| 1 | L1₹4.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.7 L+₹306.39 (0.07%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹4,850
Closing Date
8 Mar 2024, 3:00 pmClosed
BDO VP Ayothiyapattnam
BDO VP Ayothiyapattnam
Salem District - Ayothiyapattnam Block - Construction of Waiting Shed With Water Supply Arrangement at Sukkampatti H/O Sukkampatti in AGAMT-II Work No. 25.
2024_RDTN_435356_25
3123/2023/T5
Open Tender
Civil Works
Item Rate
180 days
BDO VP Ayothiyapattnam
as on below
3 documents required · 3 mandatory
₹0
₹4,850
BDO VP Ayothiyapattnam
30 Apr 2024
2 Mar 2024
8 Mar 2024
2 Mar 2024
8 Mar 2024
2 Mar 2024
2 Mar 2024
Amount
Construction of Waiting Shed With Water Supply Arrangement at Sukkampatti H/O Sukkampatti
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B.
Plain Cement concrete 1 : 4 : 8 mix using 40mm ISS metal including all cost and conveyance of all materials to site and all labour charges etc complete.
Re-filling the excavation earth filing including cost and conveyance and all labour charges etc complete as per standard specification.
Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting upto 3.00 in height including cost and conveyance of all materials to site and all labour charges etc complete.
Supply and fabrication of steel for R.C.C work using R.T.S & M.S rod including cost and conveyance of all materials to site all labour charges etc complete.
Reinforced cement concrete 1 : 1 1/2:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete.
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum
Plastering with cement 1:4 mix, to 20mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
Plastering with cement 1:5-12mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Supply and delivery of 1000Liter HDPE Tank Incld all Cost.,
Construction of HDPE Tank Pedestal Incld all Cost.,
Supply and delivery of 50mm Gi Pipe
Laying and delivery of 50mm Gi Pipe
supply and Delivery of 50mm GI Coupling
Provision for non retun value
Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water
supply and delivery of the following materials with standard specification as per ISI marking
Lowering PVC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste.
Refilling the excavated earth as per the standard specifications
Brass Tap as per IS 319 grade of sizes 15mm, 20mm and 25mm size and threaded as per IS:1554 BSPT, ISO:7-1 to suit the corresponding bore sizes of 15mm, 20mm and
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SS Constructions
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .