) design mix with OPC-43 grade cement,Coarse sand FM>2.25, coarse aggregate of Kabrai grit (size- 10 to 20 mm) including cost of all material, labour, T&P, lead & lift, mixing & placing with batching plant , Roylity and all taxes etc. but excluding cost of steel reinforcement for proper completion of work.
Supplying & laying 150 m m thick stone ballaste 20 -40 mm size i/c all cos tof labour matarial etc
Supplying & laying 150 m m thick Graded stone grit 6.7 -10 mm size i/c all cost labour matarial etc
Supplying & Laying 300 m m thick stone Ballast pitching 45-90 mm size i/c all cost labour matarial etc
Dewatering of Foundation hiring diesel pump 5 HP including operator cost, cost of dewatering equipment and its accessories, labour etc.
Cutting bending binding and placing steel rainforcement including all cost of labour material T&P etc.
Supplying & laying local sand layer blow CC lining I/C cost of all material labour T&P ,manual compaction etc.
Supply of RCC humepipe NP-3 (SPIGOT) 1200 mm dia for making diversion with laying and fixing in possiton and after work removing including exavation back filling including cost of material.
Finishing walls with water proofing cement paint of approved manufacturers such as Super Snowcem, Durrocem, Robiacem, Guttucem, supermen quality of required shade on uncoated wall surface (one coat) over one coat white cement primer to give even shades after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including curing and cost
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.32 MB
BOQ_2070284.xls
BOQ • 0.32 MB
tenderdocument_merged.pdf
Tender Documents • 10.30 MB
Download all tender documents and submit your bid