Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.5 LAdmitted-Finance | -55.56% | ₹6.5 L | L1 | Admitted-Finance |
| 2 | L2₹6.9 LAdmitted-Finance | -52.33% | ₹6.9 L | L2 | Admitted-Finance |
| 3 | L3₹7.2 LAdmitted-Finance | -50.20% | ₹7.2 L | L3 | Admitted-Finance |
| 4 | L4₹7.3 LAdmitted-Finance | -49.55% | ₹7.3 L | L4 | Admitted-Finance |
| 5 | L5₹7.4 LAdmitted-Finance | -49.00% | ₹7.4 L | L5 | Admitted-Finance |
Updated dates
Tender Value
₹14.5 L
EMD Value
₹29,040
Closing Date
29 Jan 2026, 4:00 pmClosed
Er ranjit singh
XEN PWD RNB DIVISION RAMBAN
refer to BOQ
2026_PWDJK_300841_8
E-NIT NO. 128 Of 2025-26 Dated 16-01-2026
Open Tender
Civil Works
30 days
Gam-Ramban
refer to NIT
2 documents required · 2 mandatory
₹600
Yes
XEN PWD RNB DIVISION RAMBAN
₹29,040
Yes
5 Feb 2026
16 Jan 2026
30 Jan 2026
17 Jan 2026
29 Jan 2026
17 Jan 2026
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1 meter from cutting edge i)All kinds of soil =85%
ii) Ordinary Rock =15%
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with (i) 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
ii)1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 30% bouders
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Dry Random Rubble Masonary with hard stone in foundation and plinth Using Nallah stone with out bond stone
Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete
Dumping of stone In Horizontal on level including cost of stones.
Carriage of Sand from Source to site of work by Mechanical transport including loading /Unloading complete for an avg distance of 138 km by MT
Carriage of Stone aggregate from Source to site of work by Mechanical transport including loading /Unloading complete for an avg. distance of 18 km by MT
Carriage of Stone from source to site of work by Mechanical transport including Loading /Unloading complete for an Avg. distance of 10 Km by MT
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
BOQ_975876.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid