| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 CrAccepted-Finance 2 237 A PONNAGAR METTUR DAM SALEM DT 636401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹11.9 Cr | L1 | Accepted-Finance L1 Tenderer |
| 2 | L2₹12.3 CrAccepted-Finance | ₹12.3 Cr | L2 | Accepted-Finance L2 tenderer |
| 3 | L3₹12.3 CrAccepted-Finance | ₹12.3 Cr | L3 | Accepted-Finance L3 Tenderer |
| 4 | L4₹13.8 CrAccepted-Finance | ₹13.8 Cr | L4 | Accepted-Finance L4 Tenderer |
| Sl No | Description | Qty | Unit | parimala fabricators and Engineering Works L1 | SRI ABIRAMI CONSTRUCTIONS L2 | geminiengineeringworks L3 | RR PRESTRESS INDUSTRIES L4 |
|---|---|---|---|---|---|---|---|
| 1.00Manufacture and supply 8.00m (200Kg-WL) PSC Poles (REC design) cast in M42 Design Mix(1:1.14:2.33) using OPC cement of 53 Grade, 4mm dia. HTS Wire, 10mm & 12mm machine crushed metal of 50% each (HBG stone jelly) and river sand (sieved) using the Twin mould Form boxes including cost of labour charges for cleaning and fixing of Form boxes, stretching and tensioning of HTS wires, mixing and conveying and placing of concrete, vibrating, curing in bed for three days (not less than 72 hours),Casting & testing of cubes of size 15 X 15 X 15cm for ascertaining the strength of Concrete for de-tensioning, cutting of HTS wire, removing of bolt & nuts, shifting of Poles to the Curing Tanks for curing and lifting the poles from curing tank to stacking Platform after leveling the stacking Yard, painting at top & bottom using anti corrosive paint including cost of wedges, barrels, bolts. nuts, empty gunnies for covering the poles in bed for 3 days, welding Electrodes, waste oil, hydraulic jacks, tensioning machines, welding plants, water hose, properly insulated cables for welding and power supply, PVC hose and necessary T&Ps for maintaining the Yard, testing of poles for its quality for acceptance of supply, charges towards keeping the form boxes etc., in proper shape and including cost of all materials, cement, HTS wire, M-sand and metal, labour, lead, lift etc., complete in the Western side platform at M.G.Pudur PSC Yard. | |||||||
| 1.01 | 8.00m (REC DESIGN) (WL-200Kg) PSC Poles | 39,600 | Nos | 2,547 ₹10.1 Cr | 2,625 ₹10.4 Cr | 2,630 ₹10.4 Cr | 2,950 ₹11.7 Cr |
| 2.00GST for bidders within TamilNadu Note : Bidders within Tamil Nadu shall enter values separately for SGST and CGST and shall enter the value as "Zero" for IGST. | |||||||
| 2.01 | SGST | 1 | % | 0.09 ₹90.8 L | 0.09 ₹93.6 L | 0.09 ₹93.7 L | 0.09 ₹1.1 Cr |
| 2.02 | CGST | 1 | % | 0.09 ₹90.8 L | 0.09 ₹93.6 L | 0.09 ₹93.7 L | 0.09 ₹1.1 Cr |
| 3.00GST for bidders outside TamilNadu Note: Bidders outside Tamil Nadu shall enter value only for IGST and shall enter the value as "Zero" for SGST and CGST . | |||||||
| 3.01 | IGST | 1 | % | - | - | - | - |
Tender Value
Refer Docs
EMD Value
₹13.2 L
Closing Date
15 Sept 2025, 2:00 pmClosed
Superintending Engineer/Civil/ PCC
Superintending Engineer Civil PCC 4th floor Western wing NPKRR Maaligai 144 Anna Salai Chennai 2.
Manufacture and supply of 39600 Nos of 8m WL 200kg PSC poles REC Design cast in twin mould form boxes in the Western side platform at M G Pudur PSC Yard for a period of three years.
2025_EB_592804_1
SE/C/PCC/19/2025- 26
Open Tender
Civil Works - Others
1095 days
M G Pudur
As per tender specification
5 documents required · 5 mandatory
₹0
₹13.2 L
Yes
3 Dec 2025
14 Aug 2025
16 Sept 2025
14 Aug 2025
15 Sept 2025
14 Aug 2025
14 Aug 2025 - 20 Aug 2025
Amount
Manufacture and supply 8.00m (200Kg-WL) PSC Poles (REC design) cast in M42 Design Mix(1:1.14:2.33) using OPC cement of 53 Grade, 4mm dia. HTS Wire, 10mm & 12mm machine crushed metal of 50% each (HBG stone jelly) and river sand (sieved) using the Twin mould Form boxes including cost of labour charges for cleaning and fixing of Form boxes, stretching and tensioning of HTS wires, mixing and conveying and placing of concrete, vibrating, curing in bed for three days (not less than 72 hours),Casting & testing of cubes of size 15 X 15 X 15cm for ascertaining the strength of Concrete for de-tensioning, cutting of HTS wire, removing of bolt & nuts, shifting of Poles to the Curing Tanks for curing and lifting the poles from curing tank to stacking Platform after leveling the stacking Yard, painting at top & bottom using anti corrosive paint including cost of wedges, barrels, bolts. nuts, empty gunnies for covering the poles in bed for 3 days, welding Electrodes, waste oil, hydraulic jacks, tensioning machines, welding plants, water hose, properly insulated cables for welding and power supply, PVC hose and necessary T&Ps for maintaining the Yard, testing of poles for its quality for acceptance of supply, charges towards keeping the form boxes etc., in proper shape and including cost of all materials, cement, HTS wire, M-sand and metal, labour, lead, lift etc., complete in the Western side platform at M.G.Pudur PSC Yard.
8.00m (REC DESIGN) (WL-200Kg) PSC Poles
GST for bidders within TamilNadu Note : Bidders within Tamil Nadu shall enter values separately for SGST and CGST and shall enter the value as "Zero" for IGST.
GST for bidders outside TamilNadu Note: Bidders outside Tamil Nadu shall enter value only for IGST and shall enter the value as "Zero" for SGST and CGST .
SRI ABIRAMI CONSTRUCTIONS (BID ID -1456580)
geminiengineeringworks (BID ID -1457174)
RR PRESTRESS INDUSTRIES (BID ID -1458955)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
BOQ_707977.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid