Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC AT HAZARIMORE P O HAZARI GOMIA DISTT BOKARO JHARKHAND 829128 | GOMIA | BOKARO | JHARKHAND | 829128 | ₹2.3 L | L1 | Accepted-AOC All documents submitted and found O.K. Comparative lower rate |
| 2 | L2₹2.3 LRejected-Finance | ₹2.3 L | L2 | Rejected-Finance Comparative higher rate |
| 3 | L3₹2.4 LRejected-Finance | ₹2.4 L | L3 | Rejected-Finance Comparative higher rate |
| Sl No | Description | Qty | Unit | M/S SHRI SHYAM ENTERPRISES L1 | M/S DEVDEEPCONSTRUCTION L3 | MAA ENGINEERING AND CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.01 | Dismantling of 2C x 25 sqr.mm + 1C x 25 sqr.mm AB Cable | 600 | mtr. | 47 ₹28,200 | 52 ₹31,200 | 50 ₹30,000 |
| 1.02 | Supply of 2C x 25 sqr.mm + 1C x 25 sqr.mm AB Cable | 200 | mtr. | 160 ₹32,000 | 165 ₹33,000 | 162 ₹32,400 |
| 1.03 | Dismantling oa all accessories like clamp, pressing connector, suspension, nut bolt and etc. as per required | 120 | set | 448 ₹53,760 | 452 ₹54,240 | 450 ₹54,000 |
| 1.04 | Supply and erection of all accessories like clamp, pressing connector, suspension, nut bolt and etc. as per required | 48 | set | 950 ₹45,600 | 958 ₹45,984 | 955 ₹45,840 |
| 1.05 | Dismantling of street light | 35 | mtr. | 441 ₹15,435 | 450 ₹15,750 | 445 ₹15,575 |
| 1.06 | Erection of street light | 35 | Pcs. | 526 ₹18,410 | 535 ₹18,725 | 530 ₹18,550 |
| 1.07 | Supply of contactor ML-4 and digital timer (Railway Siding) | 1 | set | 22,400 ₹22,400 | 22,410 ₹22,410 | 22,405 ₹22,405 |
| 1.08 | Supply of contactor ML-4 and digital timer (Fitter Tola) | 1 | set | 14,600 ₹14,600 | 14,610 ₹14,610 | 14,605 ₹14,605 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | No. | - | - | - |
Tender Value
₹2.7 L
EMD Value
₹3,400
Closing Date
2 Mar 2026, 11:00 amClosed
Abhijeet Mahto, Sr. Manager(EnM), Sawang Washery
Office of the Project Officer, Sawang Washery
Repairing of Damaged Ab cable installed for street light in different colonies like fitter tola, Officers Colony, A Type, B type and power supply from ETP to Rail In motion Weighbridge under Sawang Washery.
2026_CCL_353941_1
SGW/KTA/ENM/E-Tender/25-26/93 Date 20.02.2026
Open Tender
Electrical and Maintenance Works
7 days
Office of the Project Officer, Sawang Washery
Please refer Tender documents.
9 documents required · 9 mandatory
₹3,400
11 Mar 2026
20 Feb 2026
3 Mar 2026
21 Feb 2026
2 Mar 2026
21 Feb 2026
21 Feb 2026 - 27 Feb 2026
Dismantling of 2C x 25 sqr.mm + 1C x 25 sqr.mm AB Cable
Supply of 2C x 25 sqr.mm + 1C x 25 sqr.mm AB Cable
Dismantling oa all accessories like clamp, pressing connector, suspension, nut bolt and etc. as per required
Supply and erection of all accessories like clamp, pressing connector, suspension, nut bolt and etc. as per required
Dismantling of street light
Erection of street light
Supply of contactor ML-4 and digital timer (Railway Siding)
Supply of contactor ML-4 and digital timer (Fitter Tola)
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 3.46 MB
BOQ_366754.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid