Loading…
Loading…
Tender Value
₹2.0 L
EMD Value
₹4,040
Closing Date
30 Jul 2026, 4:00 pm4d left
Executive Engineer RNB Division Pulwama
Executive Engineer RNB Division Pulwama
Repair and renovation of DC Office Pulwama Main building(Conference hall table ).
2026_PWDJK_317158_1
74 /EEP/RNB/of 2026-2027/ 3882-92 Dt.21.06.2026
Open Tender
Civil Works
Percentage
10 days
Pulwama
as per nit
3 documents required · 3 mandatory
₹200
Bearing No 0470010200000099
₹4,040
21 Jul 2026
21 Jul 2026
31 Jul 2026
21 Jul 2026
30 Jul 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing beams including hoisting, fixing in position and applying wood preservative for the unexposed surfaces, etc. complete with : Second class kail wood | - | cum | - | - |
| 2 | P/f of 12 mm plywood marin grade BWP Of approved brand and make complete job all as per directions of EIC. | - | sqm | - | - |
| 3 | P/f of 1 mm thick decorative laminated sheet as per directions of engineer incharge | 1 | sqm | - | - |
| 4 | P/A OF DECO PAINT I/C PREPARING OF SURFACE BY SAND PAPER , APPLYING PU , SEALENT , REMOVING OF EXISTING PAINT ON WOOD WORK COMPLETE JOB | - | sft | - | - |
| 5 | P/F of HDMR PANELLING/ boards 12 mm thick of greenply , infra , action tesa or equivalent all necessary fastners, mouldings i/c carving , designs complete job plus i/c P/A DECO PAINT over prepared surfave after applying sandpapering , applying sealer , pu complete job all as per directions of EIC. | - | sft | - | - |
| 6 | P/A PU (P0LYURETHANE) PAINT MATTE FINISH ON HDHMR I/C PREPRATION OF SURFACE, FILLING OF DENTS , ONE COAT OF WOODEN SEALER , TWO COATS OF PU PRIMER PLUS MINIMUM TWO COATS OF 2K PU TOP COAT USING SPRAY , FINISH TO BE SMOOTHAS PER DIRECTIONS o OF ENGINEER INCHARGE | - | sft | - | - |
| 7 | P/F OF TOUGHENED GLASS 8 MM THICK ONTOP OF TABLE OF APPROVED MAKE AND AS PER DIRECTIONS OF ENGINEER INCHARGE | - | sqm | - | - |
| 8 | Add provision for carpenter charges for reducing the size of exixsting table from 7 feet to 5.5 feet , i/c cutting in hald, refixing as per directions of engineer incharge complete job | - | - | - | - |
| 9 | carpenter charges | - | no | - | - |
| 10 | labour charges | - | no | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_1038122.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].