Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹16.3 LSame as L1Accepted-AOC | L2 | Accepted-AOC ACCEPTED | |
| 2 | L1₹16.3 LRejected-AOC | L1 | Rejected-AOC REJECTED | |
| 3 | L3₹17.0 L+₹65,356.35 (4.00%)Rejected-AOC MU PO TA LANJA JI RATNAGIRI | LANJA | RATNAGIRI | MAHARASHTRA | L3 | Rejected-AOC REJECTED | |
| 4 | L4₹17.0 L+₹65,356.35 (4.00%)Rejected-AOC | L4 | Rejected-AOC REJECTED | |
| 5 | Rejected-Technical MU PO KUWARBAV TAL DIST RATNAGIRI | RATNAGIRI | MAHARASHTRA | 403522 | - | Rejected-Technical REJECT DUE TO PROFESSIONAL TAX |
Tender Value
₹16.3 L
EMD Value
₹20,000
Closing Date
10 Nov 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Works Department ZP Ratnagiri
Dr.Babasaheb Ambedkar Bhavan Ground Floor Executive Engineer Works Department Ratnagiri ZP Ratnagiri.
STBT to Khanawali Chinchwadi to Kalkarwadi road VR95 Tal Lanja Dist-Ratnagiri
2025_RATNA_1238295_3
RZP/WD-Ratnagiri/E-Ten Un EMP ENGR-09/25-26
Open Tender
Civil Works - Roads
Percentage
LANJA
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹20,000
22 Apr 2026
3 Nov 2025
12 Nov 2025
3 Nov 2025
10 Nov 2025
3 Nov 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item No 1-"Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as
directed.2.10 | 22.91 | Cmt | 130.9 | ₹2,998.92 |
| 2 | Item No 1 B ) Providing earth work in embankment with approved materials obtained from other sources upto lead of 50m. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97 % of standard proctor density etc. complete ( Material obtained from Other sources) | 1 | Cmt | - | - |
| 3 | Item No 2-Supplying 60 mm Laterite Stone Metal At The Road Side For Metal including Conveying &Stocking etc.R A2 | 40.3 | Cmt | 933.12 | ₹37,604.74 |
| 4 | Item No 3-Supplying soft murum at the road site, including conveying and stacking complete. | 1 | Cmt | - | - |
| 5 | Item No 4-Spreading 80/60 mm metal for road work including sectionong etc complete as directed by Engineer in charge . 50.58 | 40.3 | Smt | 93.5 | ₹3,768.05 |
| 6 | Item No 5-Spreading hard murum/ soft murrum/ gravel or kankar for side width complete2.30 | 14.76 | Smt | 86.9 | ₹1,282.64 |
| 7 | Item No 6-Compacting For 60mm Lat.Stone Metel Layers With Power Roller including Necessary Labour Materials And Artificial Watering Etc. | 390 | Smt | 17.6 | ₹6,864 |
| 8 | Item No 7-Providing and constructing 50 mm. thick Modified Penetration Macadam (MPM) road surface including all mataerials, preparing the existing road surface, spreading 40mm. stone metal layers 100% crusher broken metal with conical crusher plant heating and spraying the bitumen of specified grade @ 1.75 Kilogram/Square Metre, spreading 12mm.size chips compacting with static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc. complete. Including picking of existing WBM surface.(VG-30 bulk bitumen rates are considered to arrive at rates) R A 2 | 2,631 | Smt | 293.78 | ₹7,72,935.18 |
| 9 | Item No 8-Providing 20mm Thick Premix bituminous Carpet including Supplying All Materials Preparing And Cleaning The Bese Heating Bitumen Applying Tack Coat At Specified Rate Mixing Hot Bitumen And Chips Laying The Carpet Layer And Compacting R A3 | 2,631 | Smt | 204.77 | ₹5,38,749.87 |
| 10 | Item No 9 -Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials and bitumen of specified grade preparing existing road surface, heating and applying bitumen @ 0.98 KilogramSquare Metre. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete. (VG-30 bulk bitumen rates are considered to arrive at rates) R A4 | 2,631 | Smt | 91.25 | ₹2,40,078.75 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.03 MB
B1khanawali.pdf
Tender Document • 2.15 MB
Tendernotice_1.pdf
Tender Document • 2.03 MB
BOQ_2136500.xls
BOQ • 0.25 MB
B1khanawali.pdf
Tender Documents • 2.15 MB
BOQ_2136500.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .