| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.6 LAccepted-AOC | ₹13.6 L | L1 | Accepted-AOC AOC |
| 2 | L2₹17.1 LRejected-Finance | ₹17.1 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | M/S Mahender singh L2 | AVISHEK GAUR L1 |
|---|---|---|---|---|---|
| 1.01 | Earthwork in filling with carriage upto 10 km by power transport i/c lift upto 1.50 m with proper levelling, dressing and manual compaction i/c all labour, T&P etc as required for proper completion of work. | 592 | Cum | 374 ₹2,21,408 | 165 ₹97,680 Lowest |
| 1.02 | Earthwork in Excavation including 1.50m lift and 30m lead. with proper levelling, dressing and manual compaction i/c all labour, T&P etc as required for proper completion of work. | 13.5 | Cum | 85 ₹1,147.5 Lowest | 90 ₹1,215 |
| 1.03 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60M as per direction of Engineer-in-charge i/c all cost labour and T&P etc. | 89 | Cum | 520 ₹46,280 Lowest | 570 ₹50,730 |
| 1.04 | Dismantling of damaged split stone pitching with 20 to 40 Kg & Stacking of material with all lead and lift i/c all cost labour and T&P etc. | 248.5 | Cum | 138 ₹34,293 Lowest | 142 ₹35,287 |
| 1.05 | Providing and laying C.C. 1:3:6 i/c cost of labour, material, carriage, T&P etc. complete. | 20.5 | Cum | 5,000 ₹1,02,500 Lowest | 5,200 ₹1,06,600 |
| 1.06 | Laying pitching of Split Stone 20 to 40 Kg weight i/c all labour, T&P etc required for proper complition of work but excluding cost of Split Stone. | 248.5 | Cum | 385 ₹95,672.5 Lowest | 400 ₹99,400 |
| 1.07 | Providing & Laying pitching of Split Stone 20 to 40 Kg weight i/c all cost of material, labour, carriage and T&P etc. complete. | 126.5 | Cum | 3,000 ₹3,79,500 | 1,938 ₹2,45,157 Lowest |
| 1.08 | Random rubble stone masonry with cement mortar 1:4 (1 cement : 4 coarse sand) in including all cost of material, labour and T&P etc. up to 60 M lead etc complete. | 41.3 | Cum | 5,000 ₹2,06,500 | 3,836 ₹1,58,426.8 Lowest |
| 1.09 | Providing and laying C.C. 1:1.5:3 i/c cost of labour, material, carriage, T&P etc. complete. | 6.5 | Cum | 5,000 ₹32,500 Lowest | 6,900 ₹44,850 |
| 1.10 | Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete. | 35.1 | Cum | 5,000 ₹1,75,500 | 3,655 ₹1,28,290.5 Lowest |
Tender Value
₹21.4 L
EMD Value
₹44,000
Closing Date
16 Jun 2026, 3:00 pmClosed
Executive Engineer
office of executive engineer head works division agra canal okhla new delhi
Restoration of Damaged Shank and road and Parapet wall Between Km. 0.010 to Km. 0.061 on Spur No 26 at Alipur marginal bundh on left bank of river Yamuna in Distt. Ghaziabad
2026_UPIDC_1158840_1
03/EE/2026-27
Open Tender
Civil Works
Item Rate
45 days
at Alipur marginal bundh on left bank of river Yam
at Alipur marginal bundh on left bank of river Yamuna in Distt. Ghaziabad
2 documents required · 2 mandatory
₹354
₹44,000
24 Aug 2026
10 Jun 2026
16 Jun 2026
10 Jun 2026
16 Jun 2026
10 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earthwork in filling with carriage upto 10 km by power transport i/c lift upto 1.50 m with proper levelling, dressing and manual compaction i/c all labour, T&P etc as required for proper completion of work. | 592 | Cum | - | - |
| 1.02 | Earthwork in Excavation including 1.50m lift and 30m lead. with proper levelling, dressing and manual compaction i/c all labour, T&P etc as required for proper completion of work. | 13.5 | Cum | - | - |
| 1.03 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60M as per direction of Engineer-in-charge i/c all cost labour and T&P etc. | 89 | Cum | - | - |
| 1.04 | Dismantling of damaged split stone pitching with 20 to 40 Kg & Stacking of material with all lead and lift i/c all cost labour and T&P etc. | 248.5 | Cum | - | - |
| 1.05 | Providing and laying C.C. 1:3:6 i/c cost of labour, material, carriage, T&P etc. complete. | 20.5 | Cum | - | - |
| 1.06 | Laying pitching of Split Stone 20 to 40 Kg weight i/c all labour, T&P etc required for proper complition of work but excluding cost of Split Stone. | 248.5 | Cum | - | - |
| 1.07 | Providing & Laying pitching of Split Stone 20 to 40 Kg weight i/c all cost of material, labour, carriage and T&P etc. complete. | 126.5 | Cum | - | - |
| 1.08 | Random rubble stone masonry with cement mortar 1:4 (1 cement : 4 coarse sand) in including all cost of material, labour and T&P etc. up to 60 M lead etc complete. | 41.3 | Cum | - | - |
| 1.09 | Providing and laying C.C. 1:1.5:3 i/c cost of labour, material, carriage, T&P etc. complete. | 6.5 | Cum | - | - |
| 1.1 | Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete. | 35.1 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
lot1.pdf
Tender Documents • 2.30 MB
BOQ_2171853.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].