Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 CrAccepted-Finance PATHRA BARGO RUSTAMPUR GORAKHPUR UP 273016 | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273016 | L1 | Accepted-Finance AS PER FINANCE EVALUATION | |
| 2 | L2₹11.4 Cr+₹1.2 Cr (12.3%)Rejected-Finance | L2 | Rejected-Finance AS PER FINANCE EVALUATION | |
| 3 | L3₹11.6 Cr+₹1.5 Cr (14.6%)Rejected-Finance | L3 | Rejected-Finance AS PER FINANCE EVALUATION | |
| 4 | L4₹11.8 Cr+₹1.7 Cr (16.6%)Rejected-Finance | L4 | Rejected-Finance AS PER FINANCE EVALUATION | |
| 5 | Rejected-Technical | - | Rejected-Technical AS PER TECHNICAL EVALUATION |
| Sl No | Description | Qty | Unit | M/S MITTAL BROTHERS ENGINEERS AND L4 | M/S AJIT CONSTRUCTION AND ORDER SUPPLIER L1 | RAM NARAYAN YADAV L2 | M/S ARUN CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of Existing Double Brick Lining and its proper disposal within an initial lead of 60m with cost of labour,T&P for proper completion of work as directed by Engineer-in-Charge as per I.D. specification. | 1,909.46 | Cum | 250 ₹4,77,365 Lowest | 250 ₹4,77,365 Lowest | 470 ₹8,97,446.2 | 250 ₹4,77,365 Lowest |
| 2.00 | Earth work in filling to recoup of the Canal Section including cost of materials,T&P and labours and other accessories required for proper completion of work as directed by Engineer-in-Charge as per I.D. specification. | 28,170.45 | Cum | 200 ₹56,34,090 | 70 ₹19,71,931.5 Lowest | 100 ₹28,17,045 | 130 ₹36,62,158.5 |
| 3.00 | Earth work for making Ramp for working in canal every 500 meters at Right side including cost of material,labour,T&P and other accessories required for proper completion of work as directed by Engineer-in-Charge as per I.D. specification. | 1,003.3 | Cum | 200 ₹2,00,660 | 70 ₹70,231 Lowest | 100 ₹1,00,330 | 125 ₹1,25,412.5 |
| 4.00 | Earth work in excavation in foundation for toe wall,top/cut off wall and for sleepers including digging and refilling the trenches with its proper disposal within 30 meter lead & all lift with cost of labour and T&P for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 12,500.21 | Cum | 140 ₹17,50,029.4 | 50 ₹6,25,010.5 Lowest | 55 ₹6,87,511.55 | 75 ₹9,37,515.75 |
| 5.00 | Plain Cement Concrete in 1:4:8: in base of Toe wall with Coarse sand having F.M. > 2.5,old dismental brick ballast of nominal size of 20mm to 40mm ,placed in position and properly compacted including cost of all material,labour and T&P with all lead and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 93.75 | Cum | 9,000 ₹8,43,750 | 3,500 ₹3,28,125 Lowest | 4,200 ₹3,93,750 | 4,700 ₹4,40,625 |
| 6.00 | Plain Cement Concrete in M15 in Sleepers and Top/Cut off wall with Coarse sand having F.M. > 2.5,Crushed stone Aggregate of nominal size of 12.5 mm to 20 mm, Mechanically mixed,placed in position and properly compacted including cost of all material,labour and T&P with all lead and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 2,351.3 | Cum | 9,300 ₹2,18,67,090 | 9,250 ₹2,17,49,525 | 8,400 ₹1,97,50,920 | 8,150 ₹1,91,63,095 Lowest |
| 7.00 | Plain Cement Concrete M20 in Toe wall with Coarse sand having F.M. > 2.5,Crushed stone Aggregate of nominal size of 12.5 mm to 20 mm, Mechanically mixed,placed in position and properly compacted including cost of all material,labour and T&P with all lead and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 700.25 | Cum | 9,500 ₹66,52,375 | 9,470 ₹66,31,367.5 | 8,800 ₹61,62,200 | 8,550 ₹59,87,137.5 Lowest |
| 8.00 | Plain Cement Concrete 125 mm thick M20 Grade in Lining with Coarse Sand having F.M. Not less than 2.5, Crushed Stone Aggregate of nominal size of 12.5 mm to 20 mm, Mechanically mixed, placed in position with Concrete Paver Machine and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing. | 34,462.57 | Sqm | 1,400 ₹4,82,47,598 | 1,300 ₹4,48,01,341 Lowest | 1,325 ₹4,56,62,905.25 | 1,400 ₹4,82,47,598 |
| 9.00 | Supplying and laying Coarse Sand below Stone Grit with proper compaction and rolling including cost of all material,labour and T&P with all lead and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 1,472.25 | Cum | 4,600 ₹67,72,350 | 3,000 ₹44,16,750 Lowest | 4,500 ₹66,25,125 | 4,200 ₹61,83,450 |
| 10.00 | Supplying and laying Stone Grit below Cement concrete lining with proper compaction and rolling including cost of all material,labour and T&P with all lead and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 1,472.25 | Cum | 4,600 ₹67,72,350 | 3,169.75 ₹46,66,664.44 Lowest | 4,800 ₹70,66,800 | 4,950 ₹72,87,637.5 |
Tender Value
Refer Docs
EMD Value
₹28 L
Closing Date
30 Jul 2025, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER GANDAK IRRIGATION WORK CIRCLE-1, GORAKHPUR
Restoration of Main Western Gandak Canal internal Damage Lining left slope and right slope in between KM. 81.000 to KM. 95.250 in District Kushinagar
2025_UPIDC_1057000_1
02/SE/2025-26
Open Tender
Civil Works
Item Wise
635 days
PADRAUNA
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,354
₹28 L
Yes
20 Jan 2026
15 Jul 2025
30 Jul 2025
15 Jul 2025
30 Jul 2025
15 Jul 2025
Amount
Dismantling of Existing Double Brick Lining and its proper disposal within an initial lead of 60m with cost of labour,T&P for proper completion of work as directed by Engineer-in-Charge as per I.D. specification.
Earth work in filling to recoup of the Canal Section including cost of materials,T&P and labours and other accessories required for proper completion of work as directed by Engineer-in-Charge as per I.D. specification.
Earth work for making Ramp for working in canal every 500 meters at Right side including cost of material,labour,T&P and other accessories required for proper completion of work as directed by Engineer-in-Charge as per I.D. specification.
Earth work in excavation in foundation for toe wall,top/cut off wall and for sleepers including digging and refilling the trenches with its proper disposal within 30 meter lead & all lift with cost of labour and T&P for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Plain Cement Concrete in 1:4:8: in base of Toe wall with Coarse sand having F.M. > 2.5,old dismental brick ballast of nominal size of 20mm to 40mm ,placed in position and properly compacted including cost of all material,labour and T&P with all lead and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Plain Cement Concrete in M15 in Sleepers and Top/Cut off wall with Coarse sand having F.M. > 2.5,Crushed stone Aggregate of nominal size of 12.5 mm to 20 mm, Mechanically mixed,placed in position and properly compacted including cost of all material,labour and T&P with all lead and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Plain Cement Concrete M20 in Toe wall with Coarse sand having F.M. > 2.5,Crushed stone Aggregate of nominal size of 12.5 mm to 20 mm, Mechanically mixed,placed in position and properly compacted including cost of all material,labour and T&P with all lead and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Plain Cement Concrete 125 mm thick M20 Grade in Lining with Coarse Sand having F.M. Not less than 2.5, Crushed Stone Aggregate of nominal size of 12.5 mm to 20 mm, Mechanically mixed, placed in position with Concrete Paver Machine and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing.
Supplying and laying Coarse Sand below Stone Grit with proper compaction and rolling including cost of all material,labour and T&P with all lead and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Supplying and laying Stone Grit below Cement concrete lining with proper compaction and rolling including cost of all material,labour and T&P with all lead and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Providing and laying LDPE Sheet on slope, below and cutt off Wall including cost of all materials,labour,with all lead and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Centering and Shuttering of C.C. work including cost of all material, labour,and T&P with all lead and up lift/down lift for proper completion of work as directed by Engineer-in-Charge as per I.D. specification.
Supply and fixing Pressure Relief Valve including cost of all materials,labour,with all lead and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.etc
Porviding and Fixing sealing compound in between panel joints including cost of all material,labour and T&P with all lead and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Supplying and laying of Water stopper for water resistance at transverse sleepers including cost of all materials, labour and T&P etc proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Supplying and fixing CPVC pipe 25 mm dia in sleeper including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Running of 5 H.P. generator set Pump for Dewatering including arrangement of pump suction and delivery pipes and other accessories at site including cost of material,labour and T&P etc. required for complete work as directed by engineer-in-charge as per I.D. specification.
Brick on edge soling with old dismantled lining brick/tile including preparation of sub-grade to prescribed camber, filling joint with local sand/earth including all cost of materials, T&P and labours and other accessories required for proper completion of work as directed by engineer-in-charge as per I.D. specification.(Reuse of brick ballast from dismantling of existing lining)
RAM NARAYAN YADAV (BID ID -5385411)
M/S ARUN CONSTRUCTION (BID ID -5367960)
M/S MITTAL BROTHERS ENGINEERS AND (BID ID -5385319)
stage.html
html • 0.05 MB
technical_1923757.pdf
techsummary_1923757.pdf
finance_1923757.pdf
BOQ Comparative Chart
xlsx
finsummary_1923757.pdf
cancelled_1.pdf
pdf • 0.31 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BID01.pdf
Tender Documents • 1.77 MB
BOQ_1923757.xls
BOQ • 0.29 MB
Tenderdocument.pdf
Tender Documents • 1.77 MB
BOQ.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .