Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance | -41.00% | ₹1.8 L | L1 | Admitted-Finance |
| 2 | L2₹1.9 LAdmitted-Finance | -36.99% | ₹1.9 L | L2 | Admitted-Finance |
| 3 | L3₹1.9 LAdmitted-Finance | -36.35% | ₹1.9 L | L3 | Admitted-Finance |
| 4 | L4₹2.0 LAdmitted-Finance | -32.00% | ₹2.0 L | L4 | Admitted-Finance |
| 5 | L5₹2.1 LAdmitted-Finance | -31.56% | ₹2.1 L | L5 | Admitted-Finance |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
7 May 2026, 6:00 pmClosed
Er. Fayaz Ahmed Sheikh
EXECUTIVE ENGINEER OFFICE REW RAMBAN
AS PER NIT
2026_RDPR_309204_1
NIT No 05 OF REW RAMBAN OF 2026 2027 UNDER HEAD CDF BLOCK RAMBAN
Open Tender
Civil Works
30 days
Ramban
AS PER NIT
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹6,000
8 May 2026
2 May 2026
8 May 2026
2 May 2026
7 May 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) with 30% boulder . | - | cum | 6,591.25 | - |
| 2 | Placing and laying of Boulders. | - | Cum | 751.55 | - |
| 3 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steelprimer allcomplete. Welded | 1 | Kg | 127.3 | ₹127.17 |
| 4 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in charge. 16.25.1 Made of G.I. wire of dia 4 mm | - | Sqm | 809.9 | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for:Beams | - | sqm | 286.35 | - |
| 6 | Carriage of steel from source to site by mechanical transport or animal transport or by head load | - | cum | 306 | - |
| 7 | Carriage of Cement from source to site by mechanical transport or animal transport or by head load | - | cum | 306 | - |
| 8 | Carriage of Sand from source to site by mechanical transport or animal transport or by head load | - | cum | 1,536.02 | - |
| 9 | Carriage of Stone Aggregates from source to site by mechanical transport or animal transport or by head load | - | cum | 432.02 | - |
| 10 | Carriage of Stone from source to site by mechanical transport or animal transport or by head load | - | cum | 642 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.22 MB
BOQ_1001176.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid