| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC | ₹1.8 Cr | L1 | Accepted-AOC L1 QUOTED LESS THEN TENDER VALUE |
| 2 | L2₹1.8 Cr+₹1.9 L (1.09%)Rejected-AOC | ₹1.8 Cr+₹1.9 L (1.09%) | L2 | Rejected-AOC L2 QUOTED GREATER THEN TENDER VALUE |
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
21 May 2025, 3:00 pmClosed
THE PROJECT DIRECTOR DRDA
THE PROJECT DIRECTOR DRDA,VELLORE
Vellore District Strengthening of 3 roads in Sempalli, Ulli, Valathur panchayat at Gudiyatham block.MGSMT 2025-26 ( Phase-II ) Scheme package No 21
2025_RDTN_557042_1
DIPR/1714/TENDER/2025 VLR
Open Tender
Civil Works
Item Rate
180 days
THE PROJECT DIRECTOR DRDA
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.9 L
THE PROJECT DIRECTOR DRDA,VELLORE
20 Jun 2025
12 May 2025
21 May 2025
12 May 2025
21 May 2025
12 May 2025
14 May 2025
Amount
Strengthening of the Road from Upparapalli Colony Road to Madurai Veeranpatti in Sempalli Panchayat in Gudiyatham Block. (R195) (KM 0/0 - 1/800)
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Providing and laying of Prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II)Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
RCC Slab Culvert (1.50 Mtrs. Span) at ch 0/0
Dismantling the existing damaged RCC Roof including cost and conveyence of all labour charges etc. complete (SoR 2024-2025 / Pg. No. 28 / Unique No. W-0035)
Dismantling of Clearing away ans carefully stacking materials use full for any Random Rubble masnory ion Cement Mortar cost and conveyance of all labour charges etc complete (SoR 2024-2025 / Pg. No. 22 / Unique No. W-0015)
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost andincluding cost and conveyance of all materials to site and all labour charges etc complete
Supplying and erecting centering shuttering including necessary supports for plane including cost and conveyance of all materials to site and all labour for etc Complete
Below sill Level
Above sill Level
Cement concrete 1:2:4 mix using 20mm ISS metal including cost andincluding cost and conveyance of all materials to site and all labour charges etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming etc Complete
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal includingcost and conveyance of all materials to site and all labour for etc Complete
Providing fixing 20mm Thick Compressible Fiber Board, in expansion Joint Complet as per Drawing and MORD tehcnicall Spec.
Providing Weep Holes in Brick Mason / Stone Masonry, plain ./ reinformced concrte abutmenet wing wall, return wall with 100 mm Dia AC Pipe extending through the full width of the Structure with slope of 1 (V) : 20 (H) towards drawing face complete as per drawing and atechcnical specification clauses 614, 709, 1204, 3.7
Providing Gravel filling between body wall including cost and conveyence of grvel labour for filling watering ans compacting etc., complete complying with standard specification and as sdirected bny the departmental officers
CC Pavement
Constrcution of Un - Reinforcmenet of Dowel Jointed and Expansin and Construction of Plaint Cement Concrete Pavement thickness as per design over a prepared Sub Base with 43 Grade Cement or any other Cluase
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete
Provision for Hectometer stone
Provision for Kilometer stone
Provision for 60 CM Equilateral Cautionary Sign Board Charges
Strengthening of the Road from CG Road to Kommavaranpatti in Ulli Panchayat in Gudiyatham Block. (R182) (KM 0/0 - 1/880)
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Providing and laying of Prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II)Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
Provision for Hectometer stone
Provision for Kilometer stone
Provision for 60 CM Equilateral Cautionary Sign Board Charges
Strengthening of the Road from Valathur Varadhapalayam Road to 0/400 Branch Chinnathottalam Road in Valathur Panchayat in Gudiyatham Block. (R185) (KM 0/0 - 1/700)
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Providing and laying of Prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II)Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
RCC Slab Culvert (3 Mtrs. Span) at
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost andincluding cost and conveyance of all materials to site and all labour charges etc complete
Supplying and erecting centering shuttering including necessary supports for plane including cost and conveyance of all materials to site and all labour for etc Complete
Below sill Level
Above sill Level
Cement concrete 1:3:6 mix using 40mm ISS metal including cost andincluding cost and conveyance of all materials to site and all labour charges etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming etc Complete
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal includingcost and conveyance of all materials to site and all labour for etc Complete
RCC Slab Culvert (3 Mtrs. Span) at
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost andincluding cost and conveyance of all materials to site and all labour charges etc complete
Supplying and erecting centering shuttering including necessary supports for plane including cost and conveyance of all materials to site and all labour for etc Complete
Below sill Level
Above sill Level
Cement concrete 1:3:6 mix using 40mm ISS metal including cost andincluding cost and conveyance of all materials to site and all labour charges etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming etc Complete
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal includingcost and conveyance of all materials to site and all labour for etc Complete
Provision for Hectometer stone
Provision for Kilometer stone
Provision for 60 CM Equilateral Cautionary Sign Board Charges
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
N.S CONSTRUCTION (BID ID -1342070)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .