| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.9 LAccepted-AOC FLAT NO 403 TOWER 7 PANCHSHEEL PRIMROSE HAPUR ROAD GHAZIABAD | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | ₹19.9 L | L1 | Accepted-AOC First Lowest |
| 2 | L2₹20.0 LRejected-AOC VILLAGE NUSRATABAD KHARKHADI POST LONI DISTRICT GHAZIABAD | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | ₹20.0 L | L2 | Rejected-AOC Second Lowest |
| 3 | L3₹20.0 LRejected-AOC | ₹20.0 L | L3 | Rejected-AOC Third Lowest |
Tender Value
₹23.9 L
EMD Value
₹48,000
Closing Date
25 Feb 2026, 2:00 pmClosed
Project Manager, UP Projects Corporation Ltd
K-2, Sector-116, Noida Gautambudha Nagar
Construction work of Toilet Block and Drinking Water Facility at Govt. High School Mataur District Ghaziabad
2026_UPPRC_1115502_1
20/PCL/PM/Unit-36/Noida/25-26 Dt 11.02.26
Open Tender
Civil Works
Percentage
180 days
Govt. High School Mataur District Ghaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹48,000
24 Mar 2026
12 Feb 2026
25 Feb 2026
12 Feb 2026
25 Feb 2026
12 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Toilet Block Civil Work
Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-Incharges upto a distance of 30mt. (100 fts) from the foundation trenches. | 45.76 | CUM | 104.5 | ₹4,781.92 |
| 2 | Filling of carted earth lead upto 8 km distance | 76.36 | CUM | 292.6 | ₹22,342.94 |
| 3 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 kms. from the site of work and including watering, dressing etc rate to include cost of all materials labour T & P etc required for proper completion of work. | 5.99 | CUM | 494.95 | ₹2,964.75 |
| 4 | Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. | 14.16 | CUM | 5,795 | ₹82,057.2 |
| 5 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and around the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete (plinth area of the building at ground. floor only shall be measured as per I.S.6313(PartII 1981)Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (1)Treatment for masonary & foundation 5 liters per sqm. (2) Back fill in immediate contact with foundation 7.5 liters/sqm (3) Treatment of top surface of plinth filling 5 liters/sqm (4) Treatment of soil along external perimeter of building 7.5 liters/sqm. (5) Treatment of soil under apron along external perimter 5 liters/sqm. | 59.2 | SQM | 256.5 | ₹15,184.8 |
| 6 | R.C.C. work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:1.5:3 (M-20) in lintels of doors and windows excluding supply of reinforcement and its binding but B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T & P etc.required for proper completion of the work. Binding wire cost being included in the item | 4.07 | CUM | 8,208 | ₹33,406.56 |
| 7 | R.C.C. work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:1.5:3 (M-20) in slab excluding supply of reinforcement and its binding but B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T & P etc.required for proper completion of the work. Binding wire cost being included in the item | 9.84 | CUM | 8,578.5 | ₹84,412.44 |
| 8 | R.C.C. work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:1.5:3 (M-20) in beams excluding supply of reinforcement and its binding but B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T & P etc.required for proper completion of the work. Binding wire cost being included in the item | 0.14 | CUM | 8,730.5 | ₹1,222.27 |
| 9 | M-150 brick work in 1:6 (one cement and six coarse sand sand of 2.25 fineness modulus) mortar in foundation & plinth including supply of all materials, labour and T & P etc required for proper completion of the work. | 27.57 | CUM | 4,759.5 | ₹1,31,219.42 |
| 10 | Providing and laying damp-proof course 25 mm thick with cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 12.5mm nominal size) | 9.7 | SQM | 370.5 | ₹3,593.85 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_2069795.xls
BOQ • 0.75 MB
Tender20.pdf
Tender Documents • 3.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].