| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.3 LAccepted-AOC | L-1 | Accepted-AOC AS PER TCR | |
| 2 | L-2₹2.8 L+₹1,636.52 (0.59%)Rejected-Finance VILL P O AMJAI BARDHAMAN BARDHAMAN 713203 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713203 | L-2 | Rejected-Finance REJECTED AS PER TCR | |
| 3 | L-3₹3.4 L+₹66,169.40 (23.9%)Rejected-Finance | L-3 | Rejected-Finance REJECTED AS PER TCR |
Tender Value
₹3.3 L
EMD Value
₹4,100
Closing Date
14 Jul 2022, 11:00 amClosed
GENERAL MANAGER, JHANJRA AREA
OFFICE OF THE GENERAL MANAGER, JHANJRA AREA, PO-LAUDOHA, BO, DIST. - PASCHIM BARDHAMAN, PIN-713385
Salvaging of complete CM machines from panel-24 to panel-25, with shortening of 20R belt for about 150mtr, shifting of load centre, laying of cables for establishing power (6.6KV) of CM-1 in panel-25 in R-VI seam of MIC, J.P. Colly
2022_ECL_248612_1
ECL/GM/JNR/EnM/e-Tender/22-23 /A2/14,dt.27.06.22
Open Tender
Miscellaneous Works
Item Rate
60 days
JHANJRA UNDERGROUND
PLEASE REFER TENDER DOCUMENT
4 documents required · 4 mandatory
₹4,100
4 Dec 2022
2 Jul 2022
15 Jul 2022
2 Jul 2022
14 Jul 2022
4 Jul 2022
2 Jul 2022 - 7 Jul 2022
Amount
Salvaging of complete CM machines from Panel-24 to Panel-25 of CM-1
Placing of 2 nos. VCBs (one at -26L/21R and another at -33L/21R and laying and hanging of approximately 700m 6.6 KV grade cables of 95 sq.mm dia. From -15L/21R to -33L/21R, from there to breaker at -38L/8R for establishing power at panel 25 (CM1).
Advancing of approximately 160 mtr. slack cable laid between VCB and load centre for about 300m by help of MUV and then hanging them behind load centre.
Cable reroute from 21R/-26L. to VCB placed at 21R/-33L and connection at VCB.
Handling and placing the extra cables behind load centre as the load centre move back during shortening of belt from -39L/21R to -37L/21R.
Advancing of approximately 230 mtr. slack cable laid between VCB and load centre for about 96 Mtr. by help of MUV and hanging them behind load centre after the load centre advances 96m (-37L/21R to 37L/19R) (in two shifts as initially 96mtr. of cable will move as the load centre advances and in next shift the left-over slack cables need to be placed behind load centre.
Advancing of approximately 134 mtr. slack cable. laid between VCB and load centre for another 96m by help of MUV and hanging them behind load centre after the load centre advances 96m from panel 24 to panel 25(-37L/19R of Panel 24 to -38L/8R) (in two shifts as initially 96mtr. of cable will move as the load centre advances and in next shift the left-over slack cables need to be placed behind load centre.
Loading and transportation of two nos. of 6.6KV/550V 315KVA transformers, with cables 550V grade/70sq mm/ of approximate length 600mtr from 21R/-15L by MUV and unloading manually and placing of transformer on platform at -38L in between 7R & 8R and laying of cables behind transformer.
Dismantling of 150 mtr. (4 pillars and 22 mtr. extra, pillar size is 32 mtr. centre to centre) of 1200mm belt structure i.e. from -40L to approx. 10m distance from -35L/20R of 20R Belt) (weight of 1200mm structures is 0.085 Te /mtr.)
Transporting of Dismantled Structures and Belting, 4-inch size Pipes, lockout, audio cables of -40L/20R to between -35L/20R and -36L/20R of 20R Belt (Panel 24 CM1) (10 mtr. From -35L/20R) of 20R belt Conveyor and unloading at about 15 mtrs aside for clearing the site and also grouting of tail end frame, belt jointing and trial run of Belt Conveyor in each time, to be done for 1 time shifting
Clearing of site by removal of dismantled belt structures of 1 pillar (pillar size is 32 mtr. centre to centre), which includes 11 foot stools, 22 structures, 33 top brackets, 99 top rollers and 11 bottom rollers, pipes of 4-inch size of about 5 nos. at -40L/20R to about 15 mtrs. aside
Similarly clearing of site by removal of dismantled belt structures of another 3 pillars and additional 22 mtrs., which includes 41 foot stools, 82 structures, 123 top brackets, 369 top rollers and 41 bottom rollers, pipes of 4-inch size of about 18 nos. from-39L/20R to 10 mtrs from -35L/20R towards -36L/20R
Unlapping pulling out and removal of 1 pillar 64 mtr. long, 1200mm PVC belting for clearing of site at -40L/20R of 20R Belt Conveyor (pillar size is 32 mtr. centre to centre)
Similarly, Unlapping, pulling out and removal of another 236 mtr. 1200mm PVC belting from -40L/20R to 10 mtrs from -35L/20R towards -36L/20R
Transportation and installation of Tail-end Unit Complete with dust collector of 20R belt conveyor (in 3 times from-40L/20R to about 10 mtrs from -35L/20R towards -36L/20R)
Total impact of GST for the purpose of CTC
F.R. ENTERPRISE
K R ENTERPRISE
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .