| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC DHEERAHEDI POST BHOPA DISTRICT MUZAFFARNAGAR | BHOPA | MUZAFFARNAGAR | UTTAR PRADESH | ₹1.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.1 CrRejected-AOC HANS BHAWAN KALAGARH ROAD DHAMPUR DISTRICT BIJNOR UTTAR PRADESH | DHAMPUR | BIJNOR | UTTAR PRADESH | ₹1.1 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹1.1 CrRejected-AOC | ₹1.1 Cr | L3 | Rejected-AOC L3 |
| 4 | L4₹1.1 CrRejected-AOC | ₹1.1 Cr | L4 | Rejected-AOC L4 |
| 5 | L5₹1.3 CrRejected-AOC | ₹1.3 Cr | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | MOHAMMAD AWAIS L8 | S R CONTRACTORS L5 | VIKUL KUMAR L1 | M/S PARBHAT ENTERPRISES L7 | M/S VIPIN KUMAR CONTRACTOR L6 | YOGESH KUMAR CONTRACTOR L2 | dinesh kumar contractor L3 | BROTHERS BIJ CONSTRUCTIONS L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation of foundation in ordinary soil with initial lead and all lift with proper disposal and back filling etc. | 2,215 | M3 | 35 ₹77,525 | 95 ₹2.1 L | 18 ₹39,870 | 45 ₹99,675 | 49 ₹1.1 L | 35 ₹77,525 | 36 ₹79,740 | 45 ₹99,675 |
| 2.00 | Supplying and Placing graded Filter in Layers i/c Cost of all Material, Labour T&P,etc i/c all lift and lead for proper completion of work. | 170 | M3 | 1,000 ₹1.7 L | 2,250 ₹3.8 L | 950 ₹1.6 L | 1,600 ₹2.7 L | 1,751 ₹3.0 L | 1,180 ₹2.0 L | 1,180 ₹2.0 L | 1,400 ₹2.4 L |
| 3.00 | Supplying and Laying P.C.C 1:2:4 including cost of all material, labour , T&P etc. complete. | 424 | M3 | 4,900 ₹20.8 L | 4,900 ₹20.8 L | 4,145 ₹17.6 L | 4,850 ₹20.6 L | 4,300 ₹18.2 L | 3,200 ₹13.6 L | 3,200 ₹13.6 L | 4,000 ₹17.0 L |
| 4.00 | Suppling and Laying C.C of M-25 grade including cost of all material, labour , T&P etc. for completion of work. | 39 | M3 | 6,000 ₹2.3 L | 5,150 ₹2.0 L | 4,999 ₹1.9 L | 6,450 ₹2.5 L | 5,000 ₹1.9 L | 5,200 ₹2.0 L | 5,200 ₹2.0 L | 5,000 ₹1.9 L |
| 5.00 | Suppling and Laying R.C.C of M-25 grade including cost of all material, labour , T&P etc. for completion of work iincluding weep holes as per rquirments. | 725 | M3 | 6,400 ₹46.4 L | 6,700 ₹48.6 L | 4,999 ₹36.2 L | 6,450 ₹46.8 L | 6,351 ₹46.0 L | 5,200 ₹37.7 L | 5,200 ₹37.7 L | 4,956 ₹35.9 L |
| 6.00 | Supplying and Laying of reinforcement in R.C.C work including Cutting, Bending, Binding and Placing etc. Including cost of all labour and T&P etc.Complete as directed by Engineer-in -charge. | 46 | MT | 63,000 ₹29.0 L | 67,000 ₹30.8 L | 58,000 ₹26.7 L | 56,000 ₹25.8 L | 62,000 ₹28.5 L | 59,000 ₹27.1 L | 59,000 ₹27.1 L | 48,000 ₹22.1 L |
| 7.00 | Supplying and Laying Centering & shuttering for C.C Work including cost of all material labour T&P etc. complete. | 1,660 | M2 | 450 ₹7.5 L | 200 ₹3.3 L | 350 ₹5.8 L | 495 ₹8.2 L | 300 ₹5.0 L | 250 ₹4.2 L | 250 ₹4.2 L | 400 ₹6.6 L |
| 8.00 | Steel work in built up tubular (Round Square or Rectangular hollow tubes etc) trusses etc i/c cutting ,hoisting ,fixing in position and applying a priming coat of approved steel primer i/c welding and bolted with special shaped washar and all material , labour, T&P etc complete | 20,712 | Kg | 149 ₹30.9 L | 100 ₹20.7 L | 93.35 ₹19.3 L | 139 ₹28.8 L | 150 ₹31.1 L | 120 ₹24.9 L | 120 ₹24.9 L | 125 ₹25.9 L |
| 9.00 | Applying 2 coats of enamel paint including application of with superior synthetic enamel paint of standard make brushing to give an even shade and finishing including cost of material, labour etc | 752 | M2 | 20 ₹15,040 | 80 ₹60,160 | 37 ₹27,824 | 40 ₹30,080 | 45 ₹33,840 | 38 ₹28,576 | 38 ₹28,576 | 35.5 ₹26,696 |
| 10.00 | Providing and fixing expansion joint in RCC Structure (Pucca section) including cost of Typical PVC water stop all material and filled with bitumen for completion of work. | 36 | RM | 200 ₹7,200 | 500 ₹18,000 | 224 ₹8,064 | 299 ₹10,764 | 150.56 ₹5,420.16 | 245 ₹8,820 | 245 ₹8,820 | 225 ₹8,100 |
Tender Value
₹1.6 Cr
EMD Value
₹3.3 L
Closing Date
19 Dec 2025, 10:00 amClosed
S.E.
E.G.C.C. Circle, Bijnor
Construction of R.C.C Canal Section in Gap of Kotra Dy. From K.M. 16.135 to 16.315
2025_UPIDC_1098106_2
04/SE/2025-26
Open Tender
Civil Works - Canal
90 days
Bijnor
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹3.3 L
19 Jan 2026
12 Dec 2025
19 Dec 2025
12 Dec 2025
19 Dec 2025
12 Dec 2025
Amount
Earthwork in excavation of foundation in ordinary soil with initial lead and all lift with proper disposal and back filling etc.
Supplying and Placing graded Filter in Layers i/c Cost of all Material, Labour T&P,etc i/c all lift and lead for proper completion of work.
Supplying and Laying P.C.C 1:2:4 including cost of all material, labour , T&P etc. complete.
Suppling and Laying C.C of M-25 grade including cost of all material, labour , T&P etc. for completion of work.
Suppling and Laying R.C.C of M-25 grade including cost of all material, labour , T&P etc. for completion of work iincluding weep holes as per rquirments.
Supplying and Laying of reinforcement in R.C.C work including Cutting, Bending, Binding and Placing etc. Including cost of all labour and T&P etc.Complete as directed by Engineer-in -charge.
Supplying and Laying Centering & shuttering for C.C Work including cost of all material labour T&P etc. complete.
Steel work in built up tubular (Round Square or Rectangular hollow tubes etc) trusses etc i/c cutting ,hoisting ,fixing in position and applying a priming coat of approved steel primer i/c welding and bolted with special shaped washar and all material , labour, T&P etc complete
Applying 2 coats of enamel paint including application of with superior synthetic enamel paint of standard make brushing to give an even shade and finishing including cost of material, labour etc
Providing and fixing expansion joint in RCC Structure (Pucca section) including cost of Typical PVC water stop all material and filled with bitumen for completion of work.
Finishing wall with two coat of water proof cement paint Weather coat of approved quality on previously new surface with this paint to give an even shade including supply of all marerials, labour, Tools & plant etc. required for proper completion of the work.
S/F 65 cm. long 50 mm dia P.V.C. Pipe Spout including cost of all labour and T&P etc.Complete as directed by Engineer-in -charge.
YOGESH KUMAR CONTRACTOR (BID ID -5755779)
dinesh kumar contractor (BID ID -5755871)
BROTHERS BIJ CONSTRUCTIONS (BID ID -5755041)
S R CONTRACTORS (BID ID -5755768)
M/S VIPIN KUMAR CONTRACTOR (BID ID -5754529)
M/S PARBHAT ENTERPRISES (BID ID -5754347)
MOHAMMAD AWAIS (BID ID -5750520)
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.59 MB
Tendernotice_2.pdf
PDF • 0.94 MB
BOQ_2022247.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid