| 1 | 1₹4.2 LAccepted-Finance | ₹4.2 L | 1 | Accepted-Finance Being First Lowest |
| 2 | 2₹4.3 LRejected-Finance 180 STREET NO 10 HARPAL NAGAR NEAR TRIVENI MANDIR BHATTI ROAD BATHINDA | BATHINDA | PUNJAB | 151001 | ₹4.3 L | 2 | Rejected-Finance Being Second Lowest |
Tender Value
₹4.3 L
EMD Value
₹9,000
Closing Date
22 May 2026, 2:00 pmClosed
Project Manager,(Unit-4) Agra
H No A-121, Sec-13, Avas Vikas Colony, Sikandra, Agra
SLAB REPLACEMENT WORK OF SAINIK KALYAN BOARD OFFICE BUILDING AT COLLECTORATE CAMPUS IN DISTT - AGRA (U.P.)
2026_UPPRC_1149591_2
02/PM-4/UPPCL/2026-27 Dated 16-05-2026
Open Tender
Civil Works - Buildings
90 days
Collecctorate Agra
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
₹9,000
Office of Project Manager,(Unit-4) Agra
6 Jun 2026
16 May 2026
22 May 2026
16 May 2026
22 May 2026
16 May 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1.01 | Demolishing brick work manually/ by mechanical means includingstacking of serviceable material and disposal of unserviceable materialwithin 50 metres lead as per direction of Engineer-in-charge.In cement mortar | - | CUM | - | - | BI01010001010000000000000515BI0100001113 |
| 1.02 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within50 metres lead as per direction of Engineer - in- charge. | - | CUM | - | - | BI01010001010000000000000515BI0100001114 |
| 1.03 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles above 25 mm and up to 40 mm | - | SQM | - | - | BI01010001010000000000000515BI0100001115 |
| 1.04 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transportincluding loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, completeas per directions of Engineer-in-charge. | - | CUM | - | - | BI01010001010000000000000515BI0100001116 |
| 1.05 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinthlevel up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate20 mm nominal size derived from natural sources). | - | CUM | - | - | BI01010001010000000000000515BI0100001117 |
| 2Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers. | ||||||
| 3Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinthlevel up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate20 mm nominal size derived from natural sources). | ||||||
| 4Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform | ||||||
| 5Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. (TMT Bars) Fe-500 | ||||||
| 6Brick work with common burnt clay F.P.S. (non modular) bricks of classdesignation 7.5 in superstructure above plinth level up to floor V level inall shapes and sizes in : | ||||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.16 MB
Bid_Sainik.pdf
Tender Documents • 4.78 MB
BOQ_2152134.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid