SE ETC Shahjahanpur
Electy. Trans. Circle Shahjahanpur
RLA Testing of Transformers
2025_UPTCL_1078436_1
Short Term E. Tender no. 47ETC(S)/2025-26
Open Tender
Electrical Works
Fixed-rate
45 days
Sitapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
A/c No. 0423002100107147 IFSC Code No. PUNB0042300
₹5,000
23 May 2026
29 Sept 2025
25 Oct 2025
29 Sept 2025
24 Oct 2025
29 Sept 2025
29 Sept 2025 - 7 Oct 2025
1- Online Testing to be conducted on Transformer :- (A) 1- On line Partial Discharge Measurement. 2- Thermographic Measurement. 3- Noise Level Measurement. 4- Vobration Level Measurement. 5- Oil Test (NABL Approved Lab): (i)- General oil test as per IS 1866:2000 (Resistivity, Tan delta, BDV. Water PPM. IFT. Acidity, Flash point & Sludge content) (ii)- DGA as per relevant IEC (iii)- Furan analysis
2- Online Testing to be conducted on Transformer:- (1)- Capacitance & ten Delta of Bushing & Windings. (ii)- Turn Ratio at each taps. (iii)- Vector Group test. (iv)- Short Circuit Impedance test. (v)- Megnetizing current on each tap. (vi)- Magnetic balance test. (vii)- Winding resistance at all taps. (viii)- IR & PI Test. (ix)- Sweep frequency response analysis test & Mechanical assessment. (x)- Frequency response on stray loss test (FRSL) (xi)- Leakage Reactance & Impendance measurement. (xii)- Dynamic Contact resistance test for OLTC performance check. (xiii)- Moisture assessment & Dielectric analysis of winding insulation (FDS measurement).
NOTE- 1. All testing equipment (with latest calibration from NABL lab) will be provided by the contractor. 2. Cost of transportation for Oil samples & shifting of all testing equipment will be in the scope of the contractor. No extra payment will be done. 3. Petty or sub-contracting will not be allowed. 4. Contractor should have their own NABL Approved lab. 5. Recommendation to be given by firm as per test results..
100 MVA Transformer at 220KV S/S Nighasan (BHEL make Mfg- Year- 1985)
100 MVA Transformer at 220KV S/S Sitapur (Alstom make Mfg- Year- 2000)
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.18 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_1971649.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .