Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-Finance | L1 | Accepted-Finance ok | |
| 2 | L2₹5.0 L+₹96,096 (23.6%)Accepted-Finance | L2 | Accepted-Finance ok | |
| 3 | L3₹5.8 L+₹1.7 L (41.1%)Accepted-Finance | L3 | Accepted-Finance ok | |
| 4 | L4₹5.9 L+₹1.8 L (43.5%)Accepted-Finance | L4 | Accepted-Finance ok |
Tender Value
Refer Docs
EMD Value
₹11,800
Closing Date
29 Sept 2021, 1:00 pmClosed
EEEnMHPI
DELHI JAL BOARD GOVT OF NCT OF DELHI OFFICE OF THE EXECUTIVE ENGINEER EnM HP I HAIDERPUR WATER WORKS DELHI 110085
Repairing strengthening of foundation of p set no. 3 and 6 installed at BPS Bawana. ReInvited
2021_DJB_208683_3
NIT10
Open Tender
Miscellaneous Works
Works
45 days
Haiderpur WTP
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Delhi Jal Board
₹11,800
Yes
6 Oct 2021
22 Sept 2021
29 Sept 2021
22 Sept 2021
29 Sept 2021
22 Sept 2021
Dismantling of suction as well discharge dismantling joint by removing of all nut and bolts on both side by cutting with gas cutter and also fixing of dead flange with rubber packing on both side of the 600 mm dia. sluice valve
Removal of pump set along with motor with coupling set with the help of installed electric hoist or E.O.T. crane to outside of foundation to make the workable space near the foundation.
Breaking of RCC foundation by concrete breaker & disposal of complete malba outside the pump house by manual labour
Repairing of combine M.S. Base frame by strengthening providing of MS plate of width approx. size 250 mm x 1250 mm & thickness 10 mm – 04 nos. along with the width of the base frame also strengthening of M.S. channel along with the length & bottom side the width, this will make the complete strengthening of the base frame in all respect.
MS foundation bolt of length approximately 25 mm dia. x 250 mm length with three nos. nuts one at bottom and other two nos. at top for locking with bolt along with washers.
M.S. complete jaal of size 12 mm x 16 mm tor bar as per the foundation to strengthening RCC foundation provide the all to bear the vibration of pump and the motor on load.
Fixing of MS base frame on the jaal along with the foundation bolt will be fixed as under shown in the drawing. The nut will be used as adjustable of foundation with pump match with suction and delivery side of the existing foundation line. These foundation bolts will be levelled as per the drawing shown. The bottom nut will help the maintain of level of the foundation to match with existing suction and delivery size, because suction and delivery side are fixed in their locations. After proper location of level of the foundation the complete as per the required location the filling of full CC as required by the job. This will be complete in one time grouting of the whole foundation with plaster etc. as required
Replacement of the existing coupling to tyre coupling the approx. 250 KW 998 RPM in the motor suitable with bore keyway as per the motor and pump size.
Dismantling of the dead flange and fixing of the nut bolt and packing with dismantling joint as required.
Nut bolts of various sizes.
Rubber packing.
Fixing of pump set along with the motor with the proper alignment of the coupling as per the required job.
Testing and commissioning.
J.P.S. ASSOCIATES
Darshan Engineering Works
V.K. ENTERPRISES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .