Tender Value
₹13.4 L
EMD Value
₹13,410
Closing Date
12 Dec 2024, 3:00 pmClosed
President, Annalagraharam Panchayat
Annalagraharam Panchayat,Kumbakonam panchayat union
Thanjavur District Kumbakonam- Construction of New 30000 liter OHT at Thirumeignanam Periyar Nagar in Annalagrharam Panchayat Under FC 2023-2024
2024_RDTN_507599_1
Rc.No.3238/2023/A2 dated 24.11.2024
Open Tender
Civil Works
Item Rate
180 days
Annalagraharam Panchayat, Kumbakonam panchayat unio
Construction of New OHT
9 documents required · 9 mandatory
₹0
₹13,410
Yes
16 Dec 2024
5 Dec 2024
12 Dec 2024
5 Dec 2024
12 Dec 2024
5 Dec 2024
Amount
Construction of 30000 lit OHT in Thirumeignanam Periyar Nagar at Annalagraharam Panchayat.
Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by TWAD board Officers First depth of 2m From 0 to 2 m below GL In hard stiff clay, stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil S.S.20B
Second depth of 2m From 2m to 4 m below GL
Sand filling for foundation with clear river sand including cost of sand, watering ,ramming and consolidation etc complete as directed by TWAD Bord officers
Plain Cement Concrete 1:4:8 (one cement, four sand and eight hard granite broken stone of 40mm size ISS gauge) for foundation and footing including mixing, placing, ramming ,finishing curing etc. complete in accordance with standard specification and as directed by the TWAD Board Officers.
Reinforced Cement Concrete Mix M30 grade using 10mm & 20mm Hard blue granite Broken stone (machine crushed) excluding the cost of RTS rods for reinforcement and centering, strutting, shuttering but including cost of all materials mixing, laying, Vibrating the concrete with mechanical vibrators, ramming, consolidating, finishing and curing etc., Complete and as directed by the TWAD Board Officers.
Below 1.5m from GL Column footing
0m to 1.50m below GL Base Slab for fixing MS ladder at GL
0m to 4.50m above GL
4.50 m to 7.32 m above GL
7.32 m to 10.98 m above GL
10.98 m to 14.64 m above GL
14.64 m to 18.30 m above GL
Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG10 stiffened with MS angle of size 25 X 25 X 3 mm for boarding laid over I type MS Truss of size 25 X 25 X 3mm about 90cm c/c and supported by 40mm GI pipes (Medium) spaced at 75cm c/c etc complete and as directed by the TWAD Board Officers.
Below GL
From GL to 3.30m
From 5.30 m to 6.30m above GL
From 8.30m to 9.30m above GL
From 11.30m to 12.30m
Square Column:(Square Column Below GL and upto 3.30m above GL)
3.31m to 4.30m ht
4.31m to 5.30m ht
5.31m to 6.30m ht
6.31m to 7.30m ht
7.31m to 8.30m ht
8.31m to 9.30m ht
9.31m to 10.30m ht
10.31m to 11.30m ht
11.31m to 12.30m ht
Curved Surface - upto 3.30m ht.
11.30m to 12.30m floor slab above flat form inner and outer face
12.30m to 13.30m side wall above floor slab above flat form
13.30m to 14.30m side wall above floor slab above flat form
14.30m to 15.30m side wall above floor slab above flat form
Supplying, cutting, bending, tying, fabricating and placing in position of steel rods for all RCC works including cost of steel and binding wire etc.( The steel should conform to the relevant ISspecification and supplied with test certificate Fe. 415 grade as per IS specification No.1786/1985 and as amended from time to time) delivery at site of work including loading, freight, unloading, stacking, transit insurance charges, taxes etc. complete.and as directed by the TWAD Board officers.
Painting two coats with approved cement paint over one priming coat of white cement over cement plastered wall surface and ceiling including cleaning preparing the surface and curing etc., complete (using cement paint of colour as approved by the Departmental officer) and as directed by the TWAD Board officers.
Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers
Provision for Rain Water Harvesting and Platform
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Mathiyazhagan (BID ID -1203391)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .