Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-Contractors Renewal Vapous |
Tender Value
₹13 L
EMD Value
₹13,000
Closing Date
13 Sept 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer (VP), Thirukkalukundram
Block Development Office, Thirukkalukundram
Construction of 30000 ltr OHT in Irumbulicheri Colony at Irumbulicheri Panchayat
2021_RDTN_209707_1
RC.No.38/2019/B1
Open Tender
Civil Works - Water Works
Lump-sum
90 days
Construction of 30000 ltr OHT in Irumbulicheri Co
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹13,000
Yes
Block Development Office, Thirukkalukundram
13 Sept 2021
4 Sept 2021
13 Sept 2021
4 Sept 2021
13 Sept 2021
4 Sept 2021
8 Sept 2021
60 days
Amount
PART I: CONSTRUCTION OF 30000 Lit OHT(12.00m STG.HT RAFT. FOUNDATION ) IRUMBULICHERY COLONY AT IRUMBULICHERY PANCHAYAT- THIRUKAZHUKUNDRAM PANCHAYAT UNION Estimate Amount : Rs.13.00 Lakh
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth etc.,
First depth of 2m
Second Depth Footing
Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by TWAD Board officers.
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers.
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffened with welded MS angles of size 25mm x 25mm x3mm of boarding
Plane Surface
Below G.L.To 3.3OM A GL
Curved surface
Square Column
Below G.L
Ground level to 3.30m
Up to 6.31 to 7.30m
Up to 7.31 to 8.30m
Up to 8.31 to 9.30m
Up to 9.31 to 10.30m
Up to 10.31 to 11.30m
Up to 11.31 to 12.30m
Supplying, fabricating and placing in position mild steel/Ribbed tor steel rods for all RCC works including cost of steel and binding wire also in all floors, complete complying with standard specfication.
CEMENT CONCRETE 1:1.5:3 mix using 20mm machine crushed 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work excluding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 (One cement and three sand ) and Kraft paper laid without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers.
For items 1.50m to 4.5m below GL
For items 0 m to 1.50 m below GL
0 to 4.50 above GL
Above 14.64m up to 18.30m above GL
Painting two coats with approved Exterior Emulsion paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete
Supply delivery and fixing of staircase with M30 grade concrete for landings, MS ladder of 0.45m wide using 50x50x5mm MS angles for sides and steps at 0.30m c/c, with GI pipe handrails using 32mm GI pipes for railings and verical support at 0.45m C/c, MS flats (Size 40mm x 5mm ) for horizontal ties at 0.3m c/c and at bottom with Anchor fastener bolts of size 12mm x 75mm including cost of materials labour for fabrication of handrails fixing, painting etc., complete.
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete etc
Providing PVC ventilating arrangements mosquito proof nylon net with 110 mm PVC pipes and cowl and as directed by TWAD Board officers
Providing cut stone slab in CM 1:3 and as directed by RD officers
Providing manhole cover of size 0.60 X 0.60M in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edges and as directed by RD officers.
Painting RD emblem 1 x 1 on the SR with enamel paint as per Board's specification and as directed by RD officers
65mm Ø GI pipes for inlet connection
65mm Ø GI pipes for over flow pipe
65mm Ø GI pipes for scour pipe
65mm Ø GI pipe for delivery pipe
90mm Ø PVC Threaded coupler
63mm Ø PVC Threaded coupler
65 mm Ø GI Tee
65 mm Ø GI 900 Bend
65 mm Ø Gi coupler
65 mm Ø GI union
65 mm Ø GI Elbow
65 mm Ø GI Reducer
75mm x 63mm PVC Reducer
75mm PVC Threaded coupler
75x90 PVC Reducer
75x63 PVC Reducer
65mm Ø GM gate Valve
50mm Ø GM Gate valve
90mm PVC Pipes 6 ksc
Refilling the foundation with excavated earth including consolidation as directed by the Departmental officers.
Labour charges for GI pipe connection to the OHT, for inlet, outlet, overflow and scour arrangements including cutting and threading, earth work excavation & refilling.
Erection Charges to New Submerisible Pump set and Fixing of Panel Board
Earthwork excavation in hard soil for pipelaying work including all cost and labour charges etc.,
Supply and cost of 63mm dia 4KSC PVC pipe for water supply etc.,
Labour Charges for laying and jointing of GI and PVC pipe line
Refilling with excavated earth for pipe including all Labour Charges etc.,complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
KEERTHINATHAN
stage.html
html • 0.02 MB
finance_248817.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .